Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.7 LAccepted-Finance STAKMO | ₹6.7 L | L1 | Accepted-Finance Found lowest rate |
| 2 | L2₹7.0 LAccepted-Finance PHYANG LEH | LEH LADAKH | LADAKH | 194101 | ₹7.0 L | L2 | Accepted-Finance Quoted high rate |
| 3 | L3₹7.2 LAccepted-Finance | ₹7.2 L | L3 | Accepted-Finance Quoted high rate |
| 4 | L4₹7.2 LAccepted-Finance STAKMO | ₹7.2 L | L4 | Accepted-Finance Quoted high rate |
| 5 | L5₹7.5 LAccepted-Finance | ₹7.5 L | L5 | Accepted-Finance Quoted high rate |
Tender Value
₹11.8 L
EMD Value
₹23,540
Closing Date
7 May 2026, 2:00 pmClosed
Executive Engineer REW Leh
REW Leh
Construction of Link Road from Medical to Chumik Phase 1 Stakna (Balance work)
2026_RDD_18845_2
09-UTL REW Leh of 2026-27
Open Tender
Civil Works - Others
30 days
Leh
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,000
Payable To Executive engineer REW Leh
₹23,540
18 May 2026
28 Apr 2026
9 May 2026
28 Apr 2026
7 May 2026
28 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. All kinds of soil | 49.53 | CUM | 208.42 | ₹10,323.04 | item 01 |
| 2 | Providing and fixing of dry stone solling in horizontal layer including cost of Stone complete job. | 45.36 | CUM | 953.03 | ₹43,229.44 | item 02 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level. 1:3:6 (1 cement: 3 coarse sand: 6 graded stone aggregate 20mm nominal size) (A) Crushed | 122.57 | CUM | 6,606.08 | ₹8,09,707.23 | item 03 |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns | 292.64 | SQM | 306.15 | ₹89,590.21 | item 04 |
| 5 | Providing and laying MS PIPE of 12" dia including loading, unloading , earthwork and carriage complete job . | 4 | NOS | 33,898.31 | ₹1,35,593.24 | item 05 |
| 6 | Steel work welded in built up sections/ framed work, including cutting,
hoisting, fixing in position and In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works | 150 | KG | 180.25 | ₹27,037.5 | item 06 |
| 7 | Carriage of cement & steel avg. Lead of 15 Km by MT | 26.97 | MTON | 291.72 | ₹7,867.69 | item 07 |
| 8 | Carriage of sand and C. aggregate avy. Lead of 15 Km by MT | 165.48 | CUM | 328.14 | ₹54,300.61 | item 08 |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.96 MB
BOQ_45003.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid