| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹44.8 LAccepted-Finance | ₹44.8 L | L1 | Accepted-Finance Accepted |
| 2 | L2₹46.1 LRejected-Finance 1 PNETH CHOORI CHAMBA CHAMBA HIMACHAL PRADESH 176311 UDYAM HP 02 0007745 | CHAMBA | HIMACHAL PRADESH | 176311 | ₹46.1 L | L2 | Rejected-Finance Rejected |
| 3 | L3₹47.2 LRejected-Finance | ₹47.2 L | L3 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | vikul thakur L1 | sanjeev kumar L2 | Sachin Chauhan L3 |
|---|---|---|---|---|---|---|
| 1.00 | Excavation in earth work and disposal of all excavated earth upto a lead of 20 metres and lift upto 1.50 metres, disposed earth to be levelled and neatly dressed complete in all respect within all lead and lifts as per the direction of Engineer-in-Charge. | 79.03 | Cum | 580 ₹45,837 | 600 ₹47,418 | 610 ₹48,208 |
| 2.00Wet well sinking in Gravel including all pumping shoring etc. with in all leads and lifts. | ||||||
| 2.01 | From speing level to 3mtr | 150.72 | Cum | 6,150 ₹9.3 L | 6,200 ₹9.3 L | 6,250 ₹9.4 L |
| 2.02 | from 3mtr to 6mtr | 150.72 | cum | 6,800 ₹10.2 L | 6,900 ₹10.4 L | 7,000 ₹10.6 L |
| 2.03 | From 6mtr to 9mtr | 34.48 | cum | 8,200 ₹2.8 L | 8,250 ₹2.8 L | 8,300 ₹2.9 L |
| 3.00Lowering steel well curb in the pit and assembling in position etc. within all leads and lifts. | ||||||
| 3.01 | When depth is up to three metres from ground. | 15.67 | Qtls | 320 ₹5,014 | 330 ₹5,171 | 350 ₹5,485 |
| 3.02 | When Depth is more then Three Mtr | 15.67 | Qtls | 370 ₹5,798 | 380 ₹5,955 | 400 ₹6,268 |
| 4.00 | Steel work welded in built up sections,trusses and framed work including cutting,hoisting, fixing in position and applying a priming coat of red lead paint in beam joint channels ,angle, Tees Flats with concrete plates or amngle cleets as in main and cross beam hip and jack rafters purlins connected to common rafter and the like with in all leads and lifts | 15.67 | Qtl | 18,200 ₹2.9 L | 18,900 ₹3.0 L | 19,200 ₹3.0 L |
| 5.00Providing and laying 1:1.5:3(1cement,1.5 sand, 3graded stone agg 20mm N/S) and curing complete excluding cost of form work and reinforcement for fainforced concreet work in wall (any thikness)atteched pillastter,buttresses beam girders and contilevers upto the floor lavel. | ||||||
Tender Value
₹41.5 L
EMD Value
₹83,029
Closing Date
12 Mar 2026, 11:00 amClosed
Executive Engineer
JSV Division Rohru
SH R R construction of Percolation well 7Mtr dia and 9Mtr dia
2026_HPIPH_130483_1
No.JSV-RD-AB-Tnd/2025- 8457-8520 dt 05.03.2026
Open Tender
Civil Works
90 days
Nawar
Tender Document
8 documents required · 8 mandatory
₹1,500
EE Rohru
₹83,029
7 May 2026
5 Mar 2026
12 Mar 2026
5 Mar 2026
12 Mar 2026
5 Mar 2026
Excavation in earth work and disposal of all excavated earth upto a lead of 20 metres and lift upto 1.50 metres, disposed earth to be levelled and neatly dressed complete in all respect within all lead and lifts as per the direction of Engineer-in-Charge.
Wet well sinking in Gravel including all pumping shoring etc. with in all leads and lifts.
From speing level to 3mtr
from 3mtr to 6mtr
From 6mtr to 9mtr
Lowering steel well curb in the pit and assembling in position etc. within all leads and lifts.
When depth is up to three metres from ground.
When Depth is more then Three Mtr
Steel work welded in built up sections,trusses and framed work including cutting,hoisting, fixing in position and applying a priming coat of red lead paint in beam joint channels ,angle, Tees Flats with concrete plates or amngle cleets as in main and cross beam hip and jack rafters purlins connected to common rafter and the like with in all leads and lifts
Providing and laying 1:1.5:3(1cement,1.5 sand, 3graded stone agg 20mm N/S) and curing complete excluding cost of form work and reinforcement for fainforced concreet work in wall (any thikness)atteched pillastter,buttresses beam girders and contilevers upto the floor lavel.
foundation
Walls
Column, Pillars, posts and struts up to all floor level
Providing and laying No fine concrete in 1:4(1cement:4stone aggregate 40mm nominal size) and curing complete with weep hole or pores etc. curing complete excluding cost of form work and reinforcement for reinforced concrete work including all leads and lifts.
Providing form work with steel plates 3.15mm thick welded with angle iron in frame 30x30x5mm so as to give a rough finish including centering shuttering strutting and propping etc. height of propping and centering below supporting floor to ceiling not exceeding 4mtrs.and removal of the same for in situ reinforced concrete and plain concrete work including all leads and lifts:
Side of beam haunching contilevers lintals etc. Not exceeding 1Mtr in Depth in all hight from Floor.
Vartical surface.
Columns pillars posts and struts square rectangular or polygonal in plan
Providng ,Laying /Placing Mild steel/tor steel reinforcement for RCC. Work including binding bending and placing in position complete up to all floor level. a) Tor steel
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.54 MB
termandcondition.pdf
Tender Documents • 0.18 MB
BOQ_192900.xls
BOQ • 0.30 MB
F7and8.pdf
Tender Documents • 2.82 MB
F6.pdf
Tender Documents • 0.06 MB
Download all tender documents and submit your bid