Loading…
Loading…
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹4.2 L
EMD Value
₹4,240
Closing Date
23 Oct 2026, 5:00 pm5d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Divisional Officer
RURAL WORKS DIVISION, DEOGARH
PS Building at Barkote for the year 2026-27_building
2026_CERWI_143560_1
SERWDGH-Online-13 of 2026-27
Open Tender
Civil Works - Buildings
Percentage
60 days
Debagada
2 documents required · 2 mandatory
₹2,000
₹4,240
Yes
15 Oct 2026
15 Oct 2026
26 Oct 2026
15 Oct 2026
23 Oct 2026
15 Oct 2026
15 Oct 2026 - 22 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Distempering two coats to wall with approved distemper of approved shade including cost, conveyance & taxes of all material, labour etc complete including 1% cess and as per specification and direction of the Engineer-in-charge.Ground Floor | 446.48 | sqm | 89.26 | ₹39,852.89 |
| 2 | First Floor | 497.43 | sqm | 91.41 | ₹45,469.98 |
| 3 | Second Floor | 267.92 | sqm | 93.61 | ₹25,080.37 |
| 4 | Weather coat two coats including cost, conveyance & taxes of all material, all labour and T & P required for the work complete including 1% cess as per direction of the Engineer-in-charge.Ground Floor | 219.02 | sqm | 98.7 | ₹21,616.78 |
| 5 | First Floor | 183.86 | sqm | 102.41 | ₹18,828.8 |
| 6 | Second Floor | 233.65 | sqm | 106.3 | ₹24,836.46 |
| 7 | Supplying Fitting, fixing up fully glazed aluminium framed window (sliding type) made up aluminium section 9778 as window frame, section 4095, 4096 and 9777, 3994 as shutter frame with 5mm black glass as panel fitted with rubber beading including locking arrangement including all fitting including cost of all materials, all taxes, labour, T&P excluding cost of glass etc. complete as per direction of the Engineer-in-charge ,Ground Floor,Cost of AI Frame | 17.08 | sqm | 3,906 | ₹66,714.48 |
| 8 | Cost of 5 mm thick Black Glass including Wastages | 17.08 | sqm | 900.7 | ₹15,383.96 |
| 9 | First Floor,Cost of AI Frame | 21.82 | sqm | 3,906 | ₹85,228.92 |
| 10 | Cost of 5 mm thick Black Glass including Wastages | 21.82 | sqm | 900.7 | ₹19,653.27 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 1.25 MB
Tendernotice_1.pdf
PDF • 2.15 MB
BOQ_614062.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .