Loading…
Loading…
Tender Value
₹2.2 Cr
EMD Value
₹4.4 L
Closing Date
4 Aug 2026, 3:00 pm
Telecom work of cable shifting and provision of other telecom assets in connection to proposed engineering work of safety fencing (Anti crash barrier/ tie knot fencing along the track including provision of pedestrian / cattle subway) in Kalyan - Karjat - Lonavala, Karjat - Khopoli, Kalyan - Igatpuri, CSMT - Panvel, Thane - Vashi, Diva - Panvel - Roha section of Mumbai division.
CR-BB-TELE-2026-70
CR-BB-TELE-2026-70
Open
12 Months
Mumbai, Maharashtra
₹0
₹4.4 L
2 Jul 2026
2 Jul 2026
21 Jul 2026
Excavation of cable trench as per cable route plan,1.0 mt. deep and 300mm wide along side the track in normal soil/strata, conforming to distances as per cable route plan and refilling after cable laying. This work includes covering of cable laid in trench by loose soil for a layer 01 of 50mm thickness after clearing of route,bushes etc. It shall be ensured that top of the cables laid is at a depth of 0.8m or more. It if is less, then the width and depth shall be suitably increased and accordingly proportionate payment shall be made. In case depth of trench is not achievable due to site conditions proportionate payment will be made as per procedure. The work shall be done as per the extant practice on Central Railway, instructions of Railway Engineer at site and as per guidelines in chapter IV of tender document. Inspection by consignee.
Digging of trench 1.0 M deep from rail flange/road level (for LC) and 0.3Mtrs. to 0.6 Mtrs wide and back filling after placing of DWC/RCC/GI pipe.(Placing of DWC/RCC/GI pipe covered 02 separately. The ballast disturbed be screened and dressed as required by Engineer-in-charge or his representatives and road tarred immediately. The work shall be done as per the extant practice on Central Railway, instructions of Railway Engineer at site and as per guidelines in chapter IV of tender document. Inspection by consignee.
Laying of DWC/RCC pipes alongwith collars/RCC Half round pipes in trenches at 03 places of track and road crossings, platform cuttings etc. The work shall be done as per the extant practice on Central Railway, instructions of Railway Engineer at site and as per guidelines in chapter IV of tender document. Inspection by consignee.
Laying of signalling/Power/Telecom cable of various cores/sizes in trenches. The work shall be done as per the extant practice on Central Railway, instructions of Railway Engineer at site and as per guidelines in chapter IV of tender document. Inspection by consignee.
Supply of Heat Thermoshrink TSF-2 joint kits for 20/50 pairs jelly filled cable. RDSO/SPN/TC/57/2015, Revision-l or latest. Inspection by consignee.
Supply of Thermo shrink Cable Jointing kit (Reinforced) TSF-2 type generally 06 conforming to RDSO specification RDSO/SPN/TC/57/2015 Rev 1 with modified kit contents as per CSTE's Specification No.CR/SPN/TC/57(A)/2015 Dt. 06.01.2015(Table-A) to be suitable for jointing both 10/20/50 pair PIJF and 4/6 Quad cables along with sub-kit (Table-B) for armour continuity. Inspection by consignee.
Clamping of cable/cable pipes in hilly areas/rock cutting area/tunnels/ on bridges as per guidelines in Chapter-IV (Specifications for Execution of Works) of the Tender Document and instructions of Railway site supervisor. Inspection by consignee.
Cutting of all types of Roads/ platforms (ecxcept concrete type) for trenching and 08 excavation to depth of 300mmx300mm wide approx. and refilling after laying of RCC/GI /DWC pipe & to restore them to original condition. The work shall be done as per the extant practice on Central Railway, instructions of Railway Engineer at site and as per guidelines in chapter IV of tender document. Inspection by consignee.
Supply of CABLE ROUTE TRACER for tracing existing cable route and depth make: Stanley/MEGGER/Rycom or similar. Inspection by consignee.
Supply of cable route marker as per RST/C/203A of FRP. Inspection by consignee.
Placing and securing of cable route markers in trenches at the specified interval and at diversions, joints etc along the cable route. The work shall be done as per extant practice on C Railways & the instruction of Rly engineer at site. Inspection by consignee.
Supply of W 963 ply safe tape EPR high voltage self fusing permanent insulating jacketing tape in 50.8mm x 0.75mm , 9.1 mtrs roll for used up to 69kv Make STANVAC, ICC or SCAPA. Inspection by consignee.
Making of Thermoshrink straighht through/derivation/ transformer /PIJF cable joint for underground jelly filled cable 6 quad/4quad/20 pair 10 pair etc. PIJF cable as per the instruction of Rly engineer at site. Inspection by consignee. Above/
Laying of HDPE duct in trench and its protective work as per direction of site engineer. Inspection by consignee.
Blowing/Drawing of OFC cable in HDPE/DWC duct and protective work, as per direction of site engineer. Inspection by consignee.
Splicing and termination of 48 Fiber OFC (2x48 Fibers) and testing. This include excavation of pit and its back filling & all relevent type of materials for splicing. (Splice enclose will be supplied by Railways.) Inspection by consignee.
Supply of 48 Fiber OFC Joint Closure similar to Specification No. RDSO/SPN/TC/68/2014 Rev 1.0 or latest including sealing with mechanical clamps. Inspection by consignee.
Supply of 48F FDMS E2000/APC with pigtails. Inspection by consignee. Above/
Excavation of cable trench as per cable route plan,1.0 mt. deep and 300mm wide along side the track in normal soil/strata, conforming to distances as per cable route plan and refilling after cable laying. This work includes covering of cable laid in trench by loose soil for a layer 01 of 50mm thickness after clearing of route,bushes etc. It shall be ensured that top of the cables laid is at a depth of 0.8m or more. It if is less, then the width and depth shall be suitably increased and accordingly proportionate payment shall be made. In case depth of trench is not achievable due to site conditions proportionate payment will be made as per procedure. The work shall be done as per the extant practice on Central Railway, instructions of Railway Engineer at site and as per guidelines in chapter IV of tender document. Inspection by consignee.
Digging of trench 1.0 M deep from rail flange/road level (for LC) and 0.3Mtrs. to 0.6 Mtrs wide and back filling after placing of DWC/RCC/GI pipe.(Placing of DWC/RCC/GI pipe covered 02 separately. The ballast disturbed be screened and dressed as required by Engineer-in-charge or his representatives and road tarred immediately. The work shall be done as per the extant practice on Central Railway, instructions of Railway Engineer at site and as per guidelines in chapter IV of tender document. Inspection by consignee.
Laying of DWC/RCC pipes alongwith collars/RCC Half round pipes in trenches at 03 places of track and road crossings, platform cuttings etc. The work shall be done as per the extant practice on Central Railway, instructions of Railway Engineer at site and as per guidelines in chapter IV of tender document. Inspection by consignee.
Laying of signalling/Power/Telecom cable of various cores/sizes in trenches. The work shall be done as per the extant practice on Central Railway, instructions of Railway Engineer at site and as per guidelines in chapter IV of tender document. Inspection by consignee.
Supply of Heat Thermoshrink TSF-2 joint kits for 20/50/ pairs jelly filled cable. RDSO/SPN/TC/57/2015, Revision-l or latest. Inspection by consignee.
Supply of Thermo shrink Cable Jointing kit (Reinforced) TSF-2 type generally 06 conforming to RDSO specification RDSO/SPN/TC/57/2015 Rev 1 with modified kit contents as per CSTE's Specification No.CR/SPN/TC/57(A)/2015 Dt. 06.01.2015(Table-A) to be suitable for jointing both 10/20/50 pair PIJF and 4/6 Quad cables along with sub-kit (Table-B) for armour continuity. Inspection by consignee.
Clamping of cable/cable pipes in hilly areas/rock cutting area/tunnels/ on bridges as per guidelines in Chapter-IV (Specifications for Execution of Works) of the Tender Document and instructions of Railway site supervisor. Inspection by consignee.
Cutting of all types of Roads/ platforms (ecxcept concrete type) for trenching and 08 excavation to depth of 300mmx300mm wide approx. and refilling after laying of RCC/GI /DWC pipe & to restore them to original condition. The work shall be done as per the extant practice on Central Railway, instructions of Railway Engineer at site and as per guidelines in chapter IV of tender document. Inspection by consignee.
Supply of CABLE ROUTE TRACER for tracing existing cable route and depth make: anley/MEGGER/Rycom. Inspection by consignee.
Supply of cable route marker as per RST/C/203A of FRP. Inspection by consignee.
Placing and securing of cable route markers in trenches at the specified interval and at diversions, joints etc along the cable route. The work shall be done as per extant practice on C Railways & the instruction of Rly engineer at site. Inspection by consignee.
Supply of W 963 ply safe tape EPR high voltage self fusing permanent insulating jacketing tape in 50.8mm x 0.75mm , 9.1 mtrs roll for used up to 69kv Make STANVAC, ICC or SCAPA. Inspection by consignee.
Making of Thermoshrink straighht through/derivation/ transformer /PIJF cable joint for underground jelly filled cable 6 quad/4quad/20 pair 10 pair etc. PIJF cable as per the instruction of Rly engineer at site. Inspection by consignee. Above/
Laying of HDPE duct in trench and its protective work as per direction of site engineer. Inspection by consignee.
Blowing/Drawing of OFC cable in HDPE/DWC duct and protective work, as per direction of site engineer. Inspection by consignee.
Splicing and termination of 48 Fiber OFC (2x48 Fibers) and testing. This include excavation of pit and its back filling & all relevent type of materials for splicing. (Splice enclose will be supplied by Railways.) Inspection by consignee.
Supply of 48 Fiber OFC Joint Closure similar to Specification No. RDSO/SPN/TC/68/2014 Rev 1.0 or latest including sealing with mechanical clamps. Inspection by consignee.
Supply of 48F FDMS E2000/APC with pigtails. Inspection by consignee. Above/
Excavation of cable trench as per cable route plan,1.0 mt. deep and 300mm wide along side the track in normal soil/strata, conforming to distances as per cable route plan and refilling after cable laying. This work includes covering of cable laid in trench by loose soil for a layer 01 of 50mm thickness after clearing of route,bushes etc. It shall be ensured that top of the cables laid is at a depth of 0.8m or more. It if is less, then the width and depth shall be suitably increased and accordingly proportionate payment shall be made. In case depth of trench is not achievable due to site conditions proportionate payment will be made as per procedure. The work shall be done as per the extant practice on Central Railway, instructions of Railway Engineer at site and as per guidelines in chapter IV of tender document. Inspection by consignee.
Digging of trench 1.0 M deep from rail flange/road level (for LC) and 0.3Mtrs. to 0.6 Mtrs wide and back filling after placing of DWC/RCC/GI pipe.(Placing of DWC/RCC/GI pipe covered 02 separately. The ballast disturbed be screened and dressed as required by Engineer-in-charge or his representatives and road tarred immediately. The work shall be done as per the extant practice on Central Railway, instructions of Railway Engineer at site and as per guidelines in chapter IV of tender document. Inspection by consignee.
Laying of DWC/RCC pipes alongwith collars/RCC Half round pipes in trenches at 03 places of track and road crossings, platform cuttings etc. The work shall be done as per the extant practice on Central Railway, instructions of Railway Engineer at site and as per guidelines in chapter IV of tender document. Inspection by consignee.
Laying of signalling/Power/Telecom cable of various cores/sizes in trenches. The work shall be done as per the extant practice on Central Railway, instructions of Railway Engineer at site and as per guidelines in chapter IV of tender document. Inspection by consignee.
Supply of Heat Thermoshrink TSF-2 joint kits for 20/50/ pairs jelly filled cable. RDSO/SPN/TC/57/2015, Revision-l or latest. Inspection by consignee.
Supply of Thermo shrink Cable Jointing kit (Reinforced) TSF-2 type generally conforming to RDSO specification RDSO/SPN/TC/57/2015 Rev 1 with modified kit contents as per CSTE's Specification No.CR/SPN/TC/57(A)/2015 Dt. 06.01.2015(Table-A) to be suitable for jointing both 10/20/50 pair PIJF and 4/6 Quad cables along with sub-kit (Table-B) for armour continuity. Inspection by consignee.
Supply of CABLE ROUTE TRACER for tracing existing cable route and depth make: Stanley/MEGGER/Rycom. Inspection by consignee.
Supply of cable route marker as per RST/C/203A of FRP. Inspection by consignee.
Placing and securing of cable route markers in trenches at the specified interval and at diversions, joints etc along the cable route. The work shall be done as per extant practice on C Railways & the instruction of Rly engineer at site. Inspection by consignee.
Supply of W 963 ply safe tape EPR high voltage self fusing permanent insulating jacketing tape in 50.8mm x 0.75mm , 9.1 mtrs roll for used up to 69kv Make STANVAC, ICC or SCAPA. Inspection by consignee.
Making of Thermoshrink straighht through/derivation/ transformer /PIJF cable joint for underground jelly filled cable 6 quad/4quad/20 pair 10 pair etc. PIJF cable as per the instruction of Rly engineer at site. Inspection by consignee. Above/
Laying of HDPE duct in trench and its protective work as per direction of site engineer. Inspection by consignee.
Blowing/Drawing of OFC cable in HDPE/DWC duct and protective work, as per direction of site engineer. Inspection by consignee.
Splicing and termination of 48 Fiber OFC (2x48 Fibers) and testing. This include excavation of pit and its back filling & all relevent type of materials for splicing. (Splice enclose will be supplied by Railways.) Inspection by consignee.
Supply of 48 Fiber OFC Joint Closure similar to Specification No. RDSO/SPN/TC/68/2014 Rev 1.0 or latest including sealing with mechanical clamps. Inspection by consignee.
Supply of 48F FDMS E2000/APC with pigtails. Inspection by consignee. Above/
Excavation of cable trench as per cable route plan,1.0 mt. deep and 300mm wide along side the track in normal soil/strata, conforming to distances as per cable route plan and refilling after cable laying. This work includes covering of cable laid in trench by loose soil for a layer 01 of 50mm thickness after clearing of route,bushes etc. It shall be ensured that top of the cables laid is at a depth of 0.8m or more. It if is less, then the width and depth shall be suitably increased and accordingly proportionate payment shall be made. In case depth of trench is not achievable due to site conditions proportionate payment will be made as per procedure. The work shall be done as per the extant practice on Central Railway, instructions of Railway Engineer at site and as per guidelines in chapter IV of tender document. Inspection by consignee.
Digging of trench 1.0 M deep from rail flange/road level (for LC) and 0.3Mtrs. to 0.6 Mtrs wide and back filling after placing of DWC/RCC/GI pipe.(Placing of DWC/RCC/GI pipe covered separately. The ballast disturbed be screened and dressed as required by Engineer-in-charge or his representatives and road tarred immediately. The work shall be done as per the extant practice on Central Railway, instructions of Railway Engineer at site and as per guidelines in chapter IV of tender document. Inspection by consignee.
Laying of DWC/RCC pipes alongwith collars/RCC Half round pipes in trenches at 03 places of track and road crossings, platform cuttings etc. The work shall be done as per the extant practice on Central Railway, instructions of Railway Engineer at site and as per guidelines in chapter IV of tender document. Inspection by consignee.
Laying of signalling/Power/Telecom cable of various cores/sizes in trenches. The work shall be done as per the extant practice on Central Railway, instructions of Railway Engineer at site and as per guidelines in chapter IV of tender document. Inspection by consignee.
Supply of Heat Thermoshrink TSF-2 joint kits for 20/50/ pairs jelly filled cable. RDSO/SPN/TC/57/2015, Revision-l or latest. Inspection by consignee.
Supply of Thermo shrink Cable Jointing kit (Reinforced) TSF-2 type generally 06 conforming to RDSO specification RDSO/SPN/TC/57/2015 Rev 1 with modified kit contents as per CSTE's Specification No.CR/SPN/TC/57(A)/2015 Dt. 06.01.2015(Table-A) to be suitable for jointing both 10/20/50 pair PIJF and 4/6 Quad cables along with sub-kit (Table-B) for armour continuity. Inspection by consignee.
Clamping of cable/cable pipes in hilly areas/rock cutting area/tunnels/ on bridges as per guidelines in Chapter-IV (Specifications for Execution of Works) of the Tender Document and instructions of Railway site supervisor. Inspection by consignee.
Supply of CABLE ROUTE TRACER for tracing existing cable route and depth make: Stanley/MEGGER/Rycom. Inspection by consignee.
Supply of cable route marker as per RST/C/203A of FRP. Inspection by consignee.
Placing and securing of cable route markers in trenches at the specified interval and at diversions, joints etc along the cable route. The work shall be done as per extant practice on C Railways & the instruction of Rly engineer at site. Inspection by consignee.
Supply of W 963 ply safe tape EPR high voltage self fusing permanent insulating jacketing tape in 50.8mm x 0.75mm , 9.1 mtrs roll for used up to 69kv Make STANVAC, ICC or SCAPA. Inspection by consignee.
Making of Thermoshrink straighht through/derivation/ transformer /PIJF cable joint for underground jelly filled cable 6 quad/4quad/20 pair 10 pair etc. PIJF cable as per the instruction of Rly engineer at site. Inspection by consignee. Above/
Laying of HDPE duct in trench and its protective work as per direction of site engineer. Inspection by consignee.
Blowing/Drawing of OFC cable in HDPE/DWC duct and protective work, as per direction of site engineer. Inspection by consignee.
Splicing and termination of 48 Fiber OFC (2x48 Fibers) and testing. This include excavation of pit and its back filling & all relevent type of materials for splicing. (Splice enclose will be supplied by Railways.) Inspection by consignee.
Supply of 48 Fiber OFC Joint Closure similar to Specification No. RDSO/SPN/TC/68/2014 Rev 1.0 or latest including sealing with mechanical clamps. Inspection by consignee.
Supply of 48F FDMS E2000/APC with pigtails. Inspection by consignee.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
GCC-2022-withACS10.pdf
ATTACHMENT
ACS11GCCWorks_compressed.pdf
ATTACHMENT
CR Specifications for Jointing Kit
ATTACHMENT
Tender Documents
ATTACHMENT
CRSPNTSFJointingkit-TC-57A-2015dtd.06.01.20150001.pdf
ATTACHMENT
2026-70TenderDocumentsFencing02072026.pdf
ATTACHMENT
Download all tender documents and submit your bid