| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹21.4 LAccepted-AOC | L1 | Accepted-AOC Accept | |
| 2 | L2₹22.0 L+₹56,507 (2.64%)Rejected-AOC | L2 | Rejected-AOC Reject |
Tender Value
₹25.6 L
EMD Value
₹25,600
Closing Date
23 Nov 2023, 3:00 pmClosed
The Commissioner, Coimbatore Corporation
Coimbatore Corporation, Main Office, Big bazaar street, Town hall, Coimbatore-1
Providing CC flooring and RCC covering slab at Bakthavathachalam street in ward no. 46 central zone coimbatore corporation
2023_MAWS_390078_26
e78/2023
Open Tender
Civil Works
Works
150 days
Coimbatore
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹25,600
3 Jan 2025
20 Nov 2023
24 Nov 2023
20 Nov 2023
23 Nov 2023
20 Nov 2023
Amount
Dismantling the damaged Reinforced Cement Concrete slab as per the instruction of Departmental officers. Including all initial lead and other labour
Desilting in the cxisting drain as per the direction of departmental officers etc completed.
Dismantling the damaged Cement Conerect work as per the instruction of Departmental officers. Including all initial lead and other labour charges
Earth work excavation in all kinds of soil including sand, silt, wet sand under water, black cotton, stiff black cotton, clay, hard stiff clay, hard red earth, murram, stoney earth, gravel and shales etc. excepting all kinds of rock and boulders exceeding 0.014 c.u.m. in volume including rough dressing and dumping the excavated materials away trom work site manually within 50m initial lead and 2m initial lift as per the direction of Engineer-incharge.
Cement concrete 1:4:8 (one cement, four sand and eight aggregate ) using 40mm gauge hard broken granite stone jelly for All CC items of work excluding centering, shuttering, and cost of reinforcement grill but including curing finishing etc., complete fixtures in CC works wherever necessary as directed by departmental officer etc., complete.
Supplying and erecting Shuttering including necessary supports for plane surfaces such as Drain walls etc, using mild steel sheets of size 90x60Cm and BG 10 stiffened with welded mild steel angles for boarding supported by Casuarinas props at suitable intervals etc., complete complying with standard specification and as directed.
Cement concrete 1:3:6 (one cement, three sand and six aggregate ) using 20mm gauge hard broken granite stone jelly for All CC items of work excluding centering, shuttering, and cost o reinforcement grill but including curing finishing etc., complete fixtures in CC works wherever necessary as directed by departmental officer etc., Completed
8. Cement concrete 1:2:4 (one cement, three sand and six aggregate ) using 20mm gauge hard broken granite stone jelly for All CC items of work excluding centering, shuttering, and cost o reinforcement grill but including curing finishing etc., complete fixtures in CC works wherever necessary as directed by departmental officer etc.,
Plastering with cement mortar 1:5 mix 12 mm thick ( one cement five sand) per direction o departmental officers etc. completed.
Reinforced Cement Concrete in 1:1.5:3> Mix using 20 mm size hard broken granite Stone Jelly from approved quarry including Mixing, Laying, Compacting, Finishing, Curing and all Labour Charges as per the Direction of the Departmental officers Etc., Complete.
Supplying and fabrication and placing in position steel reinforcement using mild steel/Ribbed for steel rods for all RCC work as per the design given including cost of steel and binding wire in all floors complying with standard specification and drawings etc..,
Supply & Fixing of SFRC Manhole cover With frame 600mm x 600mm as per standard quality including of all materials and all labour charges for fixing in position etc.completeas Standard specification.
Conveying the excavated earth from the site to the distance of 15kms out side of the city limit including all initial lead, lift, loading and unloading with transportation charges etc complete as per the direction of departmental officers.
RVP.BALAMURUGAN
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .