| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAccepted-AOC 42 641 009 | COIMBATORE | TAMIL NADU | 641009 | ₹1.2 Cr | L1 | Accepted-AOC ACCEPT |
| 2 | L2₹1.3 CrRejected-AOC 1 SRI GOKULAM COMPLEX 15 155B MARAPALAM MADUKKARAI COIMBATORE DISTRICT 641 105 | COIMBATORE | TAMIL NADU | 641105 | ₹1.3 Cr | L2 | Rejected-AOC REJECT |
| Sl No | Description | Qty | Unit | M S ENGINEERS L1 | ABBI ASSOCIATES L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full | depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete | 376 | M3 | 11 ₹4,136 | 130 ₹48,880 |
| 2.00 | Removal of Excavated Excess Earth Away from the Site to 3 KM including loading and transporation charges etc., complete as per standard specifications | 264 | M3 | 7.83 ₹2,067.12 | 80 ₹21,120 |
| 3.00 | Cement Concrete 1:4:8 ( One Cement, Four Sand and Eight Aggregate) using 40 mm HBG stone jelly for foundation including dewatering if found necessary and laid in layers of not more than 15 cm thick and compacted etc., complete complying with standard specification as per the instruction of dept officers | 376 | M3 | 1,691.05 ₹6,35,834.8 | 5,800 ₹21,80,800 |
| 4.00 | Vibrated Reinforced Cement Concrete M20 ( Design Mix) Using 20mm ISS HBG Graded Metal including ocst and ocnveyance of all materials to site and cement at site excluding cost and fabrication of Steel but form works and centering soft water labour charges for mixing , tranpsorting, placing on Position, Vibrating and compacting finishing and curing concrete, working at hieghts, hire charges for hire charges for tools and plants, including all other incidental charges, etc, complete as per standard specification for CC Pavement | 1,373 | M3 | 8,605 ₹1,18,14,665 | 7,600 ₹1,04,34,800 |
Tender Value
₹1.5 Cr
EMD Value
₹1.5 L
Closing Date
28 Jan 2026, 3:00 pmClosed
The Commissioner, Coimbatore Corporation
Coimbatore Corporation, Main Office, Big bazaar street, Town hall, Coimbatore-1
Restoration of CC Surface at ANGANNAN STREET 7 162063L18210, ANGANNAN STREET 6 162063L18209, PERUMAL KOIL STREET 162063S0987, MANIAM ARULANANDHAR STREET 162063R11973, SUBRAMANIYAR KOIL STREET 162063S0988, RAMALINGA JYOTHI NAGAR 162063L0677, SURI
2026_MAWS_642162_9
E12/2026 (TURIP)
Open Tender
Civil Works
90 days
Coimbatore
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
₹1.5 L
Chief Engineer Chamber, Coimbatore Corporation, Ma
16 Mar 2026
12 Jan 2026
28 Jan 2026
12 Jan 2026
28 Jan 2026
12 Jan 2026
14 Jan 2026
Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full | depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete
Removal of Excavated Excess Earth Away from the Site to 3 KM including loading and transporation charges etc., complete as per standard specifications
Cement Concrete 1:4:8 ( One Cement, Four Sand and Eight Aggregate) using 40 mm HBG stone jelly for foundation including dewatering if found necessary and laid in layers of not more than 15 cm thick and compacted etc., complete complying with standard specification as per the instruction of dept officers
Vibrated Reinforced Cement Concrete M20 ( Design Mix) Using 20mm ISS HBG Graded Metal including ocst and ocnveyance of all materials to site and cement at site excluding cost and fabrication of Steel but form works and centering soft water labour charges for mixing , tranpsorting, placing on Position, Vibrating and compacting finishing and curing concrete, working at hieghts, hire charges for hire charges for tools and plants, including all other incidental charges, etc, complete as per standard specification for CC Pavement
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.23 MB
Doccc9.pdf
Tender Documents • 0.82 MB
BOQ_769210.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid