Loading…
Loading…
Tender Value
₹30 L
EMD Value
₹60,000
Closing Date
25 Aug 2026, 6:00 pmDue tomorrow
Garrison Engineer
Garrison Engineer (U) Chandimandir Pin code- 134107
CA NO GE(U)/CHM-32/2026-27 REPAIR/ MAINT OF COLD STORAGE, DUCTABLE ACS, WALK-IN-COOLERS, INCLUDING CONNECTED ITEMS IN THE AOR OF AGE E/M CH AT COMMAND HOSPITAL (WC) CHM
2026_MES_780869_1
GE(U)/CHM-32/2026-27
Open Tender
Electrical and Maintenance Works
Item Rate
240 days
GE (U) Chandimandir
Please refer to tender documents
5 documents required · 5 mandatory
₹500
GE (U) Chandimandir
₹60,000
Yes
25 Aug 2026
27 Jul 2026
29 Aug 2026
27 Jul 2026
25 Aug 2026
11 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Material and labour for servicing of outdoor unit of capacity 3 TR to 11.0 TR ductable AC/ walk in cooler after disconnecting all electric connection, the washing of outdoor unit will be carried out with pressure mixed with company certified chemical with water, after washing dry with air blower and connect all electric connection and testing for entire satisfaction of Engr-in-Charge. | 20 | Each Job | - | - |
| 2 | Material and labour for servicing of indoor unit of capacity 3 TR to 11.0 TR ductable AC/ walk in cooler to complete including blower fan, inside cabin with company certified chemical mixed with water and sub zero display if any adjustment or calibration required & testing for entire satisfaction of Engr-in-Charge. | 20 | Each Job | - | - |
| 3 | Supply , installation and testing of outdoor unit of capacity 3/3.5 TR, Three phase and suitable for maintain minus 2˚C to minus 8˚ C complete including New MS Stand for out door unit, copper pipe with connection including taking out carefully defective and worn out outdoor unit from the walk-in cooler after disconnecting all incoming and outgoing electric, drain & copper pipe connection etc, and deposit to store and testing of leakage including supply & top up gas and testing for entire satisfaction of Engr-in-Charge. | 2 | Each Job | - | - |
| 4 | Supply , installation and testing of indoor unit of capacity 3/3.5 TR, Three phase and suitable for maintain minus 2˚C to minus 8˚ C complete including New MS Stand for out door unit, copper pipe with connection including taking out carefully defective and worn out indoor unit from the walk-in cooler after disconnecting all incoming and outgoing electric, drain & copper pipe connection etc, and deposit to store and testing of leakage including supply & top up gas and testing for entire satisfaction of Engr-in-Charge. | 2 | Each Job | - | - |
| 5 | Supply , installation and testing of outdoor unit of capacity 11.0 TR, Three phase and suitable for maintain 20˚C to 24˚ C all weather type complete including New MS Stand for outdoor unit, copper pipe with connection including taking out carefully defective and worn out outdoor unit from the ductable air conditioners after disconnecting all incoming and outgoing electric, drain & copper pipe connection etc, and deposit to store and testing of leakage including supply & top up Gas and testing for entire satisfaction of Engr-in-Charge. | 2 | Each Job | - | - |
| 6 | Supply , installation and testing of 3 phase, 11.0 TR ductable indoor unit all weather type with all necessary measuring, display, and operating remote controls etc and connect with existing duct incl. taking out carefully indoor unit after disconnecting all incoming and outgoing electric,drain & copper pipe line connection and deposit to store and testing for entire satisfaction of Engr-in-Charge. | 2 | Each Job | - | - |
| 7 | Supply , installation and testing of outdoor unit of capacity 8/ 8.5 TR, Three phase and suitable for maintain 20˚C to 24˚ C all weather type complete including New MS Stand for outdoor unit, copper pipe with connection including taking out carefully defective and worn out outdoor unit from the ductable air conditioners after disconnecting all incoming and outgoing electric, drain & copper pipe connection etc, and deposit to store and testing of leakage including supply & top up Gas and testing for entire satisfaction of Engr-in-Charge. | 3 | Each Job | - | - |
| 8 | Supply , installation and testing of of 3 phase, 8/ 8.5 TR ductable indoor unit all weather type with all necessary measuring, display, and operating remote controls etc and connect with existing duct incl. taking out carefully indoor unit after disconnecting all incoming and outgoing electric,drain & copper pipe line connection and deposit to store and testing for entire satisfaction of Engr-in-Charge. | 3 | Each Job | - | - |
| 9 | Supply and fix as in replacement compressor of capacity 3/3.5 TR, 3 Phase, 415 volts, AC Supply, 50Hz for cold storage all as directed by Engr-in-Charge. | 2 | Each | - | - |
| 10 | Supply and fix as in replacement compressor of capacity 5.5 TR , 3 Phase, 415 volts, AC Supply, 50Hz for Ductable outdoor unit all as directed by Engr-in-Charge. | 1 | Each | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.21 MB
BOQ_874743.xls
BOQ • 0.29 MB
Tenderdocuments32.pdf
Tender Documents • 0.56 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].