| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAccepted-AOC | ₹1.2 Cr | L1 | Accepted-AOC Lowest Rate |
| 2 | L2₹1.2 Cr+₹3.1 L (2.60%)Rejected-Finance | ₹1.2 Cr+₹3.1 L (2.60%) | L2 | Rejected-Finance Highest Rate |
Tender Value
₹1.2 Cr
EMD Value
₹1.2 L
Closing Date
28 Jan 2025, 3:00 pmClosed
Project Director
DRDA Office, 2nd Floor, New Collectorate, Thanjavur
Thanjavur District - Package No.01 - Upgradation and 5 years maintenance of 1 Road work in Ammapettai Block of Thanjavur District under NABARD RIDF XXX - 2024-25.
2024_RDTN_514766_1
DIPR/5603/Tender/2024 dated. 26.12.2024
Open Tender
Civil Works - Roads
Item Rate
180 days
Ammapettai
As per Tender document
9 documents required · 9 mandatory
₹0
₹1.2 L
DRDA Office, 2nd Floor, New Collectorate, Thanjavu
25 Mar 2025
27 Dec 2024
28 Jan 2025
27 Dec 2024
28 Jan 2025
27 Dec 2024
3 Jan 2025
Amount
Upgradation and 5 years maintenance of Mahimalai to Ivelithottam Atrangarai salai in Neikunnam Panchayat Km 0/0-2/340.
Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc.complete.
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A.
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @ 20% &2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method).
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam (WMM) 250 mm thick, including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory Soil Compactor to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and applying Prime coat over WMM surface using 7 Kg of bitumen emulsion SS-1 for 10sqm preparatory to another bituminous construction over it including cost of material, labour charges and all other incidental charges etc., .
Providing and applying Tack coat over WMM surface (treated with primer) using 2.5 Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
BITUMINOUS CONCRETE 25 MM THICK USING CMP (Grade-II) - Providing and laying Bituminous concrete to 25 mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5.
Providing & laying gravel soling to compacted thick including cost & conveyance of gravel from approved source to work site including labour for spreading and compacting by power roller to achieve the required Proctor density at 100% compaction of optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc., complete.
Providing and laying of hot applied Thermoplastic compound 2.5mm thick including reflectorising glass beads @ 250 gms per sq.m area, thickness of 2.5 mm is exclusive of surface apllied glass beads as per IRC : 35. The finished surface to be level , uniform and free from streaks and holes etc complete as per MORT &H specification No.803.
Retro-Reflectorised Traflic Signs (with definition board) Type IV - Providing and erecting of Retro-Reflectorised Cautionary, Mandatory and Informatory signs (with definition board) made out of High Intensity Prismatic Grade Sheeting confirming to Type-IV standards of IRC-67: 2012 and ASTMD 4956-09, specification and fixed over 2mm thick Aluminium sheet fixed over a back supporting frame of 25mmx25mmx3mm Mild Steel angle and supported on a mild steel angle post 75X75X6mm with a clear height of not less than 2. lOm from the ground level to the bottom of the sign board and 0.60m below ground level. The sign post should be painted as per IRC 67-2012 and firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrète 45cmX45cmX60cm size including cost and conveyance of all materials, equipment, Machinery and labour with all leads and lifts, loading charges necessary for satisfactory completion of the work as directed by the engineer in charge. High intensity Retro - Reflectro sheet shall consist of minimum coefficient of Retro-reflection as per Table 6.6 of IRC 67-2012. The retro - reflective sheeting shall be covered under 7 year warranty issued for field performance and a certified copy of three years outdoor exposure report shall be obtained as per IRC 67:2012 (as per MORT&H Specification No.801)
60 cm Equilateral triangle cautionary signboard (pedestrial crossing, Major Road ahead, Speed Breaker ahead, School Zone, Side road left and right, X-junction ahead, Curve ahead)
Supplying and fixing Kilometer Metre stones including painting and lettering as directed by the departmental officers etc., complete.
Supplying and fixing Hecta Metre stones including painting and lettering as directed by the departmental officers etc., complete.
Supplying and fixing Name board including painting and lettering as directed by the departmental officers etc., complete.
Towards the charges for routline maintenance of the road work executed under NABARD RIDF including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRC-SP-20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost for carriageway width of 3.00m & 3.75m
For the First Year from the date of completion of work
For the Second Year from the date of completion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}.
RV Constructions (BID ID -1239351)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .