| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.3 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹3.4 L+₹8,449.04 (2.55%)Admitted-Finance 294 NEW SANTOSHPUR MAIL 38 4 NEW SANTOSHPUR 1ST LANE KOLKATA 700075 | KOLKATA | WEST BENGAL | 700075 | L2 | Admitted-Finance | ||
| 3 | L3₹3.4 L+₹13,153.99 (3.97%)Admitted-Finance | L3 | Admitted-Finance |
Tender Value
₹3.3 L
EMD Value
₹7,000
Closing Date
17 Nov 2026, 1:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
OFFICE OF EE(CIVIL)
THE KOLKATA MUNICIPAL CORPORATION 97 AND 98 GARFA MAIN ROAD
RESTORATION OF ROAD DISTURBED FOR W/S PIPE LAYING AT SATABDI PARK NEAR PREM. NO- 183, 3204 ETC. NAYABAD IN W-109, BR-XII, KMC.
2026_KMC_1048901_1
KMC/EE(C)/BR-XII/109/027/26-27
Open Tender
CIVIL WORKS
Percentage
125 days
BOROUGH XII
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹7,000
20 Nov 2026
6 Nov 2026
19 Nov 2026
6 Nov 2026
17 Nov 2026
6 Nov 2026
120 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in cutting to form road section in correct profile including removal of spoil not exceeding initial lead of 50m and initial lift of 1.5m (Mode of measurement: pre works and post work | 47.25 | M3 | 79.9 | ₹3,775.28 |
| 2 | Labour for picking up existing metalled road surface to a specified average depth, including screening and stacking the pavement materials. (b) For average depth above 40 mm but not exceeding 75 mm by manual means. (ii) Brick / Jhama metal surface. ( Ref :PWD (Rds & Brdgs)-2018, It. No. 18.01 Page No.331) | 189 | SQM | 12.9 | ₹2,438.1 |
| 3 | Supplying, spreading and compacting Sand to required thickness, in layers not exceeding 150 mm to proper gradient and camber, inundating each layer by water and packing and ramming layer by layer to achieve desired compaction, including lighting, guarding, barricading and making adequate earthen bundh where necessary, curing with water as per direction, mending cracks and depressions by ramming wherever necessary. Note:- Add cost at site of the materials to arrive at the complete rate. The compaction factor for dry, clean sand may be taken as 0.835. (The payment is to be made on the basis of finished compacted volume). (c) For Silver Sand ( Ref :PWD (Rds & Brdgs)-2018, It. No. 4.05 Page No.245 & page-222 sl. No-4) | 13.5 | M3 | 1,172.6 | ₹15,830.1 |
| 4 | Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. ( Ref :PWD (Bldg.)-2017, It. No. 1, Page No.14 & 3rd Corrigenda Addenda dtd-04.06.18,P-1) | 138.14 | SQM | 361 | ₹49,868.54 |
| 5 | Water Bound Macadam Sub Base by consolidating Jhama metal / Laterite chelly or stone metal / shingles of specific size in hard crust to requisite thickness (measured after compaction) in layers including screening of metals etc. as necessary, hand packing, sweeping, watering and rolling in stages with power roller to proper line, grade and camber, lighting, guarding & barricading and making necessary earthen bundh of one metre width on each side where necessary to protect edges and preparing the bed by necessary cutting or filling and rolling all complete including the cost of all materials and hire and labour charges of all men and machineries and compacting to the required density, as per Clause 404 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (ii) For Construction of Sub Base by consolidating Brick Bats / Laterite (90 mm to 45 mm) ( Ref :PWD (Rds & Brdgs)-2018, It. No. 4.10 (ii) Page No.247 & page-222 sl. No-5 (f)) | 13.5 | M3 | 1,944.9 | ₹26,256.15 |
| 6 | Water Bound Macadam Sub Base by consolidating Jhama metal / Laterite chelly or stone metal / shingles of specific size in hard crust to requisite thickness (measured after compaction) in layers including screening of metals etc. as necessary, hand packing, sweeping, watering and rolling in stages with power roller to proper line, grade and camber, lighting, guarding & barricading and making necessary earthen bundh of one metre width on each side where necessary to protect edges and preparing the bed by necessary cutting or filling and rolling all complete including the cost of all materials and hire and labour charges of all men and machineries and compacting to the required density, as per Clause 404 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (i) For Construction of Sub Base by consolidating Jhama metal / Laterite (63 mm to 45 mm) (Moorum replaced with course sand) ( Ref :PWD (Rds & Brdgs)-2018, It. No. 4.10(i) Page No.247 & page-222 sl. No- 1 & 5 (e)) | 24.3 | M3 | 2,596.83 | ₹63,102.97 |
| 7 | Providing and applying tack coat with Cationic Bitumen Emulsion of approved grade conforming to IS: 8887-1978 on the prepared surface cleaned with Hydraulic broom, moistening the surface including cost and carriage of emulsion, hire charges of machinery and labour, cost of fuel and lubricants all complete as per Clause 503 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (ii) On Granular surfaces treated with primer. (Using Bitumen emulsion at the rate of 0.25 to 0.30 kg per sqm.) ( Ref :PWD (Rds & Brdgs)-2018, Page No.213 (Table No.3.3?1) & Page No. 251, It. No. 5.02, Table no.I-2 of pg-219, pg-220 Format-B, PWD(R&B) 2018, pg-228 item-1.03 (i), Pg-230,Table-I, It-4,) | 324 | SQM | 10.33 | ₹3,346.92 |
| 8 | Providing and applying tack coat with Cationic Bitumen Emulsion of approved grade conforming to IS: 8887-1978 on the prepared surface cleaned with Hydraulic broom, moistening the surface including cost and carriage of emulsion, hire charges of machinery and labour, cost of fuel and lubricants all complete as per Clause 503 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (i) On Bituminous Surface. (Using Bitumen Emulsion at the rate of 0.20 to 0.30 kg per sqm.) ( Ref :PWD (Rds & Brdgs)-2018, Page No.213 (Table No.3.3?1) & Page No. 251, It. No. 5.02, Table no.I-2 of pg-219, pg-220 Format-B, PWD(R&B) 2018, pg-228 item-1.03 (i), Pg-230,Table-I, It-4,) | 220 | SQM | 9.51 | ₹2,092.2 |
| 9 | Transportation and laying 40 mm thick hot asphaltum mixture from kmc plant to the work site including rolling but excluding the cost of tack coat (covered area- 1250 square meter per 100 mt hot-mixture) a) without paver finisher i) Day Time ( Ref :As per KMC Rates, taxes, fees & Charges for the year 2019-2020, As per present market Price, Rate appvd. By D.G.(Civil) Circular No-21 of 2016-17 dtd-25.10.16 vide resolution MIC meeting (Item no-M-29.22 dtd-21.09.16), Mpl. Secretary Circullar no-02 of 2018-19 dtd.04.04.2018 ) | 544 | SQM | 41 | ₹22,304 |
| 10 | Liquid Seal Coat (Type A) Providing and laying Liquid Seal Coat (Type A) with approved quality stone chips and bitumen binder on thoroughly cleaned black top surface, spreading screened & cleaned stone aggregates (100 % passing through 11.2 mm sieve and retained on 2.36 mm sieve) uniformly @ 0.09 m3 of dry aggregate per 10 m2 of area using suitable means, brushing the chips, if necessary, to ensure uniformity, followed by rolling with power roller including the cost and carriage of binder and stone chips, cost of heating the binder and all other incidental charges, cost of fuel and lubricants, including hire charges of machineries, tools & plants required for construction and quality control complete as per Clause 511 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (ii) With Cationic Bitumen Emulsion (@ 15.00 kg / 10 sqm.)((Ref. - Item No. - 5.13(A)(II), P-258 of P.W(R)D Schedule 2018, Format-B, P-220 of P.W(R)D Schedule 2018, TABLE No. T-1, Item no.-4/A, P-230 of P.W(R)D Schedule 2018, TABLE III-2, ROW-16, P-226 of P.W(R)D Schedule 2018, Ref-TABLE No. T-1, Item no.-3/A, P-230 of P.W(R)D Schedule 2018, 1.03 A (C), P-227 of P.W(R)D Schedule 2018, TABLE No. T-1, Item no.-3/A, P-230 of P.W(R)D Schedule 2018)) | 544 | SQM | 64.91 | ₹35,311.04 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.44 MB
BOQ_2567795.xls
BOQ • 0.29 MB
PREQUE.pdf
Additional Documents • 0.17 MB
FORM-109_27.pdf
Tender Documents • 0.58 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .