| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.1 CrAdmitted-Finance ADD BHITHAULI KHURD SITAPUR ROAD DISTT LUCKNOW | -5.10% | ₹1.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.2 CrAdmitted-Finance 10 RAJAN KUNJ ROORKEE ROAD MEERUT UP PIN 250110 | MEERUT | UTTAR PRADESH | 250110 | -2.50% | ₹1.2 Cr | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | - | Rejected-Technical Document Not complete |
Tender Value
₹1.2 Cr
EMD Value
₹2.4 L
Closing Date
8 May 2026, 3:00 pmClosed
SE Vrindavan Circle
SE Vrindavan Circle, UPAVP, Lko
Restoration and Renovation of Road and Drain from Mala dwivedi house to Basant kunj main road via Hanuman mandir, Sai medical store, Vivekanand School, Kamal shop and Jangleshwer mandir at Balaganj ward, Bari Road, Lucknow.
2026_UPHDB_1140020_1
1074/M-13/107 Dt. 16.04.26 (Infra-8)
Open Tender
Civil Works
180 days
balaganj ward lucknow
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,310
EE, CD Lko-05, UPAVP, Lko
₹2.4 L
18 May 2026
21 Apr 2026
8 May 2026
21 Apr 2026
8 May 2026
21 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification complete as per direction byE/I | - | Cum | - | - |
| 2 | Preparation and consolidation of sub grade with power road roller of 8 to 12 tonne capacity after excavating earth to an average of 22.5 cm depth, dressing to camber and consolidating with road roller including making good the undulations etc. and re-rolling the sub grade and disposal of surplus earth with lead upto 50 metres. complete as per direction byE/I | - | Sqm | - | - |
| 3 | Construction of granular sub-base by providing close graded material, spreading in uniform layers with on prepared surface, mixing by mix in place method at OMC, and compacting with vibratory roller to achieve the desired density complete in all respect and as per relevant clause of MORT & H section,-401. for Repair work complete as per direction byE/I | - | Cum | - | - |
| 4 | Providing, laying, spreding and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers with paver in sub base/base course on well prepared surface and compacting with vibratory roller to achive the desired density.complete as per Morth clause 401 complete as per direction byE/I | - | Cum | - | - |
| 5 | Providing and applying Prime coat with 60/70bitumen emulsion on prepared surface of granuler base including cleaning of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means.including supply of all materials, labour and T&P etc .required to proper completion of the work as per Morth clause 502. complete as per direction byE/I | - | Sqm | - | - |
| 6 | Providing and laying Dense graded bituminous macadam (40mm thick) with hot mix 100-120 TPH hot mix plant producing an average out put of 75 tonnes per hour using crushed aggregate of specified grading, premixed with bituminous binder @4.0 to 4.50% weight of total mix and filler, trnsporting the hot mix to work site, laying with hydrostatic paver finisher with sensor controller to required grade, level and alignment and rolling with smooth wheeled vibratory and tandem rollers to achived the desired compaction complete in all respects and as per relevent clauses of MORT & H section -507. complete as per direction byE/I | - | Sqm | - | - |
| 7 | Providing & applying tack coat with VG 10 bitumen emulsion using emulsion pressure distributor at the rate of 0.35 kg/ sqm on the prepared bituminous/granular surface cleaned with mechnical broom.including supply of all materials, labour and T&P etc .required to proper completion of the work as per Morth clause 503. complete as per direction byE/I | - | Sqm | - | - |
| 8 | Providing & laying 25 mm thick compacted S.D.B.C. with 100-120 TPH batch type hot mix plant producing an average out put of 75 tonnes per hour using crushed aggregate of specified grading, premixed with bituminous binder,@ 5.00 % weight of total mix and filler transporting the hot mix to work site, Laying with hydrostatic paver finisher with sensor controller to required grade, level & alignment & rolling with smooth wheeled vibratory and tandem rollers to achieved the desired compaction complete in all respects & as per relevant clauses of MORT & H section-504 complete as per direction byE/I | - | Sqm | - | - |
| 9 | Maintenance of Earth Shoulder(stripping excess soil) assuming average depth of stripping as 75mm, Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor. complete as per direction byE/I | - | Sqm | - | - |
| 10 | Brick edging on both side of road of 1st class bricks 8cm wide and 12cm. deep laid including Supply of all material labour, T&P etc. finished to the required template and in proper alignment and also including dressing & ramming the excavated earth as directed by E/I. | - | rmt | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.90 MB
BOQ_2128643.xls
BOQ • 0.34 MB
TechnicalBLALGANJ.pdf
Tender Documents • 8.05 MB
Financial.pdf
Tender Documents • 0.56 MB
Download all tender documents and submit your bid