| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹37.5 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹46.2 L+₹8.7 L (23.3%)Rejected-Finance | L2 | Rejected-Finance OTHER THAN LOWEST BIDDER | |
| 3 | Rejected-Technical | - | Rejected-Technical NOT ENLISTED IN ELIGIBLE CATEGARY |
Tender Value
₹34.5 L
EMD Value
₹69,000
Closing Date
9 Mar 2022, 6:00 pmClosed
GE 881 EWS C/O 56 APO
GE 881 EWS C/O 56 APO
PROVN OF GUARD ROOM WITH ALLIED INFRASTRUCTURE AT SURANKOTE, PROVN OF TOILET BLOCK OF TWO BATHROOM AND TWO WATER CLOSETS WITH SEPTIC TANK (20 USERS) AND SOAKAGE PIT AT SURANKOTE AND PROVN OF FOL STORAGE ROOM AT LKG UNDER GE 881 EWS
2022_MES_500997_2
GE/PNH-68/2021-22
Open Tender
Civil Works
Lump-sum
270 days
GE 881 EWS C/O 56 APO
AS PER TENDER DOCUMENTS
8 documents required · 8 mandatory
₹500
GE 881 EWS
₹69,000
Yes
4 Jul 2022
22 Feb 2022
11 Mar 2022
22 Feb 2022
9 Mar 2022
23 Feb 2022
Amount
Schedule 'A' Part-I (Building Work) JOB NO. KG/LBW-03/2021-22 (Guard Room at Surankote), KG/RW/02/2021-22 (Toilet Block at Surankote) and KG/RW/01/2021-22 (FOL storage room at LKG)
Total amount of Sch 'A' Part-I (Building work) brought forward from srl page No-21
Schedule 'A' Part-II (Internal Water Supply works) JOB NO. KG/LBW-03/2021-22 (Guard Room at Surankote) and KG/RW/02/2021-22 (Toilet Block at Surankote)
Total amount of Sch 'A' Part-II (Internal Water Supply works) brought forward from srl page No-22
Schedule 'A' Part-III (Plumbing works) JOB NO. KG/LBW-03/2021-22 (Guard Room at Surankote) and KG/RW/02/2021-22 (Toilet Block at Surankote)
Total amount of Sch 'A' Part-III (Plumbing works) brought forward from srl page No-23
Schedule 'A' Part-IV (Internal Electrification works) JOB NO. KG/LBW-03/2021-22 (Guard Room at Surankote) and KG/RW/02/2021-22 (Toilet Block at Surankote)
Total amount of Sch 'A' Part-IV (Internal Electrification works) brought forward from srl page No-27
Schedule 'A'Part-V (Excavation and EarthWork) JOB NO. KG/LBW-03/2021-22 (Guard Room at Surankote), KG/RW/02/2021-22 (Toilet Block at Surankote) and KG/RW/01/2021-22 (FOL storage room at LKG)
Total amount of Sch 'A' Part-V (Excavation and EarthWork) brought forward from srl page No-28
Schedule 'A'Part-VI (Sewage Disposal Works) JOB NO. KG/LBW-03/2021-22 (Guard Room at Surankote) and KG/RW/02/2021-22 (Toilet Block at Surankote)
Total amount of Sch 'A' Part-VI (Sewage Disposal Works) brought forward from srl page No-30
Schedule 'A'Part-VII (External water supply Works) JOB NO. KG/LBW-03/2021-22 (Guard Room at Surankote) and KG/RW/02/2021-22 (Toilet Block at Surankote)
Total amount of Sch 'A' Part-VII (External water supply Works) brought forward from srl page No-31
Schedule 'A'Part-VIII (External Electric supply Works) JOB NO. KG/LBW-03/2021-22 (Guard Room at Surankote) and KG/RW/02/2021-22 (Toilet Block at Surankote)
Total amount of Sch 'A' Part-VIII (External Electri supply Works) brought forward from srl page No-33
Schedule 'A'Part-IX (Path Works) JOB NO. KG/LBW-03/2021-22 (Guard Room at Surankote), KG/RW/02/2021-22 (Toilet Block at Surankote) and KG/RW/01/2021-22 (FOL storage room at LKG)
Total amount of Sch 'A' Part-IX (Path Works) brought forward from srl page No-34
Schedule 'A'Part-X (Area Drainage Works) JOB NO. KG/LBW-03/2021-22 (Guard Room at Surankote), KG/RW/02/2021-22 (Toilet Block at Surankote) and KG/RW/01/2021-22 (FOL storage room at LKG)
Total amount of Sch 'A' Part-X (Area Drainage Works) brought forward from srl page No-35
Schedule 'A'Part-XI (Protective Works) JOB NO. KG/LBW-03/2021-22 (Guard Room at Surankote) and KG/RW/02/2021-22 (Toilet Block at Surankote)
Total amount of Sch 'A' Part-XI ( Protective Works) brought forward from srl page No-36
Schedule 'A'Part-XII (Heating Appliances Works) JOB NO. KG/LBW-03/2021-22 (Guard Room at Surankote) and KG/RW/02/2021-22 (Toilet Block at Surankote)
Total amount of Sch 'A' Part-XII ( Heating Appliances Works) brought forward from srl page No-37
Schedule 'A'Part-XIII (Misc Items of Works) Note : This schedule is not pre-priced by MES and the pre-priced rate indicated as "Rs 0.00" under Col. 5 siginifies this fact only. JOB NO. KG/LBW-03/2021-22 (Guard Room at Surankote) and KG/RW/02/2021-22 (Toilet Block at Surankote)
Construction of conventional type on site LLDPE septic tank for 5 users designed to carry sewage and sludge water with & including earhtwork in any type of soil and mass concrete in PCC 1:4:8 below foundation, vent shaft, connection etc. complete all as specified.
Construction of conventional type on site LLDPE septic tank for 20 users designed to carry sewage and sludge water with & including earhtwork in any type of soil and mass concrete in PCC 1:4:8 below foundation, vent shaft, connection etc. complete all as specified.
Construction of soakage well 1.20 mtr dia and 3 mtr deep below inlet (depth) from inlet pipe to ground level 45 cm, including excavation and earth work in hard / dense of soil, PCC 1:3:6 type C-2 (using 40 mm graded crushed stone aggregates) in foundation, wall in honey combed brick work in CM 1:4, cover slabg of M-25 (Design mix), filling with brick bats, earth cushion on brick lining on top and inlet pipe 150mm dia, complete all as specified and as shown on drawings.
M&L for cutting the existing GI pipe line and inserting the TEE suitable for connecting GI line complete all as specified and directed.
Modh Hafiz Khan
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .