| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.9 LAccepted-AOC | L1 | Accepted-AOC Lowest Rate Bidder. | |
| 2 | L2₹10.0 L+₹9,782 (0.99%)Rejected-Finance | L2 | Rejected-Finance Second lowest | |
| 3 | L3₹10.7 L+₹73,908 (7.45%)Rejected-Finance | L3 | Rejected-Finance Third lowest | |
| 4 | L4₹10.7 L+₹75,076 (7.57%)Rejected-Finance | L4 | Rejected-Finance Fourth lowest | |
| 5 | L5₹10.7 L+₹78,963 (7.96%)Rejected-Finance | L5 | Rejected-Finance Fifth lowest |
Tender Value
₹12.0 L
EMD Value
₹7,000
Closing Date
28 Sept 2019, 3:00 pmClosed
EE STC KHANDWA
MPEB CAMPUS Anand Nagar Khandwa
WORK for Shifting and dismantling of 33 KV Line Awaliya doob kshetra At Village Awaliya of Roshni Dc under Khandwa OnM Division II. Sanction Project by OnM Dn KHANDWA II Project No 208315 dt 22.05.19.
2019_MPPKV_51236_1
EE/STC/WORKS/19-20/ TS-02/1528
Open Tender
Electrical Works
Item Rate
60 days
Village Awaliya under Roshni DC
Please refer tender documents
9 documents required · 9 mandatory
₹1,120
RAO Khandwa
₹7,000
O/o EE STC Khandwa Division
25 Feb 2020
17 Sept 2019
1 Oct 2019
17 Sept 2019
28 Sept 2019
23 Sept 2019
18 Sept 2019 - 21 Sept 2019
23 Sept 2019
Amount
Work Execute by Contractor on labour contract basis
Survey and layout of 33/11 KV s/s during execution of work
Other Line Material Transportation
Trimming of trees
Pole Pit digging H-BEAM /R S Joist 175x85 mm13 Mtr hard Soil
Transportation of H-Beam 152x152x37.1 Kg/mtr. 0 to 1 Km from road side
Transportation of H-Beam 152x152x37.1 Kg/mtr. Additional Charges per Km. (Max. 2 Km.)
Pole erection complete with earthing Rail Pole / H-Beam 13 Mtr
labour charges of Concreting of poles.Including base pedding & muffing with Material 1:3:6 Ratio R S Joist / Rail Pole / H.Beam 13 Mtr 0.94 Cmt.
Stay Pit Digging (For 16mm/20mm/25mm Stay Set)-size (5'x2.5 'x 5')= 62.50 sq. feet for Soft Rock /Hard Soil .
Stay set erection 20 mm (Complete with binding of stay wire at eye bolt , stay insulator and anchor rod)
labour charges of Concreting of Stay set 20 mm- 0.30 cmt
Fixing of D. C.Cross arm 5' Centre along with plates, 6 nos. H/Ws, 6 Nos. Disc Insulators and fixing of supporting clamps on both the poles.
FIXING OF 33KV SPECIAL BRACKET
Fixing of 33 KV V-Cross arm with top clamp
Dismentaling of 33 KV V-Cross arm with top clamp
Fixing of 33KV Top clamp
Fixing of 33 KV Pin Insulator
Dismentaling of 33 KV Pin Insulator
Fixing of Disc Insulator with H/ W 11 KV side
Stringing of Conductor - 33 KV Line with Dog Conductor ( 3 No. Conductor )
Dismentaling of Conductor - 33 KV Line with Dog Conductor ( 3 No. Conductor )
33 KV CARPET GUARDING
Fixing of Anti climbing devices
Fixing of Danger Bord
Panting with material
Jumpering work at D. P. and Transformer
JITENDRA GYANESHWAR PATIL
MAHESH KUMAR SONGARE
SHRI SHRI SAI ENTERPRISES
M/s. I.C. Jain
RAJKUMAR GUPTA
Aliv Power And Constructions
MOHAMMED ZUBER KHAN
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .