| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.0 LAccepted-Finance | ₹5.0 L | L1 | Accepted-Finance 1st Lowest Bidder |
| 2 | L2₹5.6 LRejected-Finance | ₹5.6 L | L2 | Rejected-Finance 2nd Lowest Bidder |
| Sl No | Description | Qty | Unit | Technocrat Electrical | ARK ENGINEERING |
|---|---|---|---|---|---|
| 1.00 | Shifting of Main Tank of 40 MVA , 132 /33 KV Transformer from safe open space to Loading point (Approx. 10 Meters distance at 132 KV S/s Kasia and approx. 10 Meters distance at 132 KV S/s Bhathat) including turning of tank , if required. All T&P and all associated men and materials required to satisfactorily complete the job shall be provided by contractor at his own cost, the work includes complete dismantling of Transformer, Opening of radiator joints and axhaust fan and its connection , its proper sealing with blank plate using Gasket and Nut and bolt , draining of Transformer oil to a safe limit and its storage in an air tight Drum as per the instruction of JE. | 1 | Job | 30,000 ₹35,400 | 28,000 ₹33,040 |
| 2.00 | Minimum Lump sum charges for one side Transportation of Transformer with all its accessories. The work include detailed Physical Route Survey from origin to Final Destination , all necessary permits from State / Local Authorities and safety standards to be adheared by Contractor at his own cost. | 1 | Job | 30,000 ₹35,400 | 3,00,000 ₹3.5 L |
| 3.00 | Freight Charges on per Kilometer Basis for one side Transportation of Transformer with all accessories (For distance approx. 70 Kms.) | 80 | Per Km | 3,18,400 ₹3.8 L | 28,000 ₹33,040 |
| 4.00 | Loading of Transformer at 132 KV Substation Kasia and its unloading at 132 KV S/s Bhathat. The work include Adherence to all safety measures, checking for sign all Physical damage during Transit , use of suitable equipment for safe unloading up to the plinth and repair of any damage done during the Transportation at Substation. | 1 | Per T/F | 30,000 ₹35,400 | 90,000 ₹1.1 L |
| 5.00 | Transit Insurance during period of T/F and 45 days after Return of Transformer against all risk. | 1 | Per T/F | 15,000 ₹17,700 | 30,000 ₹35,400 |
Updated dates
Tender Value
₹6.8 L
EMD Value
₹6,800
Closing Date
3 Feb 2026, 5:00 pmClosed
Superintending Engineer
Electricity Transmission Circle, UPPTCL, Pareshan Bhawan , Mohaddipur , Gorakhpur
WORK OF SHIFTING AND LOADING OF 40 MVA TRANSFORMER AT 132 KV S/S KASIA , KUSHINAGAR AND ITS CARRIAGE FROM 132 KV S/S KASIA, KUSHANAGAR TO 132 KV SUBSTATION BHATHAT, GORAKHPUR AND ITS ERECTION AND OTHER ASSOCIATED WORKS AT 132 KV S/S BHATHAT , GORAKH
2026_UPTCL_1103997_1
E-Tender No. 63-ETC(G)/2025-26
Open Tender
Electrical Works
45 days
Gorakhpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
SE, ETC, Gorakhpur
₹6,800
16 Feb 2026
5 Jan 2026
4 Feb 2026
5 Jan 2026
3 Feb 2026
5 Jan 2026
Shifting of Main Tank of 40 MVA , 132 /33 KV Transformer from safe open space to Loading point (Approx. 10 Meters distance at 132 KV S/s Kasia and approx. 10 Meters distance at 132 KV S/s Bhathat) including turning of tank , if required. All T&P and all associated men and materials required to satisfactorily complete the job shall be provided by contractor at his own cost, the work includes complete dismantling of Transformer, Opening of radiator joints and axhaust fan and its connection , its proper sealing with blank plate using Gasket and Nut and bolt , draining of Transformer oil to a safe limit and its storage in an air tight Drum as per the instruction of JE.
Minimum Lump sum charges for one side Transportation of Transformer with all its accessories. The work include detailed Physical Route Survey from origin to Final Destination , all necessary permits from State / Local Authorities and safety standards to be adheared by Contractor at his own cost.
Freight Charges on per Kilometer Basis for one side Transportation of Transformer with all accessories (For distance approx. 70 Kms.)
Loading of Transformer at 132 KV Substation Kasia and its unloading at 132 KV S/s Bhathat. The work include Adherence to all safety measures, checking for sign all Physical damage during Transit , use of suitable equipment for safe unloading up to the plinth and repair of any damage done during the Transportation at Substation.
Transit Insurance during period of T/F and 45 days after Return of Transformer against all risk.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.14 MB
BOQ_2036377.xls
BOQ • 0.39 MB
Technical63.pdf
Tender Documents • 0.62 MB
Download all tender documents and submit your bid