| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹31.5 LAccepted-AOC GF 3 F 12 KSSIDC BUILDING 5TH CROSS 1ST STAGE PEENYA INDUSTRIAL ESTATE BANGALORE | BENGALURU URBAN | KARNATAKA | 560058 | 1 | Accepted-AOC Quoted amount of Rs.2085322 for SITC plus AICMC 50.86 percentage for 8 years all excluding GST | |
| 2 | 2₹32.7 L+₹8.1 L (33.1%)Rejected-Finance CHENNAI | CHENNAI | TAMIL NADU | 600001 | 2 | Rejected-Finance L2 bidder | |
| 3 | 3₹33.6 L+₹9.0 L (36.7%)Rejected-Finance A 76 SURENDRA NAGAR ISMAILGANJ FAIZABAD ROAD LUCKNOW UTTAR PRADESH 226016 UDYAM UP 50 0018139 | LUCKNOW | UTTAR PRADESH | 226016 | 3 | Rejected-Finance L3 bidder | |
| 4 | 4₹34.2 L+₹9.6 L (38.9%)Rejected-Finance 107 265 BRAHAMA NAGAR KANPUR UP 208012 | KANPUR NAGAR | UTTAR PRADESH | 208012 | 4 | Rejected-Finance L4 bidder | |
| 5 | 5₹38.7 L+₹14.1 L (57.4%)Rejected-Finance 50 51 NARAYANASWAMY NAGAR CHERLAPALLY CHERLAPALLY HYDERABAD HYDERABAD TELANGANA 500051 | MEDCHAL MALKAJGIRI | TELANGANA | 500051 | 5 | Rejected-Finance L5 bidder |
Tender Value
₹34.3 L
EMD Value
₹69,000
Closing Date
10 Jan 2024, 6:00 pmClosed
AGM EE
Office of AGM EE RHQSR Chennai
Provision of UPS for GLF at Salem Airport
2023_AAI_178619_1
AAI/RHQ-SR/AGM(E-E)/UPS-SLM
Open Tender
Electrical Works
Item Rate
153 days
Salem Airport
Please refer Tender documents.
18 documents required · 18 mandatory
₹1,180
₹69,000
31 Jan 2024
20 Dec 2023
11 Jan 2024
20 Dec 2023
10 Jan 2024
20 Dec 2023
20 Dec 2023 - 26 Dec 2023
SH-I: SITC of UPS and allied works
2 X 80 KVA capacity, 3-phase input / 3 phase output online UPS with Isolation Transformer and Battery Bank: Supply, Installation, Testing and Commissioning (SITC) of 2 X 80 KVA capacity, 3-phase input / 3 phase output online UPS with double conversion type advance IGBT technology with suitable rated (min. K-1 rated) aluminum wound 100 kVA capacity isolation transformer at input of the each UPS with MCCB and soft starter for parallel redundancy also to drive constant current regulators with 100% unbalanced load at full load condition. The UPS shall have built in 100% rated automatic static by pass, manual by pass facilities for maintenance, active input power factor correction, phase sequence corrector, pure sine wave output, input/output isolation, compatibility with generator supply, cold start capability, EMI/RFI noise filter, advanced communication- RS232 / RS 485 ports and user friendly LCD display and run in parallel redundant system configuration for equal sharing of load,battery management features integrated with main UPS controller, suitable to operate at 400V±15%, 50Hz, 3 phase AC supply, suitable IP rated enclosure and capable to take 2 phase & single phase loads on 3phase output of UPS with 100% unbalanced and necessary safety protections along with suitable size MCCB inside etc complete as required. The job also includes supply, installation, testing & commissioning of two battery bank sets of required/suitable size with required number of 12V VRLA SMF batteries suitable to give a backup time of minimum 30 minutes per each UPS ,along with battery racks/enclosure, suitable rated battery circuit breaker, interconnections between batteries as well as battery bank to UPS and interconnections between isolation transformer to UPS with suitable insulated copper conductors, connectors,glanding & terminations etc., complete as required. (Entire system shall be provided with 2 years warranty). Note: Bidders shall quote for SITC portion only.
SH:II All Inclusive Comprehensive Maintenance Contract (AICMC) except replacement of batteries after DLP.
1st Year AICMC cost after 2 years of DLP @ 4.68% on item no 1.01
2nd Year of AICMC cost after 2 years of DLP @ 4.96% on item no 1.01
3rd Year of AICMC cost after 2 years of DLP @ 5.45% on item no 1.01
4th Year of AICMC cost after 2 years of DLP @ 5.81% on item no 1.01
5th Year of AICMC cost after 2 years of DLP @ 6.59% on item no 1.01
6th Year of AICMC cost after 2 years of DLP @ 7.16% on item no 1.01
7th Year of AICMC cost after 2 years of DLP @ 7.76% on item no 1.01
8th Year of AICMC cost after 2 years of DLP @ 8.45% on item no 1.01
vk sam engineering
SUN POWER CONVERSION PVT LTD
Awasthi Electric Works
Numax Energy Solutions
DEEPAKELECTRICALS
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .