Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹7.0 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹7.8 L+₹77,962.83 (11.1%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹9.6 L+₹2.6 L (37.3%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹9.7 L+₹2.6 L (37.8%)Admitted-Finance | L4 | Admitted-Finance | ||
| 5 | L5₹9.7 L+₹2.7 L (38.0%)Admitted-Finance | L5 | Admitted-Finance |
Tender Value
₹9.8 L
EMD Value
₹19,600
Closing Date
28 Jul 2026, 4:00 pmClosed
XEN REW Kathua
XEN REW Kathua
Construction of Drain/Diversion Channel alongwith Crate work at ward no 2, mohalla Birkham Block Dhar Mahanpur
2026_RDPR_316308_1
e-NIT No.118/REW/K of 2026-27 Dated 16/07/2026
Open Tender
Civil Works
Percentage
90 days
Dhar Mahanpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Rural Development and Panchayati Raj
₹19,600
6 Aug 2026
16 Jul 2026
29 Jul 2026
16 Jul 2026
28 Jul 2026
16 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 min width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides andramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directedDrain | 65 | cum | 479.3 | ₹31,154.5 |
| 2 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 min width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides andramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed Crate | 85 | cum | 479.3 | ₹40,740.5 |
| 3 | Providing and laying in position cement concrete of specified grade including curing butexcluding the cost of centring and shuttering. All work upto plinth level with with 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 2.2 | cum | 4,826.5 | ₹10,618.3 |
| 4 | Providing and laying in position cement concrete of specified grade including curing butexcluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)(20% boulders) | 54.5 | cum | 4,774.46 | ₹2,60,208.07 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete. | 182 | sqm | 286.35 | ₹52,115.7 |
| 6 | Providing and Laying 50 mm thick flooring with cement concrete 1:2:4 (1 cement:2 coarse sand: 4 graded stone aggregate 20 mm nominal size) and curing complete | 67 | sqm | 416.5 | ₹27,905.5 |
| 7 | Hand-packing stones in wire-crates; excluding cost of crates and stones | 197 | m3 | 371.15 | ₹73,116.55 |
| 8 | Dumping stone excluding cost of stones | 3.78 | m3 | 237.9 | ₹899.26 |
| 9 | Supply of stone | 170.66 | m3 | 700 | ₹1,19,464.1 |
| 10 | Supply of steel wire crates made of Mesh type 10x12 (D=100 mm) Zn+10% Al alloy . Mesh wire diameter 2.70/3.70 mm (ID/OD). | 23 | Each | 6,000 | ₹1,38,000 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.95 MB
BOQ_1030735.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .