Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.5 LAccepted-Finance | ₹7.5 L | L1 | Accepted-Finance L1 |
| 2 | L2₹7.7 LAccepted-Finance | ₹7.7 L | L2 | Accepted-Finance L2 |
| 3 | L3₹7.8 LAccepted-Finance | ₹7.8 L | L3 | Accepted-Finance L3 |
Tender Value
₹9.6 L
EMD Value
₹19,209
Closing Date
18 Aug 2026, 12:00 pmClosed
Executive Engineer
Executive Engineer Construction Division-iii, Bisalpur project Deoli
Maintaining and upkeeping of Power house Generator and power transmission system of Bisalpur Dam
2026_WRDAS_588324_1
NIT No. 07 year 2026-27 Item No.1
Open Tender
Civil Works
Percentage
182 days
bisalpur dam
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,000
Yes
via E Challan
₹19,209
Yes
19 Aug 2026
15 Aug 2026
18 Aug 2026
15 Aug 2026
18 Aug 2026
15 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | All in all comprehensive maintenance of 11/0.415 KV or 33/0.415 KV Distribution sub station including 11 KV circuit Breaker , Transformer and its complete accessories , Auto transfer switch ,repairing of LT/HT cables with terminations, LT panel with complete accessories , Sub station Earthings etc with maintaining of Log Books complete in all respect but excluding of transformer oil as and when required. Substation Up to 500 KVA rating Transformer | 4 | Job per KVA P. Month | 5,000 | ₹20,000 |
| 2 | All in all comprehensive maintenance including servicing , replacement of fuel - filter, coolant , lubricating oil etc of Diesel Generating set including auto mains failure (AMF) panel , change over switch , earthing etc as per OEM guidelines and maintenance manual complete in all respet. (Excluding replacement of batteries as and when required.) Above 62.5 KVA | 5 | Job per KVA P. Month | 18,500 | ₹92,500 |
| 3 | Providing & Fixing of self healing IP20 MPP type shunt capacitor (banks) conforming to IS:13340-41 / IEC :831-1&2 OR IEC : 60831-1& 2 in existing panel or parallel with load terminals , the capacitor shall be fitted with discharge resistors, pressure sensitive disconnector ( PSD ) and shall have dissipation factor less than 0.0025 at 50 Hz, Operating loss less than 0.30 Watt per KVAR. Min over current capacity 1.8 times rated current & peak inrush current min. 300 times of rated current, life expectancy greater than 100000hrs (temp class - 25 D) in 440 V including making connections, testing etc. as required.Heavy duty Three phase 440 V, 50 Hz cylindrical type capacitor (Bank) | 150 | KVAR | 334 | ₹50,100 |
| 4 | Cutting & clearance of jungle, bushes, shrubs Ankra/Ipomoea, Juliflora typna etc. on canal and bunds in dry/moist/slushy conditions including disposal as per instructions of the Engineer-in-charge. Cost of wood has been deducted from rates and thus will be property of contractor after cutting. Ordinary | 360 | SQM | 1.45 | ₹522 |
| 5 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in
all respect (B)Hard/Dense Soil | 13.75 | Cum | 79 | ₹1,086.25 |
| 6 | Providing and Laying in position of Cement concrete Nominal mix (1:2:4) including leads of all construction materials, curing, compaction and finishing with rendering in cement sand mortar 1:3 (1cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto; 40 MM | 1.75 | Cum | 5,045 | ₹8,828.75 |
| 7 | Random rubble stone masonry (using R.R.stones where75% stones tobenot less than15cminsize in any direction and weighing not less than23kg.) for foundation including curing with all lead so fall construction materials including curing etc. complete. In cement sand mortar 1:6 | 7.2 | Cum | 3,819 | ₹27,496.8 |
| 8 | Random rubble stone masonry (using R.R.stones where75% stones tobenot less than15cminsize in any direction and weighing not less than23kg.) for foundation including curing with all lead so fall construction materials including curing etc. complete. In cement sand mortar 1:6 Masonry work in superstructure | 12.25 | Cum | 4,009 | ₹49,110.25 |
| 9 | Plaster in cement sand mortar1:4 including racking of joints, smooth finishing & curing etc. complete including all leads of all construction materials of thickness: 20mm | 27 | Cum | 279 | ₹7,533 |
| 10 | Providing and laying cement concrete coping in (1:2:4) with maximumsize of crusher broken aggregate upto20mm including shuttering etc.with all leads of material complete in all respect in thickness of:75 mm | 5 | Cum | 480 | ₹2,400 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.51 MB
Tendernotice_2.pdf
PDF • 1.51 MB
BOQ_1044767.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].