| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹35.1 LAccepted-AOC | L1 | Accepted-AOC Lowest bidder | |
| 2 | L2₹35.8 L+₹70,760 (2.01%)Rejected-Finance H NO 1566 2 SECTOR 30 B CHANDIGARH | NA | NA | 160001 | L2 | Rejected-Finance Other than lowest bidder | |
| 3 | L3₹37.3 L+₹2.2 L (6.25%)Rejected-Finance | L3 | Rejected-Finance Other than lowest bidder | |
| 4 | L4₹43.3 L+₹8.1 L (23.2%)Rejected-Finance FLAT NO 203 GH 5 SECTOR 27 PANCHKULA 134116 HRY | PANCHKULA | HARYANA | 134116 | L4 | Rejected-Finance Other than lowest bidder | |
| 5 | L5₹43.8 L+₹8.6 L (24.6%)Rejected-Finance | L5 | Rejected-Finance Other than lowest bidder |
| Sl No | Description | Qty | Unit | MOHAMMAD RASHID L2 | Airen Builders L3 | B N FRIENDS AND CO L4 | MS FUTEC ENGINEERS L5 | Supreet Associates L1 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Demolition of lime concrete / lean concrete /Brick bats etc. from sunken slab portion exc. 15 cm thick but above ground floors, complete all as specified and directed by Engineer-in-charge including removal of demolished material from MD land, debris away from site to a designated point by local administration or a distance up to 1.5 km from site complete all as specified and directed by Engr-in-charge. | 24.62 | Cubic Metre | 400 ₹9,848 | 400 ₹9,848 | 400 ₹9,848 | 400 ₹9,848 | 250 ₹6,155 Lowest |
| 2.00 | M & L for 25 mm thick cement concrete (1:2:4) type B-0 using 12.5 mm graded crushed stone aggregates as in flooring laid in slope complete all as specified and directed by Engineer-in-charge. | 49.5 | Square Metre | 200 ₹9,900 | 500 ₹24,750 | 150 ₹7,425 | 150 ₹7,425 | 120 ₹5,940 Lowest |
| 3.00 | M&L lean concrete type E-2 (1:5:10) using using 40mm brick aggregate as in sunken portion complete all as specified and directed by Engineer-in-charge. | 24.62 | Cubic Metre | 2,000 ₹49,240 | 3,400 ₹83,708 | 800 ₹19,696 Lowest | 1,500 ₹36,930 | 1,500 ₹36,930 |
| 4.00 | M&L for 40mm GI medium grade Spout pipe for sunken work complete all as specified. | 19.5 | Running Metre | 300 ₹5,850 Lowest | 450 ₹8,775 | 300 ₹5,850 Lowest | 400 ₹7,800 | 500 ₹9,750 |
| 5.00 | M&L for providing water proofing treatment of sunken portion of WCs, bathroom etc. by applying cement slurry mixed with Acrylic based polymer modified cementitious composite compound coating of make as approval in Technical Instruction 5/2003 by adding :- (a) 15mm thick plaster (1:4) cement sand mortar with integral water proofing compound 2% by weight of cement on floor and wall / beam, finishing the surface even and smooth without using extra cement. The surface shall then be cured and allowed to dry. (Note : Water proofing compound shall be measured and paid separately). (b) First layer of slurry of cement @0.5 kg/sqm mixed with Acrylic based polymer modified cementitious composite compound @ 0.25 kg/sqm. This layer will be allowed to air cure for 4 hrs. (c) Second layer of slurry of cement @0.25 kg/sqm mixed with Acrylic based polymer modified cementitious composite compound @ 0.15 kg/sqm. This layer will be allowed to air cure for 4 hrs followed with water curing for 48 hrs. complete all as specified and directed by Engineer-in-charge.
NOTE : Floor area of the sunken slab shall be measured only.
Make of Acrylic based polymer modified cementitious compound :-
Fosroc (Brushbond) /Sika (Sikatop-100) | 49.5 | Square Metre | 450 ₹22,275 Lowest | 650 ₹32,175 | 500 ₹24,750 | 1,200 ₹59,400 | 600 ₹29,700 |
| 6.00 | Supply only water proofing compound ISI marked complete all as specified and directed by Engr-in-Charge. | 12.3 | Kilogram | 100 ₹1,230 | 100 ₹1,230 | 100 ₹1,230 | 60 ₹738 Lowest | 60 ₹738 Lowest |
| 7.00 | S&F in repair 100 mm cast iron soil waste and vent pipe in any length with or without ears jointed with cement mortar (1:3) fixed to wall , laid in trenches or in floors, complete all as specified and directed by Engr-in-charge. | 95 | Running Metre | 1,100 ₹1,04,500 | 880 ₹83,600 Lowest | 900 ₹85,500 | 900 ₹85,500 | 1,200 ₹1,14,000 |
| 8.00 | All as per item No. 7 here-in-before but 75 mm dia | 88 | Running Metre | 900 ₹79,200 | 750 ₹66,000 Lowest | 800 ₹70,400 | 850 ₹74,800 | 1,100 ₹96,800 |
| 9.00 | Fixing only in repair 100 mm cast iron soil waste and vent pipe in any length with or without ears jointed with cement mortar (1:3) fixed to wall , laid in trenches or in floors, after necessary cleaning complete all as specified and directed by Engr-in-charge. | 38 | Running Metre | 200 ₹7,600 | 500 ₹19,000 | 500 ₹19,000 | 500 ₹19,000 | 100 ₹3,800 Lowest |
| 10.00 | Fixing only in repair 75 mm cast iron soil waste and vent pipe in any length with or without ears jointed with cement mortar (1:3) fixed to wall , laid in trenches or in floors, after necessary cleaning complete all as specified and directed by Engr-in-charge. | 42 | Running Metre | 200 ₹8,400 | 450 ₹18,900 | 300 ₹12,600 | 450 ₹18,900 | 100 ₹4,200 Lowest |
Tender Value
₹45.0 L
EMD Value
₹89,980
Closing Date
4 Jun 2026, 6:55 pmClosed
GE (AF) MC CHANDIGARH
GE (AF) MC CHANDIGARH
REPAIR TO SUNKEN OF BATH/WCs, PLUMBING, SANITARY FITTINGS, CLEANING OF SERVICE TANKS ETC IN CERTAIN OMQs/ SMQs AT SECTOR 31 AT 3BRD UNDER GE (AF) MC CHANDIGARH
2026_MES_765400_1
GE (AF) MC/CHD/T-20/2026-27
Open Tender
Civil Works
Item Rate
180 days
CHANDIGARH
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
GE (AF) MC CHANDIGARH
₹89,980
Yes
11 Jul 2026
14 May 2026
6 Jun 2026
14 May 2026
4 Jun 2026
28 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolition of lime concrete / lean concrete /Brick bats etc. from sunken slab portion exc. 15 cm thick but above ground floors, complete all as specified and directed by Engineer-in-charge including removal of demolished material from MD land, debris away from site to a designated point by local administration or a distance up to 1.5 km from site complete all as specified and directed by Engr-in-charge. | 24.62 | Cubic Metre | 1 | ₹24.62 |
| 2 | M & L for 25 mm thick cement concrete (1:2:4) type B-0 using 12.5 mm graded crushed stone aggregates as in flooring laid in slope complete all as specified and directed by Engineer-in-charge. | 49.5 | Square Metre | 1 | ₹49.5 |
| 3 | M&L lean concrete type E-2 (1:5:10) using using 40mm brick aggregate as in sunken portion complete all as specified and directed by Engineer-in-charge. | 24.62 | Cubic Metre | 1 | ₹24.62 |
| 4 | M&L for 40mm GI medium grade Spout pipe for sunken work complete all as specified. | 19.5 | Running Metre | 1 | ₹19.5 |
| 5 | M&L for providing water proofing treatment of sunken portion of WCs, bathroom etc. by applying cement slurry mixed with Acrylic based polymer modified cementitious composite compound coating of make as approval in Technical Instruction 5/2003 by adding :- (a) 15mm thick plaster (1:4) cement sand mortar with integral water proofing compound 2% by weight of cement on floor and wall / beam, finishing the surface even and smooth without using extra cement. The surface shall then be cured and allowed to dry. (Note : Water proofing compound shall be measured and paid separately). (b) First layer of slurry of cement @0.5 kg/sqm mixed with Acrylic based polymer modified cementitious composite compound @ 0.25 kg/sqm. This layer will be allowed to air cure for 4 hrs. (c) Second layer of slurry of cement @0.25 kg/sqm mixed with Acrylic based polymer modified cementitious composite compound @ 0.15 kg/sqm. This layer will be allowed to air cure for 4 hrs followed with water curing for 48 hrs. complete all as specified and directed by Engineer-in-charge.
NOTE : Floor area of the sunken slab shall be measured only.
Make of Acrylic based polymer modified cementitious compound :-
Fosroc (Brushbond) /Sika (Sikatop-100) | 49.5 | Square Metre | 1 | ₹49.5 |
| 6 | Supply only water proofing compound ISI marked complete all as specified and directed by Engr-in-Charge. | 12.3 | Kilogram | 1 | ₹12.3 |
| 7 | S&F in repair 100 mm cast iron soil waste and vent pipe in any length with or without ears jointed with cement mortar (1:3) fixed to wall , laid in trenches or in floors, complete all as specified and directed by Engr-in-charge. | 95 | Running Metre | 1 | ₹95 |
| 8 | All as per item No. 7 here-in-before but 75 mm dia | 88 | Running Metre | 1 | ₹88 |
| 9 | Fixing only in repair 100 mm cast iron soil waste and vent pipe in any length with or without ears jointed with cement mortar (1:3) fixed to wall , laid in trenches or in floors, after necessary cleaning complete all as specified and directed by Engr-in-charge. | 38 | Running Metre | 1 | ₹38 |
| 10 | Fixing only in repair 75 mm cast iron soil waste and vent pipe in any length with or without ears jointed with cement mortar (1:3) fixed to wall , laid in trenches or in floors, after necessary cleaning complete all as specified and directed by Engr-in-charge. | 42 | Running Metre | 1 | ₹42 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.46 MB
TenderDocument20.pdf
Tender Documents • 1.41 MB
BOQ_857234.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .