| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.2 LAdmitted-Finance NA | PALWAL | HARYANA | 121004 | -0.50% | ₹4.2 L | L1 | Admitted-Finance |
| 2 | L2₹4.3 L+₹11,431.25 (2.73%)Admitted-Finance | +2.22% | ₹4.3 L+₹11,431.25 (2.73%) | L2 | Admitted-Finance |
| 3 | L3₹4.4 L+₹23,997.22 (5.74%)Admitted-Finance 1 JOYRAMPUR JALA ROAD MAIL 42C SARADAMA UPANIBESH BEHALA KOLKATA 700060 | KOLKATA | WEST BENGAL | 700060 | +5.21% | ₹4.4 L+₹23,997.22 (5.74%) | L3 | Admitted-Finance |
| 4 | Rejected-Technical | - | - | - | Rejected-Technical Rejected |
Tender Value
₹4.2 L
EMD Value
₹8,410
Closing Date
16 Mar 2026, 2:00 pmClosed
EXECUTIVE ENGINEEER BR-XIII AND XIV
THE KOLKATA MUNICIPAL CORPORATION OFFICE OF THE EXECUTIVE ENGINEEER WATER SUPPLY DEPARTMENT 516, D.H. ROAD KOLKATA-700034
LAYING 150 MM. DIA. D.I. PIPE AT M.G.ROAD BYE LANE NEAR H/NO-90,67,60,27,CHARULATA APARTMENT,114 JUDGE BAGAN ETC. IN W-115,BR-XIII
2026_KMC_1017173_1
KMC/WS/EE/SSU/W- 115/20/25-26/R2/241
Open Tender
CIVIL AND ELECTRICAL WORKS
Percentage
21 days
KOLKATA
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹8,410
14 Jul 2026
2 Mar 2026
18 Mar 2026
2 Mar 2026
16 Mar 2026
2 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | CHAPTER - I [ SUPPLEMENTARY ] EXCAVATION, SHORING, BAMBOO PILING, FENCING & SIGN BOARD, LIGHTING & SIGNALING AND SITE CLEANING ETC. 1.4 Excavation of trial pit (3.0 m x 1.0 m x (upto) 3.0 m) for fixing of pumping main, washout line raking every detection against damage of S.W. pipe line electrical cable etc. as underground obstruction including 37.5 mm timber shuttering, earth cutting, dewatering, barricading and back filling etc. as per directionj of E-I-C | 6 | EACH | 1,867 | ₹11,202 |
| 2 | CHAPTER - I [ SUPPLEMENTARY ] EXCAVATION, SHORING, BAMBOO PILING, FENCING & SIGN BOARD, LIGHTING & SIGNALING AND SITE CLEANING ETC. 1.5 Cutting & picking up existing metalled black top portion of road surface to an average depth of 300 mm by using Jack hammer with all necessary tool and plant including reening the serviceable materials & stacking within a lead of 75 mtr. all complete as per direction of the Engineer-in- Charge. | 23.63 | CUBIC METER | 636 | ₹15,025.5 |
| 3 | CHAPTER - I [ SUPPLEMENTARY ] EXCAVATION, SHORING, BAMBOO PILING, FENCING & SIGN BOARD, LIGHTING & SIGNALING AND SITE CLEANING ETC. 1.1 Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm. | 248.2 | CUBIC METER PERCENT | 119.27 | ₹29,602.81 |
| 4 | CHAPTER - I [ SUPPLEMENTARY ] EXCAVATION, SHORING, BAMBOO PILING, FENCING & SIGN BOARD, LIGHTING & SIGNALING AND SITE CLEANING ETC. 1.8 Hire and labour charges for 75 mm dia bamboo railing on Jhau/Eucalyptusor other approved timber\bamboo posts 1.4 m above G.L and 0.60 m below G.L including tying strongly with coir ropes and boring holes for posts in any soil/ concrete surface/Bituminious surface packing the sides etc including cost of carriage of all materials and labour complete including cost of restoration to the damages of the ground to its original condition as per direction of Engineer in charge after removing the barricade.(Cost of restoration would be paid seperately. a) 75mm. dia bamboo railing & 125mm. Dia Jhau/Eucalyptus/other approved timber posts @ 1.60m apart (ii) Railing with 3 rows. | 779 | METER | 49 | ₹38,171 |
| 5 | CHAPTER - VIII SUPPLYING OF MATERIALS 8.25 Carriage of CI / Dl / ERWMS / AC pipes including loading into truck at the lifting point, unloading at destination and stacking properly in godown or yard etc. as directed (Including carriage by head load upto 30 metres at each of the two points. The rate covers all the above operations, actual transport all complete.diameter in mm 100 upto 5km | 11 | METER% | 2.61 | ₹28.71 |
| 6 | CHAPTER - VIII SUPPLYING OF MATERIALS 8.25 Carriage of CI / Dl / ERWMS / AC pipes including loading into truck at the lifting point, unloading at destination and stacking properly in godown or yard etc. as directed (Including carriage by head load upto 30 metres at each of the two points. The rate covers all the above operations, actual transport all complete.diameter in mm 100 per km beyond 5km to 10km | 11 | METER% | 0.95 | ₹10.45 |
| 7 | CHAPTER - VIII SUPPLYING OF MATERIALS 8.25 Carriage of CI / Dl / ERWMS / AC pipes including loading into truck at the lifting point, unloading at destination and stacking properly in godown or yard etc. as directed (Including carriage by head load upto 30 metres at each of the two points. The rate covers all the above operations, actual transport all complete.diameter in mm 100 per km beyond 10km to 20km | 11 | METER% | 1.6 | ₹17.6 |
| 8 | CHAPTER - VIII SUPPLYING OF MATERIALS 8.25 Carriage of CI / Dl / ERWMS / AC pipes including loading into truck at the lifting point, unloading at destination and stacking properly in godown or yard etc. as directed (Including carriage by head load upto 30 metres at each of the two points. The rate covers all the above operations, actual transport all complete.diameter in mm 100 per km beyond 20km | 11 | METER% | 3.9 | ₹42.9 |
| 9 | CHAPTER - VIII SUPPLYING OF MATERIALS 8.25 Carriage of CI / Dl / ERWMS / AC pipes including loading into truck at the lifting point, unloading at destination and stacking properly in godown or yard etc. as directed (Including carriage by head load upto 30 metres at each of the two points. The rate covers all the above operations, actual transport all complete.diameter in mm 125 carriage....carriage....diameter in mm 150 upto 5km | 346.5 | METER% | 4.35 | ₹1,507.27 |
| 10 | CHAPTER - VIII SUPPLYING OF MATERIALS 8.25 Carriage of CI / Dl / ERWMS / AC pipes including loading into truck at the lifting point, unloading at destination and stacking properly in godown or yard etc. as directed (Including carriage by head load upto 30 metres at each of the two points. The rate covers all the above operations, actual transport all complete.diameter in mm 125 carriage....carriage....diameter in mm 150 per km beyond 5km to 10km | 346.5 | METER% | 1.6 | ₹554.4 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.61 MB
TECHNICAL_BID_115_20_R2_241.pdf
Tender Documents • 1.25 MB
BOQ_2499383.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .