Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.3 CrAccepted-AOC 305 CHAWANI CHOURAHA GORAKHPUR UTTAR PRADESH | ₹9.3 Cr | L1 | Accepted-AOC AOC |
| 2 | L2₹10.1 CrRejected-Finance | ₹10.1 Cr | L2 | Rejected-Finance R |
| 3 | L3₹12.4 CrRejected-Finance DEHRADUN | UTTARAKHAND | 248001 | ₹12.4 Cr | L3 | Rejected-Finance R |
| 4 | L4₹12.4 CrRejected-Finance GRAM BHIMAPAR TEHSIL NAUGARTH DISTRICT SIDDHARTHNAGAR | SIDDHARTH NAGAR | UTTAR PRADESH | 272152 | ₹12.4 Cr | L4 | Rejected-Finance R |
| 5 | L5₹12.4 CrRejected-Finance 0 | ₹12.4 Cr | L5 | Rejected-Finance R |
| Sl No | Description | Qty | Unit | M/S RAJ CONSTRUCTION L5 | M/s Vishal Construction L7 | M/S URMILA AND SONS CONSTRUCTION CO. L1 | M/S KESHRAM CONTRACTOR L3 | Kiyaan Enterprises L2 | OM PRAKASH CHAUBEY L4 | A K ENGINEERING WORKS L6 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Morth specification clause No. 2.03- 201 complete in all aspects or as per direction of E/I (Rates are Excluding GST but Including of all other taxes labour cess ,material ,labour and T&P etc) | 10,500 | Sqm | 16 ₹1.7 L | 18 ₹1.9 L | 3 ₹31,500 | 3 ₹31,500 | 18 ₹1.9 L | 16 ₹1.7 L | 18 ₹1.9 L |
| 2.00 | Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m as per Morth specification clause No.3.06-301 complete in all aspects or as per direction of E/I (Rates are Excluding GST but Including of all other taxes labour cess ,material ,labour and T&P etc) | 2,420 | Cum | 110 ₹2.7 L | 115 ₹2.8 L | 90 ₹2.2 L | 110 ₹2.7 L | 150 ₹3.6 L | 110 ₹2.7 L | 115 ₹2.8 L |
| 3.00 | Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreadingin 20 cm thickness, grading to required slope and compacted with Vibratory roller to meet requirment density not less than 97% of designed density as per J.M.F approved by competent authority relative compaction including and lift of table 300-2. as per Morth specification clause No.3.16-305 complete in all aspects or as per direction of E/I (Rates are Excluding GST but Including of all other taxes labour cess ,material ,labour and T&P etc) | 34,640 | Cum | 110 ₹38.1 L | 118 ₹40.9 L | 140 ₹48.5 L | 230 ₹79.7 L | 150 ₹52.0 L | 110 ₹38.1 L | 118 ₹40.9 L |
| 4.00 | Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading in 20cm thick layer , grading to required slope and compacted with Vibratory roller to meet requirment of density not less than 97% of designed density as per J.M.F approved by competent authority compaction including and lift of table 300-2. as per Morth specification clause No.3.16-305 Cartage earth not less than 2KM complete in all aspects or as per direction of E/I (Rates are Excluding GST but Including of all other taxes labour cess ,material ,labour and T&P etc) | 21,000 | Cum | 180 ₹37.8 L | 195 ₹41.0 L | 150 ₹31.5 L | 160 ₹33.6 L | 180 ₹37.8 L | 180 ₹37.8 L | 195 ₹41.0 L |
| 5.00 | Construction of embankment with approved materials deposited at site from roadway cutting spreading in 20cm thick layer and excavation from drain and foundation of other structures graded and compacted with Vibratory roller to meet requirment ofdensity not less than 97% of designed density as per J.M.F approved by competent authority compaction including and lift of table 300-2. as per Morth specification clause No.3.17-305 complete in all aspects or as per direction of E/I (Rates are Excluding GST but Including of all other taxes labour cess ,material ,labour and T&P etc) | 2,420 | Cum | 60 ₹1.5 L | 62 ₹1.5 L | 150 ₹3.6 L | 210 ₹5.1 L | 160 ₹3.9 L | 60 ₹1.5 L | 62 ₹1.5 L |
| 6.00 | Construction of granular sub-baseGrade I by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 with J.M.F.approved by competent authority as per Morth specification clause No.4.01-401 B complete in all aspects or as per direction of E/I (Rates are Excluding GST but Including of all other taxes labour cess ,material ,labour and T&P etc) | 2,347 | Cum | 4,800 ₹1.1 Cr | 4,850 ₹1.1 Cr | 3,000 ₹70.4 L | 3,800 ₹89.2 L | 4,100 ₹96.2 L | 4,800 ₹1.1 Cr | 4,200 ₹98.6 L |
| 7.00 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with grader in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.as per Morth specification clause No.4.14-406 B complete in all aspects or as per direction of E/I (Rates are Excluding GST but Including of all other taxes labour cess ,material ,labour and T&P etc) | 4,346 | Cum | 5,300 ₹2.3 Cr | 5,335 ₹2.3 Cr | 3,950 ₹1.7 Cr | 5,000 ₹2.2 Cr | 1,200 ₹52.2 L | 5,300 ₹2.3 Cr | 5,100 ₹2.2 Cr |
| 8.00 | Providing and applying primer coat with bitumen SS1 grade emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means as per Morth specification clause No.5.01-502 A complete in all aspects or as per direction of E/I (Rates are Excluding GST but Including of all other taxes labour cess ,material ,labour and T&P etc) | 20,760 | Sqm | 35 ₹7.3 L | 38 ₹7.9 L | 30 ₹6.2 L | 40 ₹8.3 L | 35 ₹7.3 L | 35 ₹7.3 L | 38 ₹7.9 L |
| 9.00 | Providing and laying dense graded bituminous macadam grade II with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder Bitumen VG 30 and thickness of 50 mm to 70mm @ 4.5 per cent by weight of total mix and filler transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction with J.M.F.approved by competent authority as per MoRTH specification clause No. 5.04 -505B complete in all respects. complete in all aspects or as per direction of E/I (Rates are Excluding GST but Including of all other taxes labour cess ,material ,labour and T&P etc) | 1,404 | Cum | 12,700 ₹1.8 Cr | 12,780 ₹1.8 Cr | 7,900 ₹1.1 Cr | 10,800 ₹1.5 Cr | 11,000 ₹1.5 Cr | 12,700 ₹1.8 Cr | 12,780 ₹1.8 Cr |
| 10.00 | Providing and applying tack coat with Bitumen VG 10 grade using bitumen pressure distributor at the rate of 0.20 kg per sqm on the prepared granular surfaces treated with primer & Cleaned with Hydraulic broom as per Morth specification clause No.5.02-503 complete in all aspects or as per direction of E/I (Rates are Excluding GST but Including of all other taxes labour cess ,material ,labour and T&P etc) | 20,760 | Sqm | 11 ₹2.3 L | 11 ₹2.3 L | 10 ₹2.1 L | 14 ₹2.9 L | 20 ₹4.2 L | 11 ₹2.3 L | 11 ₹2.3 L |
Tender Value
₹12.8 Cr
EMD Value
₹25.7 L
Closing Date
5 Feb 2026, 12:00 pmClosed
O/F SUPRINTENDING ENGINEER BASTI CIRCLE PWD BASTI
O/F SUPRINTENDING ENGINEER BASTI CIRCLE PWD BASTI
WIDENING AND STRENGTHENING OF USKA AJGRA DHARMSIGWA ROAD (ODR)
2026_CEUBZ_1109639_1
328/4E-NIVIDA-BASTI CIRCLE/25-26 DATED-17-01-2026
Open Tender
Civil Works
365 days
BASTI
AS PER SBD
2 documents required · 2 mandatory
₹6,255
Yes
₹25.7 L
O/F SUPRINTENDING ENGINEER BASTI CIRCLE PWD BASTI
31 Mar 2026
28 Jan 2026
5 Feb 2026
28 Jan 2026
5 Feb 2026
28 Jan 2026
28 Jan 2026 - 5 Feb 2026
31 Jan 2026
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Morth specification clause No. 2.03- 201 complete in all aspects or as per direction of E/I (Rates are Excluding GST but Including of all other taxes labour cess ,material ,labour and T&P etc)
Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m as per Morth specification clause No.3.06-301 complete in all aspects or as per direction of E/I (Rates are Excluding GST but Including of all other taxes labour cess ,material ,labour and T&P etc)
Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreadingin 20 cm thickness, grading to required slope and compacted with Vibratory roller to meet requirment density not less than 97% of designed density as per J.M.F approved by competent authority relative compaction including and lift of table 300-2. as per Morth specification clause No.3.16-305 complete in all aspects or as per direction of E/I (Rates are Excluding GST but Including of all other taxes labour cess ,material ,labour and T&P etc)
Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading in 20cm thick layer , grading to required slope and compacted with Vibratory roller to meet requirment of density not less than 97% of designed density as per J.M.F approved by competent authority compaction including and lift of table 300-2. as per Morth specification clause No.3.16-305 Cartage earth not less than 2KM complete in all aspects or as per direction of E/I (Rates are Excluding GST but Including of all other taxes labour cess ,material ,labour and T&P etc)
Construction of embankment with approved materials deposited at site from roadway cutting spreading in 20cm thick layer and excavation from drain and foundation of other structures graded and compacted with Vibratory roller to meet requirment ofdensity not less than 97% of designed density as per J.M.F approved by competent authority compaction including and lift of table 300-2. as per Morth specification clause No.3.17-305 complete in all aspects or as per direction of E/I (Rates are Excluding GST but Including of all other taxes labour cess ,material ,labour and T&P etc)
Construction of granular sub-baseGrade I by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 with J.M.F.approved by competent authority as per Morth specification clause No.4.01-401 B complete in all aspects or as per direction of E/I (Rates are Excluding GST but Including of all other taxes labour cess ,material ,labour and T&P etc)
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with grader in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.as per Morth specification clause No.4.14-406 B complete in all aspects or as per direction of E/I (Rates are Excluding GST but Including of all other taxes labour cess ,material ,labour and T&P etc)
Providing and applying primer coat with bitumen SS1 grade emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means as per Morth specification clause No.5.01-502 A complete in all aspects or as per direction of E/I (Rates are Excluding GST but Including of all other taxes labour cess ,material ,labour and T&P etc)
Providing and laying dense graded bituminous macadam grade II with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder Bitumen VG 30 and thickness of 50 mm to 70mm @ 4.5 per cent by weight of total mix and filler transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction with J.M.F.approved by competent authority as per MoRTH specification clause No. 5.04 -505B complete in all respects. complete in all aspects or as per direction of E/I (Rates are Excluding GST but Including of all other taxes labour cess ,material ,labour and T&P etc)
Providing and applying tack coat with Bitumen VG 10 grade using bitumen pressure distributor at the rate of 0.20 kg per sqm on the prepared granular surfaces treated with primer & Cleaned with Hydraulic broom as per Morth specification clause No.5.02-503 complete in all aspects or as per direction of E/I (Rates are Excluding GST but Including of all other taxes labour cess ,material ,labour and T&P etc)
Providing and laying bituminous concrete grade II with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder BitumenVG 30 and thickness of 30 mm@ 5.4 per cent of mix and filler transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction with J.M.F.approved by competent authority as per Morth specification clause No.5.05-507B complete in all aspects or as per direction of E/I (Rates are Excluding GST but Including of all other taxes labour cess ,material ,labour and T&P etc)
Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing.as per Morth specification clause No.6.01-601 complete in all aspects or as per direction of E/I (Rates are Excluding GST but Including of all other taxes labour cess ,material ,labour and T&P etc)
Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with M35 Grade Concrete 43 grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing with curing as per Morth specification clause No.6.02-602 complete in all aspects or as per direction of E/I (Rates are Excluding GST but Including of all other taxes labour cess ,material ,labour and T&P etc)
Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope andcompacted with Vibratory roller to meet requirment density not less than 97% of designed density as per J.M.F approved by competent authority compaction including and lift of table 300-2. as per Morth specification clause No.3.18-305 complete in all aspects or as per direction of E/I (Rates are Excluding GST but Including of all other taxes labour cess ,material ,labour and T&P etc)
Providing and laying boulders apron on river bed for protection against scour with stone boulder weighing not less than 40 kg eathc completes as per drawing and technical specification as per Morth specification clause No.16.01-2503 complete in all aspects or as per direction of E/I (Rates are Excluding GST but Including of all other taxes labour cess ,material ,labour and T&P etc)
Laying of a geotextile filter between pitching and embankment slopes on which pitching is laid to prevent escape of the embankment material through the voids of the stone pitching/cement concrete blocks as well as to allow free movement of water without creating any uplift head on the pitching as per Morth specification clause No.16.06-700&2504 complete in all aspects or as per direction of E/I (Rates are Excluding GST but Including of all other taxes labour cess ,material ,labour and T&P etc)
Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications as per Morth specification clause No.16.04-2504 A complete in all aspects or as per direction of E/I (Rates are Excluding GST but Including of all other taxes labour cess ,material ,labour and T&P etc)
Brick on edge pavement on road with bricks laid dry, joints filled with local sand including preparation of base to proper slope and its ramming spreading a layer of 1 cm (3/8") depth of local sand over the sub grade and including supply of all material labour and T & P etc. required for proper completion of the work as per SI no-763 complete in all aspects or as per direction of E/I (Rates are Excluding GST but Including of all other taxes labour cess ,material ,labour and T&P etc)
Dismantling of brick work or stone work in lime or cement mortar and including stacking of materials as directed by engineer in charge with a distance of 60 meter as per SI no-692 complete in all aspects or as per direction of E/I (Rates are Excluding GST but Including of all other taxes labour cess ,material ,labour and T&P etc)
Dismantling of Reinforced cement concrete work or Reinforced brickwork including stacking of materials as directed by engineer in charge with a distance of 60 meter as per SI no-694complete in all aspects or as per direction of E/I (Rates are Excluding GST but Including of all other taxes labour cess ,material ,labour and T&P etc)
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.as per Morth specification clause No.15.01-304 complete in all aspects or as per direction of E/I (Rates are Excluding GST but Including of all other taxes labour cess ,material ,labour and T&P etc)
Sand Filling in Foundation Trenches as per Drawing & Technical Specification.as per Morth specification clause No.15.03-304 complete in all aspects or as per direction of E/I (Rates are Excluding GST but Including of all other taxes labour cess ,material ,labour and T&P etc)
Plain Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications1500,1700&2100.PCC Grade M15with curing complete in all aspects or as per direction of E/I (Rates are Excluding GST but Including of all other taxes labour cess ,material ,labour and T&P etc) .
Supplying, fitting and placing HYSD bar reinforcement in foundation substucture super-structure complete as per drawing and technical specifications as per S.I.No. 504 complete in all aspects or as per direction of E/I (Rates are Excluding GST but Including of all other taxes labour cess ,material ,labour and T&P etc)
Reinforced Cement Concrete in Open Foundation Sub structure Super structure complete as per Drawing and Technical Specifications1500,1700&2100RCC Grade M30 with curing complete in all aspects or as per direction of E/I (Rates are Excluding GST but Including of all other taxes labour cess ,material ,labour and T&P etc)
Providing weep holes in reinforceed concerete abutment. Wing wall, return wall with 100mm dia AC Pipe extending through the full width of the structure slope of 1(V):20(H) towards drawing face with curing complete as per drawing and technical specification 2706&2200 complete in all aspects or as per direction of E/I (Rates are Excluding GST but Including of all other taxes labour cess ,material ,labour and T&P etc)
Providing and laying Cement concrete wearing coat M-35 grade including reinforcement complete as per drawing and Technical Specifications2702 with curing complete in all aspects or as per direction of E/I (Rates are Excluding GST but Including of all other taxes labour cess ,material ,labour and T&P etc)
Proving of pumping set with insulation for dewatering of seapage in foundation with all materials labour tools and plants etc required for proper complete work.complete in all aspects or as per direction of E/I (Rates are Excluding GST but Including of all other taxes labour cess ,material ,labour and T&P etc)
Concrete with 4cm gauge stone ballast, coarse sand and cement in the proportion of 8:4:1 with curing including supply of all material labour and T&Petc required for proper completion of work as per S.I. No. 281 .complete in all aspects or as per direction of E/I (Rates are Excluding GST but Including of all other taxes labour cess ,material ,labour and T&P etc)
Class 150 A brick work in 1:3 cement and coarse sand mortar in foundation and plinth including supply of all material labour with curing and T&Petc required for proper completion of work as per S.I. No. 307 .complete in all aspects or as per direction of E/I (Rates are Excluding GST but Including of all other taxes labour cess ,material ,labour and T&P etc)
Supply of hume pipe of 900 mm dia complete in all aspects or as per direction of E/I (Rates are Excluding GST but Including of all other taxes labour cess ,material ,labour and T&P etc)
Laying of hume pipe of 900 mm dia complete in all aspects or as per direction of E/I (Rates are Excluding GST but Including of all other taxes labour cess ,material ,labour and T&P etc)
Struck pointing with cement mortar consisting of 1part of cement and 2 part of fine sand of 1.25FM with curing including supply of all material labour and T&Petc required for proper completion of work as per S.I. No.574 .complete in all aspects or as per direction of E/I (Rates are Excluding GST but Including of all other taxes labour cess ,material ,labour and T&P etc)
Concrete with 4cm gauge stone ballast, coarse sand and cement in the proportion of 6:3:1 with curing including supply of all material labour and T&Petc required for proper completion of work as per S.I. No. 280 .complete in all aspects or as per direction of E/I (Rates are Excluding GST but Including of all other taxes labour cess ,material ,labour and T&P etc)
R.C.C.Work with cement approved coarse sand and 20 mm gauge stone grit in the praportion of 1:1.5:3 with curing excluding supply of reinforcement and its fixing and binding wire and including nacessary centering shuttering and curing as per S.i.no. 285Acomplete in all aspects or as per direction of E/I (Rates are Excluding GST but Including of all other taxes labour cess ,material ,labour and T&P etc)
Providing & fixing Km. Stone hectometer stone complete as per drawing and Technical specification complete in all aspects or as per direction of E/I (Rates are Excluding GST but Including of all other taxes labour cess ,material ,labour and T&P etc)
05YearMaintenance 1st Year Maintenance charge @0.00% including all taxes labour cess But Excluding G.S.T.
2nd Year Maintenance charge @0.25% including all taxes labour cess But Excluding G.S.T.
3rd Year Maintenance charge @0.50% including all taxes labour cess But Excluding G.S.T.
4th Year Maintenance charge @0.75% including all taxes labour cess But Excluding G.S.T.
5th Year Maintenance charge @1.00% including all taxes labour cess But Excluding G.S.T.
Please Enable Macros to View BoQ information
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.32 MB
SBD-2.pdf
Tender Documents • 2.64 MB
BOQ_2049230.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid