Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹47.9 LAccepted-Finance | ₹47.9 L | L1 | Accepted-Finance The Scheme-1 is cancelled. The work to be awarded for Scheme-2 only for which financial evaluation is done. Bidder is accepted being L1 |
| 2 | L2₹52.3 L+₹4.3 L (9.08%)Rejected-Finance | ₹52.3 L+₹4.3 L (9.08%) | L2 | Rejected-Finance The Scheme-1 is cancelled. The work to be awarded for Scheme-2 only for which financial evaluation is done. Bidder is rejected for scheme-2 being L2 |
| 3 | L3₹58.3 L+₹10.4 L (21.7%)Rejected-Finance | ₹58.3 L+₹10.4 L (21.7%) | L3 | Rejected-Finance The Scheme-1 is cancelled. The work to be awarded for Scheme-2 only for which financial evaluation is done. Bidder is rejected for scheme-2 being L3 |
| 4 | L4₹59.8 L+₹11.9 L (24.7%)Rejected-Finance 1088 SECTOR 44 B CHANDIGARH CHANDIGARH 160044 | 160044 | ₹59.8 L+₹11.9 L (24.7%) | L4 | Rejected-Finance The Scheme-1 is cancelled. The work to be awarded for Scheme-2 only for which financial evaluation is done. Bidder is rejected for scheme-2 being L4 |
| 5 | L5₹62.1 L+₹14.2 L (29.6%)Rejected-Finance | ₹62.1 L+₹14.2 L (29.6%) | L5 | Rejected-Finance The Scheme-1 is cancelled. The work to be awarded for Scheme-2 only for which financial evaluation is done. Bidder is rejected for scheme-2 being L5 |
Tender Value
Refer Docs
EMD Value
₹3.1 L
Closing Date
13 Sept 2024, 6:00 pmClosed
AGM (MM)
O/o CGMT BSNL HP, Kasumpti, Shimla
Tender for Comprehensive construction of ADSS OF Cable in HP Circle
2024_BSNL_206002_1
HPCO-23/11/8/2024-CFA-HPCO
Open Tender
OFC Laying Works
Works
1000 days
Kullu and Dharamshala Business area
Please refer Tender documents.
4 documents required · 4 mandatory
₹2,360
Yes
AO (Claim) O/o CGMT BSNL HP
₹3.1 L
Yes
16 Jan 2025
24 Aug 2024
17 Sept 2024
24 Aug 2024
13 Sept 2024
24 Aug 2024
24 Aug 2024 - 3 Sept 2024
Amount
Material Required
Galvanized steel poles of tubular in design and swaged of the length 7 meters, with top cap welded and lightning spike and including MUFF @ 20 per Kms.
Galvanized steel poles of tubular in design and swaged of the length 8 meters, with top cap welded and lightning spike and including MUFF @ 5 per Kms.
Stay arrangement for 7M/8M steel poles of Galvanised Steel
Formed OFC Dead End and Termination Fittings including all supporting items.(@ 7/Km)
OFC suspension fittings including all supporting items.(@ 18/Km)
Adjustable Cable Storage Bracket.(@ 5/Km)
SERVICES REQUIRED
Erection of 7 m / 8m poles including excavation, fixing of MUFF, concreting, curing, Backfilling, Reinstatement, Compaction of earth, Stay arrangements etc. and sign writing on poles with paint
Slinging / Laying of ADSS / AOF including fixing of installation accessories and fixtures etc. splicing & jointing of OF cable, Link Testing & Acceptance Testing and makeover of route with As Built Diagram (ABD) of installed cost towards collection of ADSS Cable / AOF Cable from BSNL’s Store Depot.
Construction of Joint Chamber as per EI supply & fixing of G.I. Pipe & PLB pipe for bringing down the of cable, supply of stone slab for covering the chamber and sand for filling the chamber
Installation of FDF and WSC/FTB, leading-in arrangement, jointing of pigtails and other related activity for construction of ADSS/Aerial OFC routes
Description of Work / Item(s)
Material Required
Galvanized steel poles of tubular in design and swaged of the length 7 meters, with top cap welded and lightning spike and including MUFF @ 20 per Kms.
Galvanized steel poles of tubular in design and swaged of the length 8 meters, with top cap welded and lightning spike and including MUFF @ 5 per Kms.
Stay arrangement for 7M/8M steel poles of Galvanised Steel
Formed OFC Dead End and Termination Fittings including all supporting items.(@ 7/Km)
OFC suspension fittings including all supporting items.(@ 18/Km)
Adjustable Cable Storage Bracket.(@ 5/Km)
SERVICES REQUIRED
Erection of 7 m / 8m poles including excavation, fixing of MUFF, concreting, curing, Backfilling, Reinstatement, Compaction of earth, Stay arrangements etc. and sign writing on poles with paint
Slinging / Laying of ADSS / AOF including fixing of installation accessories and fixtures etc. splicing & jointing of OF cable, Link Testing & Acceptance Testing and makeover of route with As Built Diagram (ABD) of installed cost towards collection of ADSS Cable / AOF Cable from BSNL’s Store Depot.
Construction of Joint Chamber as per EI supply & fixing of G.I. Pipe & PLB pipe for bringing down the of cable, supply of stone slab for covering the chamber and sand for filling the chamber
Installation of FDF and WSC/FTB, leading-in arrangement, jointing of pigtails and other related activity for construction of ADSS/Aerial OFC routes
DEVESH CONSTRUCTIONS (BID ID -743998)
ASHOK KUMAR GARG CONTRACTOR (BID ID -742693)
Cee Kay EPC Projects Pvt Ltd (BID ID -743006)
ALHADIN CONSTRUCTION (BID ID -743766)
Kashmir Singh (BID ID -744061)
Cee Kay EPC Projects Pvt Ltd (BID ID -743006)
ASHOK KUMAR GARG CONTRACTOR (BID ID -742693)
ALHADIN CONSTRUCTION (BID ID -743766)
Bidder Name
SKYLARK TELECOM SERVICES PVT LTD
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .