Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance 0 RAILWAY STATION ROAD BAHRAICH UTTAR PRADESH 271801 | BAHRAICH | UTTAR PRADESH | 271801 | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
₹6.9 L
EMD Value
₹7,000
Closing Date
17 Oct 2023, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
se edc balrampur
office se edc balrampur
87/EDC(BLP)/2023-24
2023_MVVNL_847533_1
NVS-87-94/EDC(BLP)/2023-24
Open Tender
Electrical Works
Item Rate
90 days
Shrawasti
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,180
se edc blp
₹7,000
20 Oct 2023
7 Oct 2023
18 Oct 2023
7 Oct 2023
17 Oct 2023
7 Oct 2023
Amount
Loading, Unloading and safe cartage of the following materials from Electricity Store Centre, Bahraich/Shrawasti to the work site/dump site (Distance up to 50 km)
ST Poles (11 mtr long)
ST Poles (9 mtr long)
ACSR Weasel Conductor
630 KVA T/F
XLPE cable 3x120sq.mm.
Cable Jointing Kit Outdoor 3x120sq.mm
3X120+1X95+1X16sq.mm.
LT Distribution Box
11 KV VCB for O/G CTR 200/100/5A.
Other line materials(Centralized Items)
Erection of single ST Poles (11 Mtr Long) for 11 KV/L.T. line alongwith fitting of all accessories on pole including dragging of pole from Dump Site to pit site
Erection of sectional double pole sectional ST Poles (11 Mtr long) alongwith fitting of all accessories on pole including dragging of pole from Dump Site to pit site.
Erection of single ST Poles (9 Mtr Long) for 11 KV/L.T. line alongwith fitting of all accessories on pole including dragging of pole from Dump Site to pit site
Earthing of pole as per RESSPO U.P.P.C.L. drawing/ norms
Erection and Grouting of stay sets alongwith complete fittings. Cement, Sand & Brick ballast provided by the contractor at his own cost.
Grouting of Poles with 1:4:8 CC ratio of cement, sand & brick ballast, backfilling of pits with mud completely.All required materials provided by the contractor at his own cost.
Laying, stringing, sagging & binding of conductors of 11 KV in 3 phase, 3 wire line with jumpering (where as required)
Laying, Stringing & Sagging of 3X120+1X95+1X16sq.mm. ABC Cable up to proper sag.
Laying of XLPE cable 3x120sq.mm.D/c
Installation & fixing of Cable Jointing Kit Outdoor 3x120sq.mm.
Construction of 11/0.4 KV S/S for 630 KVA T/F with mounting and fitting of T/F on plinth/double pole with proper fitting of all acessories and connecting with all circuit including earthing of T/F fitting with all accessories.
Road Restoration for footpath side.
Road cutting Pakka.
Fitting of LT Distribution Box
Construction of masonry plinth with Fencing suitable for 630 KVA T/F including fixing of rail/joist on plinth. All required materials provided by the contractor at his own cost.
Decentralized Items:-Providing and fixing of following materials sanctioned Estimate/Package as per RESSPO U.P.P.C.L. drawing/ norms.(where is required).
Top, T-off holding clamp
X-arm Holding clamp with nut & bolt.
MS Nut and bolts.
SAROJ CONSTRUCTION
M/s S S Associates
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .