Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 CrAccepted-AOC NO 4 748 5 MAHALAKSHMI NAGAR 7D STREET 3RD CROSS STREET KANNANENDHAL MADURAI NORTH K PUDUR MADURAI 625 007 | MADURAI | MADURAI | TAMIL NADU | 625007 | ₹1.6 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.7 Cr+₹9.5 L (5.79%)Rejected-AOC SUBHADARSAN PARK NO 3 VEERIYAMPALAYAM KALAPATTI COIMBATORE 641 048 | COIMBATORE | TAMIL NADU | 638459 | ₹1.7 Cr+₹9.5 L (5.79%) | L2 | Rejected-AOC L2 |
Tender Value
₹1.7 Cr
EMD Value
₹1.7 L
Closing Date
19 Jan 2024, 3:00 pmClosed
Commissioner Madurai Corporation
Aringar anna maligai
SUPPLY DELIVERY AND INSTALLATION OF VERTICAL SUBMERSIBLE CENTRIFUGAL NON CLOG PUMP HORIZONTAL SPLIT CASTING CENTRIFUGAL PUMP WITH MOTOR PANEL BOARD WTP PUMPING STATION
2024_MAWS_408002_1
E1/ Est. No. 015405 (CGF) / 23-24
Open Tender
Civil Works
Lump-sum
60 days
Madurai
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹1.7 L
22 Feb 2024
10 Jan 2024
19 Jan 2024
10 Jan 2024
19 Jan 2024
10 Jan 2024
Amount
Removal of centrifugal pumpset/ jet pumps/ submersible pumpsets and its accessories from borewell/ open well for attending repairs 50% of the rates mentioned under item 17 (a), (b) and (c) may be allowed for the respective Horse power.
Replacement of Underground Utilities (PVC Pipe) damaged during earthwork excavation for pipe laying works including cost of additional earthwork excavation in all soil strata, including BT/CC road cutting, removal of slushy soil and replacing the pipeline with sound pipe, including supply and delivery of PVC pipes, couplers, jointing materials and required specials, cutting, conveying , laying, jointing and cost of refilling for the additional earthwork etc complete and as directed by the TWAD board officers. 50mm Dia PVC Pipe (6KSC)
Pump Reparing & Service
Panel Starter Repair
Supply and delivery of Jointing Of Xlpe Insulated And Sheathed 3 Core Flat Type Copper Cable Conforming To Is 694/1990 And As Amended Thereafter
Labour Charges for erection of Horizontal shaft, centrifugal pumpset (Coupled/Monoblock) in bore well/Open well including fixing of suction pipe and foot valve upto a maximum depth of 7 metres and delivery pipes to the required length with valves, pressure gauges upto the exterior wall of pump room and erection of panel board consisting of TPIC switches starter, Voltmeter, Ammeter, Capacitor single phasing preventor and laying and jointing the cables and twin earthing as per IE rules including providing bed blocks etc., complete and operating the pumps and trial run for 10 days including signing of completion of reports as required by EB authorities.
Supply and delivery of Open well Submersible pump set conforming to IS 14220 /2002 and as amended thereafter and BEE 3 Star Rated capable of discharging the following duties due to all causes. The pump shall be with stainless steel shaft and dynamically balanced bronze mixed type impeller, CI FG 200 grade casing and brass screws and rotor shall be of copper rod as per IS 613/1984 with ISI mark. The pump suitable for installation in sump with 1.1KV grade 3 core suitable copper flat submersible cable to a length of 15m with necessary cable joints. The non-return valve located at the top of the pump in the discharge outlet connection is to be designed with minimum friction. The pump should be directly coupled to 2880 RPM, three phase, 50 Hz (±5), 415V+6% & 415V-15% squirrel cage induction motor suitable for DOL upto 5 HP, Fully Automatic Air break Star Delta up to 20 HP and Auto Transformer starter for above 20 HP starting and for continuous operation.
Supply and delivery of AC three Phase 6 pole Horizontal squirrel cage Induction motor confiriming to IS 325/1996 and as amended thereafter with Class F insulation to suit the speed of pump and suitable for operation with continous S1 rated, 415 V +/- 10 %, 50 HZ +/- 5%, TEFC (upto 20 HP), SPDP (above 20 HP). The motor offered should be of energy efficient motors.
Labour Charges for erection of Horizontal shaft, centrifugal pumpset (Coupled/ Monoblock) in bore well/Open well including fixing of suction pipe and foot valve upto a maximum depth of 7 metres and delivery pipes to the required length with valves, pressure gauges upto the exterior wall of pump room and erection of panel board consisting of TPIC switches starter, Voltmeter, Ammeter, Capacitor single phasing preventor and laying and jointing the cables and twin earthing as per IE rules including providing bed blocks etc., complete and operating the pumps and trial run for 10 days including signing of completion of reports as required by EB authorities.
Supply and delivery of Jointing Of Xlpe Insulated And Sheathed 3 Core Flat Type Copper Cable Conforming To Is 694/1990 And As Amended Thereafter
Supply and delivery of AC three Phase 6 pole Horizontal squirrel cage Induction motor confiriming to IS 325/1996 and as amended thereafter with Class F insulation to suit the speed of pump and suitable for operation with continous S1 rated, 415 V +/- 10 %, 50 HZ +/- 5%, TEFC (upto 20 HP), SPDP (above 20 HP). The motor offered should be of energy efficient motors. 200 KW,270 HP
Supply and delivery of Horizontal split casing centrifugal pump conforming to IS 1520 and as amended thereafter with CI casing and split glands, stainless steel shaft, hydraulically and dynamically balanced bronze impellers capable of discharging required quantity of water against a total head noted below due to all causes and with the accessories such as G.M air release cock, Grease cup, G.I priming funnel, M.S lifting hook, drip water G.I pipe connections, leading to the outside of pump house rubber water deflector, double flap foot valve, G.M strainer including unique tyre type coupling, common M.S fabricated base to mount pump and motor and other standard fittings etc complete. Pump shall be capable of discharging the specified quantity at the head noted at the minimum NPSH at site conditions. The shut off head shall be atleast 25% over and above the head at duty point. The pump shall be suitable for operation in AC three phase, 415 V, 50 Hz, 1500 RPM. 20000 LPM, 70 Head
Supply and delivery of Fully Automatic Auto Transformer Starter suitable for the motor offered. Floor mounting type air/ oil cooled Auto Transformer Starter with tapings at 50%, 65%, 80%, housed in robust steel chamber with arc and main contacts confirming to IS 8544 Part IV for operation in AC three Phase 50 Hz (+/- 5%), 415V (+/- 10%) with the following components etc. under voltage release with no volt coil, over load relay with dash pot arrangements, single phasing preventor, LED ON/ OFF switches, Mounted Ammeter, Earth leakage relay, contactor assembly suitable for next standard KW rating, in coming and out going cable entry provisions, transformer tank including first filling of oil etc. 38 to 75 KW
Supply and delivery of AC three Phase 6 pole Horizontal squirrel cage Induction motor confiriming to IS 325/1996 and as amended thereafter with Class F insulation to suit the speed of pump and suitable for operation with continous S1 rated, 415 V +/- 10 %, 50 HZ +/- 5%, TEFC (upto 20 HP), SPDP (above 20 HP). The motor offered should be of energy efficient motors. 110 KW,150 HP
Supply and delivery of Horizontal split casing centrifugal pump conforming to IS 1520 and as amended thereafter with CI casing and split glands, stainless steel shaft, hydraulically and dynamically balanced bronze impellers capable of discharging required quantity of water against a total head noted below due to all causes and with the accessories such as G.M air release cock, Grease cup, G.I priming funnel, M.S lifting hook, drip water G.I pipe connections, leading to the outside of pump house rubber water deflector, double flap foot valve, G.M strainer including unique tyre type coupling, common M.S fabricated base to mount pump and motor and other standard fittings etc complete. Pump shall be capable of discharging the specified quantity at the head noted at the minimum NPSH at site conditions. The shut off head shall be atleast 25% over and above the head at duty point. The pump shall be suitable for operation in AC three phase, 415 V, 50 Hz, 1500 RPM. 10000 LPM, 60 Head
Supply and delivery of Fully Automatic Auto Transformer Starter suitable for the motor offered. Floor mounting type air/ oil cooled Auto Transformer Starter with tapings at 50%, 65%, 80%, housed in robust steel chamber with arc and main contacts confirming to IS 8544 Part IV for operation in AC three Phase 50 Hz (+/- 5%), 415V (+/- 10%) with the following components etc. under voltage release with no volt coil, over load relay with dash pot arrangements, single phasing preventor, LED ON/ OFF switches, Mounted Ammeter, Earth leakage relay, contactor assembly suitable for next standard KW rating, in coming and out going cable entry provisions, transformer tank including first filling of oil etc. 38 to 75 KW
Supply and delivery of AC three Phase 6 pole Horizontal squirrel cage Induction motor confiriming to IS 325/1996 and as amended thereafter with Class F insulation to suit the speed of pump and suitable for operation with continous S1 rated, 415 V +/- 10 %, 50 HZ +/- 5%, TEFC (upto 20 HP), SPDP (above 20 HP). The motor offered should be of energy efficient motors. 90 KW,120 HP
Supply and delivery of Horizontal split casing centrifugal pump conforming to IS 1520 and as amended thereafter with CI casing and split glands, stainless steel shaft, hydraulically and dynamically balanced bronze impellers capable of discharging required quantity of water against a total head noted below due to all causes and with the accessories such as G.M air release cock, Grease cup, G.I priming funnel, M.S lifting hook, drip water G.I pipe connections, leading to the outside of pump house rubber water deflector, double flap foot valve, G.M strainer including unique tyre type coupling, common M.S fabricated base to mount pump and motor and other standard fittings etc complete. Pump shall be capable of discharging the specified quantity at the head noted at the minimum NPSH at site conditions. The shut off head shall be atleast 25% over and above the head at duty point. The pump shall be suitable for operation in AC three phase, 415 V, 50 Hz, 1500 RPM. 15000 LPM, 40 Head
Supply and delivery of Fully Automatic Auto Transformer Starter suitable for the motor offered. Floor mounting type air/ oil cooled Auto Transformer Starter with tapings at 50%, 65%, 80%, housed in robust steel chamber with arc and main contacts confirming to IS 8544 Part IV for operation in AC three Phase 50 Hz (+/- 5%), 415V (+/- 10%) with the following components etc. under voltage release with no volt coil, over load relay with dash pot arrangements, single phasing preventor, LED ON/ OFF switches, Mounted Ammeter, Earth leakage relay, contactor assembly suitable for next standard KW rating, in coming and out going cable entry provisions, transformer tank including first filling of oil etc. 38 to 75 KW
Supply and delivery of Horizontal split casing centrifugal pump conforming to IS 1520 and as amended thereafter with CI casing and split glands, stainless steel shaft, hydraulically and dynamically balanced bronze impellers capable of discharging required quantity of water against a total head noted below due to all causes and with the accessories such as G.M air release cock, Grease cup, G.I priming funnel, M.S lifting hook, drip water G.I pipe connections, leading to the outside of pump house rubber water deflector, double flap foot valve, G.M strainer including unique tyre type coupling, common M.S fabricated base to mount pump and motor and other standard fittings etc complete. Pump shall be capable of discharging the specified quantity at the head noted at the minimum NPSH at site conditions. The shut off head shall be atleast 25% over and above the head at duty point. The pump shall be suitable for operation in AC three phase, 415 V, 50 Hz, 1500 RPM. 1500 LPM,60 Head
Supply and delivery of AC three Phase 4 pole Horizontal squirrel cage Induction motor confiriming to IS 325/1996 and as amended thereafter with Class F insulation to suit the speed of pump and suitable for operation with continous S1 rated, 415 V +/- 10 %, 50 HZ +/- 5%, TEFC (upto 20 HP), SPDP (above 20 HP). The motor offered should be of energy efficient motors.
Supply and delivery of Fully Automatic Auto Transformer Starter suitable for the motor offered. Floor mounting type air/ oil cooled Auto Transformer Starter with tapings at 50%, 65%, 80%, housed in robust steel chamber with arc and main contacts confirming to IS 8544 Part IV for operation in AC three Phase 50 Hz (+/- 5%), 415V (+/- 10%) with the following components etc. under voltage release with no volt coil, over load relay with dash pot arrangements, single phasing preventor, LED ON/ OFF switches, Mounted Ammeter, Earth leakage relay, contactor assembly suitable for next standard KW rating, in coming and out going cable entry provisions, transformer tank including first filling of oil etc.
Labour Charges for erection of Horizontal shaft, centrifugal pumpset (Coupled/Monoblock) in bore well/Open well including fixing of suction pipe and foot valve upto a maximum depth of 7 metres and delivery pipes to the required length with valves, pressure gauges upto the exterior wall of pump room and erection of panel board consisting of TPIC switches starter, Voltmeter, Ammeter, Capacitor single phasing preventor and laying and jointing the cables and twin earthing as per IE rules including providing bed blocks etc., complete and operating the pumps and trial run for 10 days including signing of completion of reports as required by EB authorities.
above 20 m upto 25 m head Discharge 200 to 300 M3/hour
Labour charges for the erection of submersible pumpset in borewell/ openwell including fixing and jointing submersible cable with proper clamps upto the starter to required depth and also fixing of riser pipes to the required depth valves erection clamps, pressure gauges upto the exterior wall of pump room and erection of panel board consisting of TPICN switches starter, Voltmeter, Ammeter, three pilot (indicating) lamps capacitor single phasing preventor, water level guard and laying and jointing the cables and twin earthing as per IE rules etc., complete and testing the pumpset and trail run for 10 days.
Add GST 18%
JS ASSOCIATE DEVELOPMENT INDIA PRIVATE LIMITED
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .