Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.0 LAccepted-Finance 145 1 0 NEAR OLD LIC SHIV NAGAR VILLAGE TOWN MODIPURAM CITY MEERUT MEERUT UTTAR PRADESH 250110 INDIA | MEERUT | UTTAR PRADESH | 250110 | L1 | Accepted-Finance L1 | |
| 2 | L2₹31.9 L+₹6.9 L (27.8%)Rejected-Finance B 176 SECTOR 71 NOIDA GAUTAM BUDH NAGAR | NOIDA | GAUTAM BUDH NAGAR | UTTAR PRADESH | L2 | Rejected-Finance L2 |
Tender Value
₹49.2 L
EMD Value
₹50,000
Closing Date
18 Jul 2023, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE ECWD MORADABAD
220 KV SUB STATION MANJHOLA MORADABAD
Shifting of 10MVA Transformer and other relating work at 132 KV S S Gajrola (1Into 63 Plus 2 Into 40 MVA) (District Amroha)
2023_PVVNL_815815_1
01/ECWD/MBD/WORKS/2023-24
Open Tender
Electrical Works
Lump-sum
45 days
MORADABAD
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,450
EE, ECWD,MBD
₹50,000
19 Jul 2023
27 Jun 2023
18 Jul 2023
27 Jun 2023
18 Jul 2023
27 Jun 2023
1. Safe carriage of following stock material, from any of the Store Center of PPVNL to site of 33/11KV S/S Gajroula (132KV Compund). (Distance approx.- 150Kms.):for Item No. 1.01 to 1.20 1.01 – 33KV VCB with structure
11KV Alumn. Cable XLPE- 3x300/33KV, 3x300Sq.mm
33KV C.T. 200/100/1A / 33KV CT 400/200/1A
ACSR Dog Conductor
33KV Bus Isolator / Line Isolator
33KV Post Insulator
33KV Fuse set
33KV Lighting Arrestor
90LBS Rail Pieces
11KV J/Kit HS 300sqmm Indoor type / Outdoor type
33KV J/Kit HS 300sqmm Outdoor type
Control cable 2x2.5sqmm
Control cable 4x2.5sqmm
M.S Channel 125x65mm
M.S Channel 100x50mm
M.S Angle 75x75x6mm
M.S Angle 50x50x6mm
Single feeder control panel without Diff. relay
Double T/F Control panel without Diff. relay
33KV P.T 33KV/110V
2.0 – Earthing of Outdoor Equipments in Switchyard, as per site requirement/as per PVVNL guideline details as given below:- for Item No.2.01 to 2.02 2.01 Providing M.S Bus Bar 32mm, Digging of Trench of size-0.50x0.75x30M.,for laying of Earthmat throughout in switchyard and refilling & ramming of the same earth into the trenches after completion of Earthmat work, Laying of 32mm.dia M.S.Bar in Trench, properly in alignment along the length and width in switchyard, Cutting of 32mm.dia M.S.Bar-3M.long and making one end in conical shape,by forging process and driving it into the earth, in trench at fixed distance as per drawing and properly welding with M.S.Bar Earthmat, Proper continuous electric welding of overlap joints of M.S.Bar upto a length of 150mm. On both sides,along the length of M.S.Bar and an extra piece of 12mm M.S.Round-150mm.long, providing on both sides of Overlap Joints and continuous electric welding on both side, along the length of M.S.Bar. All joints shall be painted with black bituminous paint, Proper electric welding at X-joints of M.S.Bar and welding by providing 25x6mm.”U” type Clamp of M.S.Flat, and proper continuous electric welding with M.S.Electrode and M.S.Bar at each X-joints. All joints shall be painted with black bituminous paint and as per site requirement. (Relevent materials shall be provided by contractor for above job)
Earthing of I/D & O/D equipment complete. Providing &laying of G.I.Strip of size 50x6mm for connecting the earthmat with each equipment (Bus Isolators, 33KV C.T., 33KV V.C.B., L.As., Fuse Set, Post Insulators, T/F Body & its neutral and M.S.Frame of Cabe Supporting Structure), various steel structures. The work also includes cutting, bending, straightening, over laping and welding the earth strip with earth mat and by using high quality arc welding in already digged trenches, as per PVVNL guidline and as per site requirement.
Making earthing of all 11KV Switchgears, P.T. and other equipments on both earth terminal inside the control room by providing G.I.Strip in size 50x6mm. with 32mm. dia M.S.Round laid in trench with proper electric welding, as per PVVNL guidline.
Supply & Erection of water level earthing by Boring and lowering by providing of G.I.Pipe size 40mm dia, into the ground upto water level or minimum 20Mtr, which ever is more, with the lower end of solid copper cone Approx 224mm long and 750gm in weight shall be provided and screwed in pipe as well as bringing out a continuous copper wire 6 SWG, from the cone upto the ground surface where it will be bolted to the G.I. Strip for Transformer neutral connection, the G.I.Strip will be connected to star point through providing Copper Bond Strip of size-35x6mm, as per PVVNL guidline.
5. Construction of 1No. Plinth for 10MVA, 33/11KV T/F, in size-3.46x4.46 Mtrs., as per drawing, as per PVVNL guidline and site requirements, details as given below:-for Item No.5.01 to 5.03 5.01–Excavation of earth in foundation. Cement concrete in foundation in ratio 1:6:12, Cement, Sand & Brick ballast., First Class Brick work in ratio 1:4 with Cement & Coarse sand mortar., Cement concreting inner side of plinth in ratio 1:4:8, Cement, Coarse sand and stone shingle. M.S.work for re-inforcement 12mm. Tor at a distance of 15Cms. apart, including cutting, bending & binding by wire to each other for making JAL in two layer, 12 to 15Cms. apart. Providing of all require material of plinth.
Fixing of 3.5Mtr.long, 2No. Rail Pices, 90Lbs, on top of Plinth at proper distance in alignment by C.C.
Cement concrete in ratio 1:2:4, Cement, Coarse sand & Stone shingle, on top of the plinth, including fixing of M.S.Tor Jal. 12mm.thick Cement Plaster in ratio 1:4, Cement & Sand mortar, on all side of plinth, Neat cement coating 3mm.thick on top surface of plinth.
Installation of 33KV Bus Isolator/Line Isolator with structure, Fabrication, excavation, erection, grouting (with cement, coarse sand and stone shingle) and making of plinth of BUS ISOLATOR STRUCTURE as per RESPO Drawing, as per PVVNL guidline and site requirements :for Item No.6.01 to 6.02 6.01 – Fabrication of Structure, including cutting, straightening & drilling of holes in Channel/Angle etc.
Excavation of earth, Grouting of structure in C.C. ratio 1:4:8, Erection of Line/Bus Isolator structure in proper alighment., Making plinth by C.C. ratio 1:3:6 and 12mm thick plastering on plinth in ratio 1:4
7. Febrication of Structure including cutting, straightenly & drilling of holes in channel/angle etc as per RESPO specification of the following : for Item No.7.01 to 7.08 7.01 – Post insulator structure
33KV C.T Strucure
33KV Fuse set structure
33KV L.A Structure
M.S Frame for cable
33KV VCB Structure
33KV P.T Structure
Neutral Link Structure (Providing copper bond Strip)
8. Excavation of earth in size, erection of above structure (mentioned in S.I No.-7, groutings C.C in ratio, making plinth by C.C ratio 1:3:6, 12mm thick plasting on plinth in ratio 1:4.(All Structure)
9. Installation & mounting of materials on erected structure given above in S.I No.7 & 8.: for Item No.9.01 to 9.07 9.01 – Mounting of 33KV Post Insulator
Bus Isolator Structure / Line Isolator
33KV C.T (200/100/1A, PVVNL Item) / 400/200/1A
Mounting of 33KV Fuse Set
Mounting of 33KV L.A
33KV VCB
33KV P.T 33KV/110V
Installation of 33KV Control panel, Earthing, Grouting, and Establishment in control room.: for Item No.10.01 to 10.02 10.01 – Single Feeder Control Panel with Diff. Relay
Double T/F Control panel without Diff. relay
Making of copper Bus bar structure and providing copper bus bar 65x8x3000Mtr. Long-03 No., Pin insulatorf-03No., E-clamp-03No., fabrication and Installation etc. as per respo norms.
Shifting and Removing of Old existing Iron fencing. Old unused RCC plinths & assembling to other space.
Laying, Stringing & Sagging of ACSR Dog Conductor from main Bus Bar to Power T/F, through Post Insulator, Bus Isolator, C.Ts, VCB and L.As., by fixing P.G.Clamp/Connectors, suitable for Dog.
Tree Cutting (01 No. Big Tree)
Making of Main Bus Bar complete and providing of all material as like Panther Conductor, Disc Insulator, Disc Fitting, Channel, Angle, P.G Clamp, Nut & Bolts etc with appropriate paintings.
Providing HDPE Pipe , PE80, PN-6, DN-160M with Drilling and Laying double cable 3x300sqmm single length with HDD method (Trenchless U/G)
Laying of 33KV 3x300sqmm cable in air and loop
Making of New Septic Tank Complete (Include soak pit and soil filling and Dismentling of RCC providing with all require materials as per work details provided by Civil (D) division
Safety/Dragging/lifting of 33/11KV, 10MVA T/F on Plinth from the unloaded place.
Erection of 33/11KV, 10MVA Power T/F on Plinth, by fixing all accessories, like Radiators, Conservator Tank, Filling the T/F Oil to desired level and ensuring that there is no leakage, complete job in all respect.As per PVVNL guidline.Empty drums shall be provided by contractor
Digging of Trench of size 0.45x0.6M., for laying of 11KV Cable for incoming feeder and T/F in double layer.
Laying of 11KV XLPE 3x300/33KV 300Sq.mm. Alumn.Cable in the Trench, for T/F and Feeders, from Control Room. As per PVVNL guidline & actual site conditions.
providing & laying of Ist Class Bricks on both sides and on Top of the Cable. Filling the Sand, inside the Bricks and refilling of loose earth in the Trench. As per PVVNL guidline & actual site conditions in double layer.
Making of joints by 11KV (3x300Sq.mm) Heat Shrink type Jointing Kits, Indoor/Outdoor type, providing & fixing of Alumn. Lugs of proper size, by crimping on each phase of the Cable at both ends.
Making of joints by 33KV (3x300Sq.mm) Heat Shrink type Jointing Kits, Outdoor type, providing & fixing of Alumn. Lugs of proper size, by crimping on each phase of the Cable at both ends.
Fixing of Cable Box on 10MVA T/F, 11KV Switchgears, by Bolt & Nuts and tapping the joints by providing HT/Empire/PVC Tape and Copper Strip of size 50x6mm., 75mm.long, including proper tapping.
Laying of Control Cable in Packka Trench, from VCB/CTs/T/F to 33KV Control Panel and making connection for operation & protection of equipments, by using ferrules including commissioning battery charger with battery by providing copper lead with lugs & dressing of Control Cable and making arrangement for testing in the equipments.
Road Restroration of in Pakka Road where ever necessary.
Repairing of old existing cable trench
CONSTRUCTION OF CONTROL CABLE TRENCH IN SWITCHYARD, AS PER DETAILS (LENGTH-30.00MTR.) as per site requirement, for Item No.28.01 tp 28.05 28.01 – Excavation of earth in size 0.80x0.40m., C.C.work in foundation in ratio 1:4:8 (Cement, sand & Brick Ballast) with proper ramming in size 0.80x0.15m., Ist Class Brick work in cement mortar in ratio 1:4. as per site requirement.
Providing &Grouting of M.S.Strip of size 25x6mm in cable trench 100mm above floor level and at equal space distance 300mm
Providing Grouting of M.S.Angle Iron of size 50x50x6mm in upper edge of trench.
C.C.work on the Top in the ratio 1:2:4 in the grouting of Edge of the Trenches. & plastring of trench.
Providing Fabrication and fixing cable trench cover of providing M.S.Angle Iron size 40x40x6mm of size 0.3m wide 0.5 to 1.0 mtr length. As per site requirement.
Construction of S.S.Os. Approach Road-1.5M wide in switch yard by laying dry brick-ballast in 15Cm layer, 115mm thick brick work 1:4 in both side of edge, providing 10Cm thick CC in ratio 1:2:4. the work includes proper plastering top & side of road and making groove, leveling & dressing of earth beneath the brick work on edge. as per site requirement & PVVNL guidline.
Painting of the following structure with one coat of ready mixed primer and two coats of ISI Mark Alumn. Paint after rubbing with sand paper to the surface of the structure includidng labour and T&P complete in all respect.:for Item No. 30.01 tp 30.07 30.01 – Bus Isolator Structure / Line Isolator
Fuse Set Structure
Post Insulator, L.A.Structure, P.T Structure
V.C.B.Structure, C.T.Structure
M.S.Frame for Cable
Neutral Link Structure
Copper Bus bar structure
Hiring of D/G Set, including carriage, loading, unloading & operating charges (with fuel) at 33/11KV Substation, :for Item No.31.01 to 31.02 31.01 – 20 KVA, 3 Phase D/G Set for testing of equipments installed at Sub-station.
5 KVA, Single Phase D/G Set for testing of equipments installed at Sub-station.
Providing required No. of Technicians to work on power T/F, HT/LT Panels, during testing as assisting technical hands of test team during commissioning & energisation.
Saraswati Electricals & Contractors
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .