EXECUTIVE ENGINEER REW BUDGAM
RDD Complex Budgam
CONSTRUCTION OF TWO NUMBER CULVERT WITH STAIR STEPS NEAR PUBLIC PARK AT CHEWDARA B PHASE II.
2026_RDPR_304141_14
NIT_129_REW_Budgam
Open Tender
Civil Works
Percentage
30 days
Rathsun
Please refer Tender documents.
3 documents required · 3 mandatory
₹200
Executive Engineer REW Budgam
₹11,700
28 Feb 2026
21 Feb 2026
28 Feb 2026
21 Feb 2026
27 Feb 2026
21 Feb 2026
Select, At Par, Excess (+), Less (-) IOCL
Tender Inviting Authority: Rural Engineering wing Budgam
Name of work :construction of two number culvert with stair Steps near Public park at Chewdara B Phase II
Contract No: of 2025-26 DATED: -02-2026 Adv cost =Rs 2.34 Lacs
Name of the Bidder/ Bidding Firm / Company :
Sl. No. Item Description Item Code / Make Quantity Units Estimated Rate in Rs. P Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category
0_) engagement of labours for cleance of site removing vegetation and disposal of same as directed by enginner in charge BI01010001010000000000000515BI0100001122 lb _(* #,##0.00_);_(* \(#,##0.00\);_(* "-"??_);_(@_) Excess(+) Full Conversion INR
0_) Earth work in excavation by mechnical means /mechanical in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 mt in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides andramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:all kinds of soil BI01010001010000000000000515BI0100001123 CUM _(* #,##0.00_);_(* \(#,##0.00\);_(* "-"??_);_(@_) Excess(+) Full Conversion INR
0_) Providing/Laying Stone soling Nallah hand packed on level in foundation trenches/Roomes excluding carriages of Stones.(Under foundation trench & Floors)avg H/L of 100 Mtr. BI01010001010000000000000515BI0100001124 CUM Excess(+) Full Conversion INR
0_) Providing and laying in position cement concrete of specified grade 1:4:8 MIX including curing but excluding the cost of centring and shuttering. All work upto plinth level. BI01010001010000000000000515BI0100001125 CUM _(* #,##0.99_);_(* \(#,##0.99\);_(* "-"??_);_(@_) Excess(+) Full Conversion INR
0_) Providing and laying in position cement concrete of specified grade 1:3:6 MIX including curing but excluding the cost of centring and shuttering. All work upto plinth level. BI01010001010000000000000515BI0100001126 CUM _(* #,##0.00_);_(* \(#,##0.00\);_(* "-"??_);_(@_) Excess(+) Full Conversion INR
0_) P/L of reinforced cement concrete in 1:2:4 Mix BI01010001010000000000000515BI0100001127 cum _(* #,##0.99_);_(* \(#,##0.99\);_(* "-"??_);_(@_) Excess(+) Full Conversion INR
0_) steel Work reinforced for RCC work BI01010001010000000000000515BI0100001128 kg _(* #,##0.00_);_(* \(#,##0.00\);_(* "-"??_);_(@_) Excess(+) Full Conversion INR
0_) Centering and shuttering including strutting, propping etc. and removal of form for Retaining walls, return walls, walls (any thickness) including attached pilastersbuttresses, plinth and string course fillets, kerbs and steps etc. BI01010001010000000000000515BI0100001129 SQM _(* #,##0.00_);_(* \(#,##0.00\);_(* "-"??_);_(@_) Excess(+) Full Conversion INR
0_) Centering and shuttering including strutting, propping etc. and removal of form for Retaining walls, return walls, walls (any thickness) including attached pilastersbuttresses, plinth and string course fillets, kerbs and steps etc. BI01010001010000000000000515BI0100001130 SQM _(* #,##0.00_);_(* \(#,##0.00\);_(* "-"??_);_(@_) Excess(+) Full Conversion INR
0_) Carriage of different material from nearst sources to site of work Stone soiling BI01010001010000000000000515BI0100001131 cum _(* #,##0.99_);_(* \(#,##0.99\);_(* "-"??_);_(@_) Excess(+) Full Conversion INR
0_) Stone aggregates avg 15 km BI01010001010000000000000515BI0100001132 CUM _(* #,##0.99_);_(* \(#,##0.99\);_(* "-"??_);_(@_) Excess(+) Full Conversion INR
0_) sand for an average lead of 15 km BI01010001010000000000000515BI0100001133 cum _(* #,##0.99_);_(* \(#,##0.99\);_(* "-"??_);_(@_) Excess(+) Full Conversion INR
0_) PROVISION FOR SIGN BOARD,WEEP HOLES OTHER ITEMS, ETC BI01010001010000000000000515BI0100001134 JOB _(* #,##0.00_);_(* \(#,##0.00\);_(* "-"??_);_(@_) Excess(+) Full Conversion INR
Total in Figures
Quoted Rate in Figures Select
Please Enable Macros to View BoQ information
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.44 MB
BOQ_987985.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .