Superintending Engineer CEDC North
office of Superintending Engineer CEDC North
Labour Charges for Erection and dismantling of DT, Structure, Pillar, Heightening of pillar box, Laying of HT and LT cable towards improvement, extension , DCW works and allied works, in respect of Vyasarpadi Division of Chennai North EDC
2023_EB_334193_1
OT-16/2023-24
Open Tender
Electrical Works
Works
365 days
Vyasarpadi
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹25,000
Yes
25 Jul 2023
1 Jul 2023
7 Jul 2023
1 Jul 2023
6 Jul 2023
1 Jul 2023
1 Jul 2023 - 5 Jul 2023
Amount
LABOUR CHARGES FOR ERECTION OF DOUBLE POLE STRUCTURE WITH DISTRIBUTION TRANSFORMER.
Excavation of Structure Pole Pit 2' x 3' x 1/6 th of height of pole
Erection of 9.14 M RCC/9.0 Mtr PSC /RSJ pole
Loading and Unloading of 9.14 M RCC/9.0 Mtr PSC /RSJ pole
Transporting of 9.14 m poles from Road side to pole pit
Structure pole mass Concreting and coping 0.6x0.6x1.65 mtr for DP structure Including cost of materials and cement.
Erection of structure materials complete such as top channel, seating channel, belting angle, cross bracing. DPDC channel, T.I. Fitting etc., in complete.
Excavation of stay pit 0.95x0.60x1.5m
Erection of Stay Set Complete
Sleeve concrete for stay set including all materials & cement
Erection of HG fuse set with transport
Erection of 11 KV AB switch complete set with transport
Transformer structure grounding and earthing of structure complete including excavtion of earth pit and erection of earth pipe with salt, coal and earth refiling etc., complete with trough / w.o. trough
Erection of Aluminium bus bar pipe complete for H.T. Bus bar arrangements for DP Structure
Erection of Aluminium bus bar pipe complete for H.T. Bus bar arrangements for TP Structure
Erection of Aluminium bus bar pipe complete for H.T. Bus bar arrangements for Four Pole Structure
Erection of L.T. Open type fuse unit including cable jumpering upto the line.
Providing LT bus bar arrangements in DT structure including fixing of cross arm and insulator.
Erection of H.T. jumpering in DP structure complete (150 * 3)
Erection of H.T. LAS (3 Nos)
Erection of L.T. LAS (4 Nos)
Erection of DT excluing loading and unloading using Crane - 63KVA/100KVA
Erection of DT excluing loading and unloading using Crane - Above 100 KVA
Painting of two coats of Aluminium paint for DP structure and iron materials including cost of paint and distemper etc. Without Material
Painting of two coats of Aluminium paint for DP structure and iron materials including cost of paint and distemper etc. - With Material
Painting of Structure pole with Distemper including cost of material
Loading and unloading of Distribution Transformer at site and store. (All Rating)
Dismantling of failed DT from the structure including removing HT & LT connection and all other incidental works. (excluding loading and unloading) - Upto 100 KVA
Dismantling of failed DT from the structure including removing HT & LT connection and all other incidental works. (excluding loading and unloading) - Above 100 KVA
Dismantling of 9.14 Mtr. Poles/RSJ/Tubular Poles
Dismantling of Stay set complete
LABOUR CHARGES FOR LAYING OF HT CABLE
Excavation of cable trench 0.6 meters width and 1.2 meters depth including cost of providing sign boards, danger lights, indication arrangements lead, lift, labour and tools and plants etc., - Normal Road
Excavation of cable trench 0.6 meters width and 1.2 meters depth including cost of providing sign boards, danger lights, indication arrangements lead, lift, labour and tools and plants etc., - Tar Road
Excavation of cable trench 0.6 meters width and 1.2 meters depth including cost of providing sign boards, danger lights, indication arrangements lead, lift, labour and tools and plants etc.,-Concrete Road
Loading and unloading of HT Cable including coiling and recoiling
Transporting of 11 KV HT cable from departmental stores to work spot by engaging private vehicle upto 5 Km
Transporting of 11 KV HT cable from departmental stores to work spot by engaging private vehicle above 5 Km
Laying of 11KV 3 X 300 sq mm XLPE cable
Laying of 11KV 3 X 120 sq mm XLPE cable
Covering HT cable by cement "V" trough after covering the cable with good loose earth including loading, unloading and transport from stores to site and letter painting of feeding details & Cable size on the trough
Refilling with excavated earth layers well consolidated as per std specification including all materials, lead, lift etc., complete.
Transport back any balance cable, empty drums and other materials if any by engaging private vehicle including recoiling, coiling and loading and unloading at both sides from workspot to departmental stores (minimum 2 drums) upto 5 Km
Transport back any balance cable, empty drums and other materials if any by engaging private vehicle including recoiling, coiling and loading and unloading at both sides from workspot to departmental stores (minimum 2 drums) above 5 Km
LABOUR CHARGES FOR LAYING OF LT CABLE
Loading and unloading of LT Cable including coiling and recoiling
Transporting of 11 KV LT cable from departmental stores to work spot by engaging private vehicle upto 5 Km
Transporting of 11 KV LT cable from departmental stores to work spot by engaging private vehicle above 5 Km
Excavation of cable trench size 0.45m x0.75 m including cost of providing sign boards, danger lights, indication arrangements, lead, lift, labour and T&P etc. - Normal Road
Excavation of cable trench size 0.45m x0.75 m including cost of providing sign boards, danger lights, indication arrangements, lead, lift, labour and T&P etc. -Tar Road
Excavation of cable trench size 0.45m x0.75 m including cost of providing sign boards, danger lights, indication arrangements, lead, lift, labour and T&P etc. -Concrete Road
Laying of LT 4 x 240 sq.mm cable
Laying of LT 4 X 120 sq.mm cable
Laying of LT 4 X 25 sq.mm cable
Laying of LT 2 X 16 sq.mm cable
Refilling with excavated earth layers as per std specification including all materials, lead, lift etc., complete.
LABOUR CHARGES FOR ERECTION OF PILLAR BOX
Erection of 4 / 6 Way pillar box - 3 Feet Height using concrete only - including excavation of foundation pits as per standard specification 2 Nos pillar concrete walls, coping and earthing including cost of all materials, el. works, transportation, lead, lift etc.,
Erection of Mini pillar box - 3 Feet Height using concrete only - including excavation of foundation pits as per standard specification 2 Nos pillar concrete walls, coping and earthing including cost of all materials, el. works, transportation, lead, lift etc.,
Raising of 4 / 6 Way Pillar Box
Raising of Mini Pillar Box
Welding, Painting and Earthing of 4 /6 Way Pillar Box
Removing and refixing of LT cables in 4 /6 Way Pillar boxes
Cleaning, painting with Aluminium paint 2 coats & Numbering pillar box with feeder details. (Estimate sanction mandatory) including cost of all materials - 4 / 6 Way Pillar Box
Cleaning, painting with Aluminium paint 2 coats & Numbering pillar box with feeder details. (Estimate sanction mandatory) including cost of all materials - Mini Pillar Box
LABOUR CHARGES FOR DISMANTLING OF PILLAR BOX
Dismantling of old 4 / 6 / 8 Way pillar box including associated accessories, loading on the vehicle, transporting, unloading at stores and stacking.
Dismantling of old Mini pillar box including associated accessories, loading on the vehicle, transporting, unloading at stores and stacking.
LABOUR CHARGES FOR MISCELLANEOUS WORK
Erection of cross bracing set 10' / 15' Structure - DP Structure
Erection of cross bracing set 10' / 15' Structure - TP Structure
Erection of Top Channels 10' / 15' Structure - DP Structure
Erection of Top Channels 10' / 15' Structure - TP Structure
Erection of 33 KV centre rotating AB switch complete set
Erection of 11 KV centre rotating AB switch complete set
Loading of Metering Set
Un loading of Metering Set
Erection of Metering Sets - Up to 11KV metering set
Erection of Metering Sets - Above 11KV metering set
Manufacturing of MS clamps at works spot as per requirement , including alteration by using 50 x 8 mm Flat (with material)
Manufacturing of MS clamps at works spot as per requirement , including alteration by using 65 x 10 mm Flat (with material)
Cutting of Channel/Flat/Angle
Cutting of RSJ pole
Drilling of 5/8", 3/8", 1/" Holes in Channels / Angles - Slot Holes
Drilling of 5/8", 3/8", 1/" Holes in Channels / Angles - Round Holes
Fixing of Missing doors in MS Mini Pillar Box
Fixing of Missing doors in MS 4 Way Pillar Box
Fixing of Missing doors in MS 6 Way Pillar Box
Fixing of Missing doors in MS 8 Way Pillar Box
Fixing of Missing doors in FRP Pillar Box
Provision of 2 Nos Hinges in all types of Pillar Box
LABOUR CHARGES FOR ERECTION OF SINGLE POLE STRUCTURE
Loading and Unloading of 9.0m Square Pole
Excavation of Pole Pit
Erection of 9.0m Square Pole
Transporting of Square Pole from Road Side to Pole Pit
Excavation of stay pit 0.95x0.60x1.5m
Erection of Stay Set Complete
Fixing of Single Pole Structure Material in complete shape
Erection of 16 / 25 / 40 KVA Distribution Transformer
Transformer structure grounding and earthing of structure complete including excavtion of earth pit and erection of earth pipe with salt, coal and earth refiling etc., complete with trough / w.o. trough
Structure pole mass Concreting and coping 0.6x0.6x1.65 mtr for DP structure Including cost of materials and cement.
Sleeve concrete for stay set including all materials
Erection of HT LAS (3 Nos)
Erection of LT LAS (4 Nos)
Erection of LT Wiring Kit (Double Open Type Circuit)
Painting of single pole structure including iron materials double coat with materials
Painting of single pole structure including iron materials double coat without materials
Painting of Structure pole with Distemper including cost of material
Laying of HT Cable through Trenchless Technology
Laying of HT UG cable using Trenchless Method with Pipes(0-100m)
Laying of HT UG cable using Trenchless Method with Pipes(101-200m)
Laying of HT UG cable using Trenchless Method with Pipes(above 200m)
Laying of HT UG cable using Trenchless Method without Pipes(0-100m)
Laying of HT UG cable using Trenchless Method without Pipes(101-200m)
Laying of HT UG cable using Trenchless Method without Pipes(above 200m)
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .