| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.8 CrAdmitted-Finance | ₹9.8 Cr | L1 | Admitted-Finance |
| 2 | L2₹9.8 Cr+₹3,673.44 (<0.01%)Admitted-Finance | ₹9.8 Cr+₹3,673.44 (<0.01%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/s Koze Zango Enterprises L1 | M/s M.M. Enterprises L2 |
|---|---|---|---|---|---|
| 1.00SH : Embankment - 3.00 Km | |||||
| 1.01 | Embankment Construction with Material Obtained from Borrow Pits (Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2) | 12,597.51 | cum | 260 ₹32,75,352.6 Lowest | 296 ₹37,28,862.96 |
| 2.00SH : C.C. Pavement - 3.00 Km | |||||
| 2.01 | Preparation of sub grade by excavating earth to an average depth of 22.50 cm, dressing to camber and consolidating with road roller, making good the undulations etc. and disposal of surplus earth, lead upto 50 m. | 22,500 | sqm | 110 ₹24,75,000 | 89 ₹20,02,500 Lowest |
| 2.02 | Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. (i) for grading- I Material | 3,375 | cum | 1,850 ₹62,43,750 | 1,750 ₹59,06,250 Lowest |
| 2.03 | Wet Mix Macadam (Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base /base course on well prepared surface and compacting with vibratory roller to achieve the desired density.) | 3,375 | cum | 2,200 ₹74,25,000 Lowest | 2,420 ₹81,67,500 |
| 2.04 | Dry Lean Cement Concrete Sub- base (Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing.) | 2,730 | cum | 4,950 ₹1,35,13,500 Lowest | 5,255 ₹1,43,46,150 |
| 2.05 | Cement Concrete Pavement (Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing ) | 3,300 | cum | 12,500 ₹4,12,50,000 | 11,990 ₹3,95,67,000 Lowest |
| 3.00SH : R.C.C. Drain (90 cm x 90 cm) - 555.00 Mtr. | |||||
| 3.01 | Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.) (i) Ordinary soil, (A) Manual Means - Upto 3 m depth | 466.2 | Cum | 399 ₹1,86,013.8 Lowest | 485 ₹2,26,107 |
Tender Value
₹9.8 Cr
EMD Value
₹9.8 L
Closing Date
2 Aug 2024, 11:00 amClosed
Executive Engineer, PWD, Pasighat Division.
Executive Engineer, PWD, Pasighat Division, PO-PS-Pasighat, Dist-East Siang, Arunachal Pradesh, 791102.
Construction of Intermediate CC Pavement Link road from NH-515 to Tabi Diking road (L-3 Kms) in East Siang District. SH - CC Pavement, RCC drain, Box culvert, protection works and embankment.
2024_PWDAP_1891_1
PA/CON-1/2024-25/1500-07 Dtd.17/07/2024
Open Tender
Civil Works – Roads
Item Rate
730 days
Tabi Diking
Please refer Tender documents.
8 documents required · 8 mandatory
₹10,000
EE PWD PASIGHAT
₹9.8 L
Office of the Executive Engineer PWD Pasighati
2 Sept 2024
19 Jul 2024
5 Aug 2024
19 Jul 2024
2 Aug 2024
22 Jul 2024
20 Jul 2024
Amount
SH : Embankment - 3.00 Km
Embankment Construction with Material Obtained from Borrow Pits (Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2)
SH : C.C. Pavement - 3.00 Km
Preparation of sub grade by excavating earth to an average depth of 22.50 cm, dressing to camber and consolidating with road roller, making good the undulations etc. and disposal of surplus earth, lead upto 50 m.
Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. (i) for grading- I Material
Wet Mix Macadam (Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base /base course on well prepared surface and compacting with vibratory roller to achieve the desired density.)
Dry Lean Cement Concrete Sub- base (Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing.)
Cement Concrete Pavement (Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing )
SH : R.C.C. Drain (90 cm x 90 cm) - 555.00 Mtr.
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.) (i) Ordinary soil, (A) Manual Means - Upto 3 m depth
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)
Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. (A) PCC Grade M15
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications
SH : RCC Box Culvert 2.00 x 2.00 mtr. Span (Carriage way width= 9.00m) - 12 Nos.
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.) (i) Ordinary soil, (A) Manual Means - Upto 3 m depth
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)
Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. (A) PCC Grade M15
Furnishing and Placing Reinforced / Prestressed cement concrete in super-structure as per drawing and Technical Specification. (A) RCC Grade M20, Using Concrete Mixer (i) For solid slab super-structure, 20-30% of (a+b+c) (p) Height upto 5m
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification.(A) Granular material
a) 6th year @ 2% on the sum of the items ranging from S/L No. 1.01 to 4.07
b) 7th year @ 2% on the sum of the items ranging from S/L No. 1.01 to 4.07
c) 8th year @ 2% on the sum of the items ranging from S/L No. 1.01 to 4.07
d) 9th year @ 2% on the sum of the items renging from S/L No. 1.01 to 4.07
e) 10th year @ 2% on the sum of the items renging from S/L No. 1.01 to 4.07
M/s M.M. Enterprises
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.14 MB
TenderDoc.pdf
Tender Documents • 3.48 MB
BOQ_2029.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .