Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.6 LAdmitted-Fee/PreQual/Technical/Finance | -27.99% | ₹3.6 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹3.7 LAdmitted-Fee/PreQual/Technical/Finance | -25.15% | ₹3.7 L | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹3.7 LAdmitted-Fee/PreQual/Technical/Finance | -25.10% | ₹3.7 L | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹3.8 LAdmitted-Fee/PreQual/Technical/Finance | -23.51% | ₹3.8 L | L4 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹5.0 L
EMD Value
₹9,900
Closing Date
18 Jun 2026, 6:00 pmClosed
xen
bda office
VPS park me varsha jal prabandhan hetu Send pile lagane ka karya
2026_UITBR_566566_1
online nit 19(2026-2027)01 bharatpur Development Authorit
Open Tender
Miscellaneous Works
Percentage
bharatpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Secretary, BDA
₹9,900
Yes
22 Jun 2026
10 Jun 2026
19 Jun 2026
10 Jun 2026
18 Jun 2026
10 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator )/ manual means over areas (exceeding 30cm in depth. 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5 m , disposed earth to be levelled and neatly dressed : All kinds of soil | 54.18 | Cum | 175 | ₹9,481.5 |
| 2 | Supply of Quarried stone and hand breaking Supply of quarried stone and hand breaking into coarse aggregate to Grading 1 (63 mm to 45 mm) as per Table 400-9 of MoRTH Specifications. | 11.21 | Cum | 670 | ₹7,513.38 |
| 3 | Supply of Quarried stone and hand breaking Supply of quarried stone and hand breaking into coarse aggregate to Grading 2 (53 mm to 22.4 mm) as per Table 400-9 of MoRTH Specifications. | 20.56 | Cum | 735 | ₹15,110.87 |
| 4 | RAIN WATER HARVESTING Construction of tubewell up to 100m depth and above to accomodate housing and assembly pipe in all types of alluvium strata by rotay drilling method with "code of practice for construction and testing of tubewells (IS:2800 (Part-II) : 1991 and IS:2800 (Part-II) :1979 both amended up to date) with supply of bail plug if necessary.The work will not include cost of housing pipe and strainer pipe assembly cost, gravel and development work. Work would be deemed completed only after obtaining sound free water during pumping. 200 mm nominal bore | 306 | Rm | 1,198 | ₹3,66,588 |
| 5 | Supply & lying River-gravels of following sizes in recharge shaft, filter pit after screening & washing from kachha shift without deduction of voids Size 9 to 12 mm | 13.08 | Cum | 1,997 | ₹26,126.75 |
| 6 | Supply & lying River-gravels of following sizes in recharge shaft, filter pit after screening & washing from kachha shift without deduction of voids Size 3 to 5 mm | 14.95 | Cum | 2,928 | ₹43,779.46 |
| 7 | Supply & laying of clean, clear sharp river sand of size 1 to 2mm coarse, without deduction of voids. | 7.2 | Cum | 3,727 | ₹26,834.4 |
stage.html
html • 0.02 MB
finance_1008074.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.31 MB
BOQ_1008074.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].