Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹6.3 LAdmitted-Finance | -22.51% | ₹6.3 L | L1 | Admitted-Finance |
| 2 | L2₹6.9 L+₹61,013.25 (9.68%)Admitted-Finance | -15.01% | ₹6.9 L+₹61,013.25 (9.68%) | L2 | Admitted-Finance |
Tender Value
₹8.1 L
EMD Value
₹16,260
Closing Date
14 Aug 2026, 12:00 pmClosed
Commissioner
Municipal Council Deeg
CC road construction from Pinkesh plot to Mukesh Parashar house, Vrinda Vihar Colony, Ward No. 14
2026_DLB_585895_8
Enit 12 Nirman 2026-27
Open Tender
Civil Works
Percentage
15 days
deeg
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
commissioner
₹16,260
Yes
18 Aug 2026
11 Aug 2026
14 Aug 2026
11 Aug 2026
14 Aug 2026
11 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of embankment with approved material obtained from borrow pit with all lifts and leads, transporting to site, spreading,grading to required slope and compacting by vibratory roller 8-10 tonne to meet requirement of table 300-2 including cost of compensation for earth taken from private land complete as per MoRT&H specification clause 305. (Lead taken upto 5 km) | - | CUM | 184.5 | - |
| 2 | Providing, laying, spreading and compacting of granular sub-base byproviding close graded Material, mixing in a mechanical mix plant atOMC, carriage of mixed Material to work site, spreading in uniformlayers with motor grader on prepared surface and compacting withvibratory power roller to achieve the desired density, complete asper MoRT&H specification clause - 401 including all material, labour, machinery, lighting, guarding and maintenance of diversion.Grading - III Material | - | CUM | 1,360 | - |
| 3 | Providing and laying rolled cement concrete mix of M-10 base course with coarse and fine aggregate conforming to IS:383, the size of coarse aggregate not exceeding 25 mm with minimum aggregate cement ratio 15:1 and minimum cement content of 200 kg/cum, aggregate gradation to be as per table 600-4 after blending, mixing in batching plant at optimum moisture content, transporting to site, laying with a paver with electronic sensor, compacting with 8-10 tonnes smooth wheeled vibratory roller to achieve the designed flexural strength, finishing and curing complete as per clause 603,112 of MoRT&H specification including allmaterial labour,machinery, lighting, guarding and maintenance of diversion. | - | CUM | 3,420 | - |
| 4 | Centring and shuttering with plywood or steel sheet upto two stories ( each story of height upto 3.5 metre from floor level) including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete. | - | CUM | 236.5 | - |
| 5 | Providing and laying un-reinforced, plain cement concrete mix with Concrete Mixer & vibrator pavement over a prepared sub base with43 grade cement , coarse and fine aggregate conforming to IS: 383, maximum size of coarse aggregate not exceeding 25 mm, mixed asper approved mix design, laid, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints etc including all material, labour,machinery, lighting, guarding and maintenance of diversion.PCC M-20 | - | CUM | 5,790 | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.71 MB
BOQ_1040984.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .