Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹19,000
Closing Date
18 May 2021, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Ex Engineer
Mechanical Irrigation div Ang HQ Awantipora
Repairs to 60 HP 980 RPM 3 phase motor for drought pumping unit and 200 HP starter for VT unit No 1 at LIS Hatiwara
2021_IFC_124142_9
08/MIDA of 2021-22
Open Tender
Electrical and Maintenance Works
Item Rate
7 days
Hatiwara
Repairs to 60 HP 980 RPM 3 phase motor for drought pumping unit and 200 HP starter for VT unit No 1 at LIS Hatiwara
2 documents required · 2 mandatory
₹50
Ex eng nMechanical Irrigation div Ang HQ Awantipor
19 May 2021
11 May 2021
19 May 2021
11 May 2021
18 May 2021
11 May 2021
180 days
Amount
Disconnecting of 60 HP 980 RPM 3 phase HZ motor from electric supply at LIS Hatiwara . The job involves disassembling the motor from the base frame after removal of all nuts bolts and washers . the job comprises of handling carriage upto the loading site loading and carriage of the motor from the loading site to workshop . dismantalling of the motor and removing of damaged bearings of motor , cleaning of bearing housing removing of dirt dust and greasy substance . Providing and fitting of new bearing (SKF) as per sample . Filling of fresh wheel bearing grease upto required recommended levels. The job includes shifting the motor from workshop to site and involves private carriage and all tools and tackles for installing the motor back on the base frame and reconnecting it to the main power supply . The job also involves replacing damaged nuts bolts and washers . The pump motor is to be tested on full load AFTER CONDUCTING ALL ABOVE REPAIRS MODIFICATIONS AND REPLACEMENTS
Repairs to 200 HP auto transformer starter . The job comprises of complete disconnecting of kit/point sets, replacement of damaged/burnt coper contact points sets both moving and fixed as per sample. . removal of accumulated carbon rom the contact holding desk by applying carbon from the active chemical making the surface smooth Adjustment of the lever mechanism replacing damaged copper terminals and providing and fitting of suitable copper terminals 6 numbers crimping of terminal ends and the joints with Teflon coated tape. After conducting all above repairs the starter shall be tested on full load at site .
M/S G N ELECTRICAL AND MECHANICAL WORKS
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .