| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.4 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹24.7 L+₹24,561.40 (1.01%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹24.8 L+₹36,691 (1.50%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | L4₹25.0 L+₹51,686.93 (2.11%)Admitted-Finance | L4 | Admitted-Finance | |
| 5 | L5₹25.3 L+₹85,479.71 (3.50%)Admitted-Finance | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Munshi Lal L5 | shikshapump and boring works L3 | SRIJAN CONSTRUCTION L4 | M/S BRAJENDRA KUMAR SINGH L1 | ARGALESHWAR ENTERPRISES L2 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in Excavation in Ordinary Soil by poclain M/C and shifting of Excavated Soil with Tractor Trolly | 27,793.04 | Cum | 59 ₹16,39,789.48 | 57.61 ₹16,01,157.15 | 57.96 ₹16,10,884.71 | 56.76 ₹15,77,533.06 Lowest | 57.33 ₹15,93,375.1 |
| 2.00 | Earth work in Excavation in Ordinary Soil by Manual Labour and shifting of Excavated Soil with Tractor Trolly | 4,904.65 | Cum | 60 ₹2,94,279.3 | 58.53 ₹2,87,069.46 | 58.88 ₹2,88,786.09 | 57.66 ₹2,82,802.41 Lowest | 58.24 ₹2,85,647.11 |
| 3.00 | Dressing Of Earth On Bund As Per ID S.O.R. Chap-V Sl. No. 17 | 22,081.8 | Cum | 10 ₹2,20,818 | 10.06 ₹2,22,142.91 | 10.12 ₹2,23,467.82 | 9.91 ₹2,18,830.64 Lowest | 10.01 ₹2,21,038.82 |
| 4.00 | Dewatering chargess before Digging By 5.0 H.P.Diesel Pump set with P.O.L. & operetor | 25 | Hrs. | 130 ₹3,250 | 128.03 ₹3,200.75 | 128.8 ₹3,220 | 126 ₹3,150 Lowest | 127.4 ₹3,185 |
| 5.00 | Earth work in excavation in foundations | 61.2 | Cum | 75 ₹4,590.15 | 75.45 ₹4,617.69 | 75.9 ₹4,645.23 | 74 ₹4,528.95 Lowest | 75.08 ₹4,594.74 |
| 6.00 | Cement Concrete (1:3:6) cement, Sand & 20-40 mm Brick Ballast for foundation Inlet I/c cost of materials labour etc. | 15.13 | Cum | 3,600 ₹54,471.6 | 3,540.44 ₹53,570.4 | 3,561.73 ₹53,892.6 | 3,488.18 ₹52,779.65 Lowest | 3,523.02 ₹53,306.81 |
| 7.00 | Brick work in 1:4 cement sand work I/c cost of materials labour etc. | 26.85 | Cum | 4,900 ₹1,31,555.2 | 4,849.62 ₹1,30,202.6 | 4,878.79 ₹1,30,985.7 | 4,778.03 ₹1,28,280.55 Lowest | 4,825.76 ₹1,29,561.93 |
| 8.00 | Laying andSupply of 900 mm NP3 hume pipe with collar including laying ( with carraige 15% ) with collar | 40 | Rm | 4,050 ₹1,62,000 | 3,997.5 ₹1,59,900 | 4,021.55 ₹1,60,862 | 3,938.5 ₹1,57,540 Lowest | 3,977.84 ₹1,59,113.5 |
| 9.00 | P.C.C. 1:2:4 Cement,C.sand & 20 mm S. Grite I/c cost of materials labour etc. | 1.07 | Cum | 5,550 ₹5,966.25 | 5,485.3 ₹5,896.7 | 5,518.29 ₹5,932.16 | 5,404.32 ₹5,809.64 Lowest | 5,458.31 ₹5,867.68 |
| 10.00 | Struck pointing in 1:2 cement sand mortar I/c cost of materials labour etc. | 74.7 | Sqm | 99 ₹7,395.2 | 100.07 ₹7,475.13 | 100.68 ₹7,520.4 | 98.6 ₹7,365.32 Lowest | 99.58 ₹7,438.62 |
Tender Value
Refer Docs
EMD Value
₹2.7 L
Closing Date
27 Feb 2021, 10:00 amClosed
Executive Engineer Minor Irrigation Division Prj
Office of the Executive Engineer Minor Irrigation Division 321/1 shivkuti teliyarganj Prayagraj
Digging And Renovation Of ,Bandhawa Pond,at villege Lakadi ,Bhitaura, Fatehpur
2021_UPMID_557691_1
1648/M.I./Ac/N.Suchna/20-21 Dt 12.02.21
Open Tender
Civil Works
Item Rate
30 days
villege Lakadi, Bhitaura
as per tender notice
2 documents required · 2 mandatory
₹900
Executive Engineer Minor Irrigation Division Prj
₹2.7 L
Yes
12 Mar 2021
22 Feb 2021
4 Mar 2021
22 Feb 2021
27 Feb 2021
22 Feb 2021
22 Feb 2021 - 26 Feb 2021
Amount
Earth work in Excavation in Ordinary Soil by poclain M/C and shifting of Excavated Soil with Tractor Trolly
Earth work in Excavation in Ordinary Soil by Manual Labour and shifting of Excavated Soil with Tractor Trolly
Dressing Of Earth On Bund As Per ID S.O.R. Chap-V Sl. No. 17
Dewatering chargess before Digging By 5.0 H.P.Diesel Pump set with P.O.L. & operetor
Earth work in excavation in foundations
Cement Concrete (1:3:6) cement, Sand & 20-40 mm Brick Ballast for foundation Inlet I/c cost of materials labour etc.
Brick work in 1:4 cement sand work I/c cost of materials labour etc.
Laying andSupply of 900 mm NP3 hume pipe with collar including laying ( with carraige 15% ) with collar
P.C.C. 1:2:4 Cement,C.sand & 20 mm S. Grite I/c cost of materials labour etc.
Struck pointing in 1:2 cement sand mortar I/c cost of materials labour etc.
Dry stone boulder filing I/C cost of material labour etc.
B.O.E. Soaling With S.O.B. Bricks
ARGALESHWAR ENTERPRISES
shikshapump and boring works
SRIJAN CONSTRUCTION
Munshi Lal
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .