Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹43.0 LAccepted-AOC | ₹43.0 L | L1 | Accepted-AOC Lowest |
| 2 | L2₹45.3 L+₹2.2 L (5.20%)Rejected-Finance OPP MARUTI SERVICE CENTRE SARACHARMA POST SRI VIJAYA PURAM 744 105 | SRI VIJAYA PURAM | SOUTH ANDAMANS | ANDAMAN AND NICOBAR ISLANDS | 744105 | ₹45.3 L+₹2.2 L (5.20%) | L2 | Rejected-Finance Not Lowest |
| 3 | L3₹45.3 L+₹2.3 L (5.28%)Rejected-Finance | ₹45.3 L+₹2.3 L (5.28%) | L3 | Rejected-Finance Not Lowest |
| 4 | L4₹45.4 L+₹2.4 L (5.46%)Rejected-Finance | ₹45.4 L+₹2.4 L (5.46%) | L4 | Rejected-Finance Not Lowest |
| 5 | L5₹46.1 L+₹3.1 L (7.09%)Rejected-Finance | ₹46.1 L+₹3.1 L (7.09%) | L5 | Rejected-Finance Not Lowest |
| Sl No | Description | Qty | Unit | A PALANI L1 | M/S VISHAL CONSTRUCTION L3 | M/s Prem Enterprise L5 | R Janani Engineering Private Limited L6 | V KARTHICK L4 | M/s VMK Construction L8 | CARTWHEEL CONSTRUCTION L9 | LOOK UP ENTERPRISES L7 | M/s Ramesh Lal L2 | JD Construction L10 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Surface excavation n. exc 30 cm deep and averaging 15 cm deep in any type of soil and getting out complete all as specified and directed | 930 | Sqm | 250 ₹2,32,500 | 230 ₹2,13,900 | 229 ₹2,12,970 | 200 ₹1,86,000 | 500 ₹4,65,000 | 125 ₹1,16,250 Lowest | 350 ₹3,25,500 | 250 ₹2,32,500 | 225 ₹2,09,250 | 220 ₹2,04,600 |
| 2.00 | Excavation in trenches n. exc 1.5m wide and exc 1.5m in depth but n. exc 3m depth in hard/dense soil for foundation, etc or for shafts, wells, cesspits, manholes, pierholes, etc n. exc 10 Sqm on plan and getting out complete all as specified and directed | 5 | Cum | 300 ₹1,500 | 350 ₹1,750 | 364 ₹1,820 | 400 ₹2,000 | 1,000 ₹5,000 | 250 ₹1,250 Lowest | 1,000 ₹5,000 | 380 ₹1,900 | 358 ₹1,790 | 2,800 ₹14,000 |
| 3.00 | Returning filling in hard/dense soil including spreading levelling watering and well ramming in layers n. exc 25cm thick complete all as specified and directed | 1 | Cum | 160 ₹160 | 200 ₹200 | 166 ₹166 | 140 ₹140 Lowest | 900 ₹900 | 150 ₹150 | 400 ₹400 | 210 ₹210 | 163 ₹163 | 320 ₹320 |
| 4.00 | Removing excavated material (any type of soil) to a distance n. exc 50m and depositing where directed at a level n. exc 1.5m above the starting point complete all as specified and directed | 99 | Cum | 300 ₹29,700 | 500 ₹49,500 | 437 ₹43,263 | 300 ₹29,700 | 800 ₹79,200 | 150 ₹14,850 Lowest | 600 ₹59,400 | 400 ₹39,600 | 429 ₹42,471 | 350 ₹34,650 |
| 5.00 | M&L for hardcore of broken stone or boulders of gauge n. exc 63 mm deposited spread and levelled in layers n. exc 15 cm thick watered and rammed to a true surface | 139.5 | Cum | 3,500 ₹4,88,250 Lowest | 3,500 ₹4,88,250 Lowest | 3,745 ₹5,22,427.5 | 3,600 ₹5,02,200 | 5,500 ₹7,67,250 | 4,500 ₹6,27,750 | 3,500 ₹4,88,250 Lowest | 3,850 ₹5,37,075 | 3,679 ₹5,13,220.5 | 3,800 ₹5,30,100 |
| 6.00 | M&L for 100mm thick PCC 1:4:8 type D2 (Using 40mm graded stone aggregate) as in path finish the top surfaces even and rough to receive top layer complete all as specified and directed | 930 | Sqm | 1,000 ₹9,30,000 | 980 ₹9,11,400 | 1,123 ₹10,44,390 | 1,200 ₹11,16,000 | 900 ₹8,37,000 Lowest | 1,200 ₹11,16,000 | 1,000 ₹9,30,000 | 1,240 ₹11,53,200 | 1,104 ₹10,26,720 | 1,100 ₹10,23,000 |
| 7.00 | M&L for 100mm thick PCC 1:2:4 type B1 (Using 20mm graded stone aggregate) as in hardstanding/path laid in panels, finish the top surfaces even and fair complete including filling the joints with mastic compound all as specified and directed | 930 | Sqm | 1,400 ₹13,02,000 | 1,500 ₹13,95,000 | 1,477 ₹13,73,610 | 1,500 ₹13,95,000 | 950 ₹8,83,500 Lowest | 1,400 ₹13,02,000 | 1,400 ₹13,02,000 | 1,410 ₹13,11,300 | 1,451 ₹13,49,430 | 1,250 ₹11,62,500 |
| 8.00 | M&L for Spike rolling to surfaces or making impressions of expanded metal, whilst the concrete is green complete all as specified | 930 | Sqm | 50 ₹46,500 Lowest | 200 ₹1,86,000 | 104 ₹96,720 | 100 ₹93,000 | 150 ₹1,39,500 | 250 ₹2,32,500 | 500 ₹4,65,000 | 120 ₹1,11,600 | 102 ₹94,860 | 300 ₹2,79,000 |
| 9.00 | M&L for PCC 1:2:4 type B0 (using 12.5mm graded stone aggregate) as in coping, edging including necessary form work complete all as specified | 0.2 | Cum | 14,000 ₹2,800 | 15,000 ₹3,000 | 15,394 ₹3,078.8 | 12,000 ₹2,400 Lowest | 13,000 ₹2,600 | 14,000 ₹2,800 | 14,500 ₹2,900 | 12,800 ₹2,560 | 15,123 ₹3,024.6 | 13,500 ₹2,700 |
| 10.00 | M&L for plain cement concrete 1:3:6 type C1 (using 20mm graded stone aggregate) as in surface channel or drain or benching in manhole including necessary formwork complete all as specified and directed | 4 | Cum | 12,000 ₹48,000 | 12,500 ₹50,000 | 12,482 ₹49,928 | 10,600 ₹42,400 Lowest | 12,500 ₹50,000 | 13,000 ₹52,000 | 12,000 ₹48,000 | 12,800 ₹51,200 | 12,262 ₹49,048 | 17,500 ₹70,000 |
Tender Value
₹43.5 L
EMD Value
₹87,000
Closing Date
23 Jul 2026, 6:00 pmClosed
GE Haddo Sri Vijaya Puram
GARRISON ENGINEER HADDO MILITARY ENGINEER SERVICES HADDO SRI VIJAYA PURAM 744102
PROVN OF HARDSTANDING WITH PCC FLOORING IN FRONT OF BLDG NO P-3 UNDER GE HADDO, SRI VIJAYA PURAM
2026_MES_776369_1
8264/E8
Open Tender
Civil Works
Item Rate
180 days
GE Haddo Sri Vijaya Puram
Class D and Category a(i)
9 documents required · 9 mandatory
₹500
GE Haddo
₹87,000
Yes
21 Sept 2026
3 Jul 2026
25 Jul 2026
3 Jul 2026
23 Jul 2026
17 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Surface excavation n. exc 30 cm deep and averaging 15 cm deep in any type of soil and getting out complete all as specified and directed | 930 | Sqm | - | - |
| 2 | Excavation in trenches n. exc 1.5m wide and exc 1.5m in depth but n. exc 3m depth in hard/dense soil for foundation, etc or for shafts, wells, cesspits, manholes, pierholes, etc n. exc 10 Sqm on plan and getting out complete all as specified and directed | 5 | Cum | - | - |
| 3 | Returning filling in hard/dense soil including spreading levelling watering and well ramming in layers n. exc 25cm thick complete all as specified and directed | 1 | Cum | - | - |
| 4 | Removing excavated material (any type of soil) to a distance n. exc 50m and depositing where directed at a level n. exc 1.5m above the starting point complete all as specified and directed | 99 | Cum | - | - |
| 5 | M&L for hardcore of broken stone or boulders of gauge n. exc 63 mm deposited spread and levelled in layers n. exc 15 cm thick watered and rammed to a true surface | 139.5 | Cum | - | - |
| 6 | M&L for 100mm thick PCC 1:4:8 type D2 (Using 40mm graded stone aggregate) as in path finish the top surfaces even and rough to receive top layer complete all as specified and directed | 930 | Sqm | - | - |
| 7 | M&L for 100mm thick PCC 1:2:4 type B1 (Using 20mm graded stone aggregate) as in hardstanding/path laid in panels, finish the top surfaces even and fair complete including filling the joints with mastic compound all as specified and directed | 930 | Sqm | - | - |
| 8 | M&L for Spike rolling to surfaces or making impressions of expanded metal, whilst the concrete is green complete all as specified | 930 | Sqm | - | - |
| 9 | M&L for PCC 1:2:4 type B0 (using 12.5mm graded stone aggregate) as in coping, edging including necessary form work complete all as specified | 0.2 | Cum | - | - |
| 10 | M&L for plain cement concrete 1:3:6 type C1 (using 20mm graded stone aggregate) as in surface channel or drain or benching in manhole including necessary formwork complete all as specified and directed | 4 | Cum | - | - |
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.29 MB
8246Tender.pdf
Tender Documents • 1.08 MB
BOQ_869398.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .