| 1 | L1₹2.7 CrAccepted-Finance | ₹2.7 Cr | L1 | Accepted-Finance OK |
| 2 | L2₹2.9 Cr+₹12.0 L (4.38%)Accepted-Finance | ₹2.9 Cr+₹12.0 L (4.38%) | L2 | Accepted-Finance OK |
| 3 | L3₹2.9 Cr+₹15.2 L (5.57%)Accepted-Finance | ₹2.9 Cr+₹15.2 L (5.57%) | L3 | Accepted-Finance OK |
| 4 | L4₹2.9 Cr+₹16.8 L (6.14%)Accepted-Finance | ₹2.9 Cr+₹16.8 L (6.14%) | L4 | Accepted-Finance OK |
| 5 | L5₹3.0 Cr+₹27.9 L (10.2%)Accepted-Finance OPPOSIT RELIANCE PETROL PUMP NEAR SINGLA DHARAM KANTA SIRSA ROAD FATEHABAD FATEHABAD HARYANA 125050 | FATEHABAD | HARYANA | 125050 | ₹3.0 Cr+₹27.9 L (10.2%) | L5 | Accepted-Finance OK |
Tender Value
₹3.0 Cr
EMD Value
₹3 L
Closing Date
18 Jul 2023, 5:00 pmClosed
SE ETC NOIDA
220 KV SUBSTATION SECTOR-20 NOIDA
Construction of 220 kV Double Circuit Line from Common Point of under construction 4x220 kV Multicircuit Line To 220 kV GIS Substation Sector-45 Noida under ETD-I, Noida
2023_UPTCL_813387_1
E-T-27/ETCN/2023-24
Open Tender
Electrical Works
Item Rate
120 days
NOIDA
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,950
EE ETD NOIDA
₹3 L
25 Nov 2023
19 Jun 2023
19 Jul 2023
19 Jun 2023
18 Jul 2023
19 Jun 2023
Amount
Part-A Supply
Design of 220 kV DC monopoles suitable for ACSR Zebra conductor with extension nuts, bolts, washers & ladders etc. and its foundations (design of monopoles & its respective foundations duly approved from any of the Govt. approved test lab i.e. CPRI/IIT (Mumbai, Delhi, Chennai, Roorkee, Khadagpur, Kanpur).
DC PA (0-2 degree) with Bottom X-arm at 21 mtr.
DC PD (30-60 degree) with Bottom X-arm at 21 mtr.
DC PC (15-30 degree) with Bottom X-arm at 36 mtr.
Fabrication, galvanizing, inspection & supply of 220 kV DC monopoles suitable for ACSR Zebra conductor with extension nuts, bolts, washer & ladders etc. as per design at Sl.No.1.11,1.12&1.13.
DC PA (0-2 degree) with Bottom X-arm at 21 mtr.
DC PD (30-60 degree) with Bottom X-arm at 21 mtr.
DC PC (15-30 degree) with Bottom X-arm at 36 mtr.
Supply of Narrow Base Towers- Fabrication, galvanising, inspection and supply of 220 kV DC narrow base towers including nut bolts & washers, stubs, extensions, stub setting template etc. as per UPPTCL duly adopted designs, drawings & BOM.
HT Steel (2 nos. D+25 & 1 No. D+9 type towers)
MS Steel(2 nos. D+25 & 1 No. D+9 type towers)
Nuts & Bolts
Supply of Tower Accessories
Number plate
Danger plate
Phase plate in set of Red Blue & Yellow
Pipe type earthing material
Supply of Hardware suitable for ACSR Zebra
Single suspension fitting
Single tension fitting
Double tension fitting
SS Pilot fitting
Supply of Conductor Accessories suitable for ACSR Zebra
Vibration dampers
Mid Span compression Joint
Repair sleeves
Preformed Armour Rod
Composite Silicon Rubber insulator string of 70KN suitable for suspension fitting
Composite Silicon Rubber insulator string of 160KN suitable for tension fitting
Supply of OPGW wire including accessories and testing of equipments
24 fibre OPGW
Supply of hardware set for 24 fibre OPGW
Joint box (24 Fibre)
FODP 48 F
Fibre Optic approach Cable for 24 F OPGW
Supply of hardware set for 24 fibre OPGW Optic approach Cable
Part-B Work
Survey including preparation of final tower schedule of material marking of location (Route length) and super impose the GPS coordinates of locations on elevated road plan to get the clearance from other objects etc. before start the work.
Check survey & final peg marking (Route length)
Soil investigation
Monopole Work
Cost of excavation of 220 KV DC MONOPOLE foundation pits including all earth work, back filling and leveling etc.
Cost of concreting for all types 220 KV DC MONOPOLE foundation including cost of cement, dewatering, shorting and shuttering, forming & curing but excluding cost of reinforcement bars with 1:1.5:3 mix concrete.
Cost of pilling upto 10 mtr depth as per requirement of set cost also includes laying of reinforcement & bentronite bags but excludes the cost of reinforcement & concrete. One Job defined as the work at one location.
Cost for setting & alignment of bolts along with sacrificial & normal template for 220 kV DC monopoles.
Installation of steel reinforcement bars in RCC foundation including cost of steel reinforcement bars with cutting, bending, placing, binding etc.
Erection of 220 kV Monopoles and their extensions accessories wherever required including all work above ground level excluding hoisting of insulators and hardware.
DC PA (0-2 degree) with Bottom X-arm at 21 mtr.
DC PD (30-60 degree) with Bottom X-arm at 21 mtr.
DC PC (15-30 degree) with Bottom X-arm at 36 mtr.
Tack welding of all the bolts at Base Plate of Monopole.
Ground work including earth material for pipe type earthing.
Narrow Base Tower Erection work
Excavation of foundation including of material forming, dewatering, shoring, shuttering etc.
Setting of stub for Narrow base D+25 towers
Setting of stub for Narrow base D+9 towers
Concreting of PCC foundation 1:3:6 ratio of cement coarse sand and stone ballast including cost of arrangement of form box, shoring, shuttering & back filling curing including the cost of cement, coarse sand & stone ballast etc.
Concreting of foundation RCC 1:2:4 ratio of cement coarse sand and stone ballast including cost of arrangement of form box, shoring, shuttering & back filling curing including the cost of cement, coarse sand & stone ballast etc.
Reinforcement work of foundation including cutting, bending, welding as per specification & drawing complete including cost of material, labour, tools & plants & wastage of steel etc.
Erection of super structure including of all work above ground level excluding hoisting of insulators but including fitting of danger plate, phase plate, number plate and punching of bolts for narrow base tower as given above.
Laying, tensioning, stringing, clamping, jointing etc complete with ACSR Zebra conductor double circuit including hoisting of insulators fitting of all 12 phases with necessary hardware & accessories etc.
Laying, tensioning, stringing, clamping, jointing etc. complete with optical fiber ground wire including hoisting of all necessary hardware & accessories for OPGW.
Tack welding of tower up to 1st section
Providing barricades for avoiding any accident during the period of excavation to backfilling of soil & during erection.
Dismantling of dividers/ pedestral area, road etc. at locations for the work & making good after completion of work.
AARVANSS BUILDWELL AND INFRACON LLP
KUMAR TRADING COMPANY
Shaurya Shakti Enterprises
VITS Total Power Solutions Pvt. Ltd.
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .