Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.9 LAccepted-Finance | ₹24.9 L | L1 | Accepted-Finance Being lowest |
| 2 | L2₹25.3 LRejected-Finance VILLAGE POST PATHOLI AGRA UTTAR PRADESH INDIA | ₹25.3 L | L2 | Rejected-Finance Other than lowest |
| 3 | L3₹26.7 LRejected-Finance | ₹26.7 L | L3 | Rejected-Finance Other than lowest |
| 4 | L4₹26.9 LRejected-Finance | ₹26.9 L | L4 | Rejected-Finance Other than lowest |
| 5 | L5₹27.4 LRejected-Finance | ₹27.4 L | L5 | Rejected-Finance Other than lowest |
| Sl No | Description | Qty | Unit | Attar Singh and Sons L15 | N.K. ENTERPRISES L4 | MNR ASSOCIATES L6 | SahaDevSingh Constructions L16 | Balaji Associates L9 | C P Singh and Co L2 | PD GUPTA AND COMPANY L13 | Asha Construction L12 | SHRI RADHAYSHYAM JHA L18 | aman construction & general suppliers L11 | m/s Vishersh builders L20 | Abhi Construction L14 | saroj constructions L19 | M/S APOORVA CONSTRUCTION L17 | M/S RADHEY GOVIND ENTERPRISES L3 | M/s Krishna Construction Company L8 | THENUA BUILDERS L5 | RAJEEV CONSTRUCTION L10 | M/S DEVENDRA KUMAR GUPTA L1 | shree shyam construction L7 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Dismantling posts or struts(wood, steel or R.C.C.) anysection, including taking out embedded portion and making good disturbed\ ground complete all as specified and directed. | 260 | RM | 15 ₹3,900 | 10 ₹2,600 | 8 ₹2,080 | 15 ₹3,900 | 20 ₹5,200 | 10 ₹2,600 | 10 ₹2,600 | 8 ₹2,080 | 49 ₹12,740 | 15 ₹3,900 | 40 ₹10,400 | 5 ₹1,300 | 60 ₹15,600 | 39 ₹10,140 | 10 ₹2,600 | 5 ₹1,300 | 40 ₹10,400 | 40 ₹10,400 | 20 ₹5,200 | 50 ₹13,000 |
| 2.00 | Excavation of post holes each not exc 0.50 cum and getting out in soft and loose soils, returning, filling in and ramming earth or broken rubble mixed with earth around in layers not exc 25 cm , watering and removing surplus soils to a distance not exc 50 m and making good surfaces. | 260 | Each | 150 ₹39,000 | 40 ₹10,400 | 80 ₹20,800 | 30 ₹7,800 | 130 ₹33,800 | 10 ₹2,600 | 70 ₹18,200 | 38 ₹9,880 | 229 ₹59,540 | 65 ₹16,900 | 50 ₹13,000 | 30 ₹7,800 | 100 ₹26,000 | 200 ₹52,000 | 50 ₹13,000 | 80 ₹20,800 | 70 ₹18,200 | 100 ₹26,000 | 50 ₹13,000 | 100 ₹26,000 |
| 3.00 | M&L for cement concrete type C-2 1:3:6 (using 40 mm graded stone aggregate) in foundations, filling and mass concrete complete all as specified and directed. | 10.53 | Cum | 2,600 ₹27,378 | 3,000 ₹31,590 | 4,800 ₹50,544 | 3,200 ₹33,696 | 4,500 ₹47,385 | 3,000 ₹31,590 | 3,600 ₹37,908 | 3,000 ₹31,590 | 3,999 ₹42,109.47 | 6,000 ₹63,180 | 3,100 ₹32,643 | 2,700 ₹28,431 | 2,500 ₹26,325 | 4,000 ₹42,120 | 4,500 ₹47,385 | 3,000 ₹31,590 | 3,500 ₹36,855 | 3,800 ₹40,014 | 2,590 ₹27,272.7 | 4,800 ₹50,544 |
| 4.00 | S & F angle iron as in post and struts in fencing including embedding in concrete, cutting tops to shape as directed, drilling holes, notching for wire etc flat iron fillets (for securing wire mesh etc.) including all necessary drilling, bolting or riveting, etc., simillar work confirming to Fe-290 Gde E-165 complete all as specified. | 2,900 | Kg | 125 ₹3,62,500 | 87 ₹2,52,300 | 100 ₹2,90,000 | 95 ₹2,75,500 | 110 ₹3,19,000 | 90 ₹2,61,000 | 90 ₹2,61,000 | 132 ₹3,82,800 | 109 ₹3,16,100 | 95 ₹2,75,500 | 110 ₹3,19,000 | 110 ₹3,19,000 | 100 ₹2,90,000 | 99 ₹2,87,100 | 100 ₹2,90,000 | 90 ₹2,61,000 | 98 ₹2,84,200 | 90 ₹2,61,000 | 90 ₹2,61,000 | 80 ₹2,32,000 |
| 5.00 | Supply only GI chain link fencing (weight not less then 2.4kg/sqm)including line wires to any type of standards, rails, straining bolts, etc. complete all as specified and directed.
Note :- Line wire and flat iron will be measured and paid separately | 3,050 | Kg | 130 ₹3,96,500 | 100 ₹3,05,000 | 84 ₹2,56,200 | 110 ₹3,35,500 | 119 ₹3,62,950 | 130 ₹3,96,500 | 120 ₹3,66,000 | 110 ₹3,35,500 | 149 ₹4,54,450 | 98 ₹2,98,900 | 135 ₹4,11,750 | 125 ₹3,81,250 | 140 ₹4,27,000 | 95 ₹2,89,750 | 101 ₹3,08,050 | 110 ₹3,35,500 | 135 ₹4,11,750 | 130 ₹3,96,500 | 95 ₹2,89,750 | 70 ₹2,13,500 |
| 6.00 | Fixing only GI chain link fencing including line wires to any type of standards, rails, straining bolts, etc. including provission of flat iron for securing with post and taking down existing chain link fencing complete all as specified and directed.
Note :- Line wire and flat iron will be measured and paid separately | 1,170 | Sqm | 50 ₹58,500 | 35 ₹40,950 | 15 ₹17,550 | 35 ₹40,950 | 30 ₹35,100 | 40 ₹46,800 | 20 ₹23,400 | 50 ₹58,500 | 69 ₹80,730 | 20 ₹23,400 | 45 ₹52,650 | 30 ₹35,100 | 65 ₹76,050 | 5 ₹5,850 | 40 ₹46,800 | 50 ₹58,500 | 50 ₹58,500 | 100 ₹1,17,000 | 50 ₹58,500 | 30 ₹35,100 |
| 7.00 | S&FMild steel screw bolts (machine made) with hexagonal or square
heads at one end and screwed the other, or screwed both ends, each
screwed end to be fittedwith washers and one hexagonal or square
nut, exc 5cm but n exc 10cm long and 08to 20 mm diameter of neck complete all as specified and directed. | 70 | kg | 140 ₹9,800 | 115 ₹8,050 | 120 ₹8,400 | 150 ₹10,500 | 110 ₹7,700 | 100 ₹7,000 | 150 ₹10,500 | 130 ₹9,100 | 109 ₹7,630 | 120 ₹8,400 | 190 ₹13,300 | 110 ₹7,700 | 110 ₹7,700 | 100 ₹7,000 | 100 ₹7,000 | 150 ₹10,500 | 110 ₹7,700 | 110 ₹7,700 | 120 ₹8,400 | 100 ₹7,000 |
| 8.00 | S&F MS deformed bars 10 mm dia and above cut to length, bent to shape required including cranking, bending, hooking ends and binding with and including MS wire (annealed) not less than 0.9 mm dia complete all as specified and directed. | 1,450 | Kg | 110 ₹1,59,500 | 85 ₹1,23,250 | 84 ₹1,21,800 | 95 ₹1,37,750 | 110 ₹1,59,500 | 100 ₹1,45,000 | 90 ₹1,30,500 | 115 ₹1,66,750 | 109 ₹1,58,050 | 90 ₹1,30,500 | 116 ₹1,68,200 | 90 ₹1,30,500 | 90 ₹1,30,500 | 99 ₹1,43,550 | 95 ₹1,37,750 | 90 ₹1,30,500 | 85 ₹1,23,250 | 85 ₹1,23,250 | 88 ₹1,27,600 | 80 ₹1,16,000 |
| 9.00 | S&F in repair galvanised ,2 srand steel barbed wire 2.24mm dia barbed with 2mm dia barsbs at 75mm spacibg and staining rail staining bolts incl, securing or tying at crossing with and provision of galvanised mild steeled wire staples or steel pins etc as directed (each line wire to be measured) complete all as specified and directed. | 16 | 100 RM | 1,500 ₹24,000 | 1,400 ₹22,400 | 1,400 ₹22,400 | 1,800 ₹28,800 | 2,000 ₹32,000 | 950 ₹15,200 | 1,000 ₹16,000 | 1,380 ₹22,080 | 1,399 ₹22,384 | 850 ₹13,600 | 1,605 ₹25,680 | 1,350 ₹21,600 | 1,500 ₹24,000 | 1,250 ₹20,000 | 1,800 ₹28,800 | 2,000 ₹32,000 | 1,250 ₹20,000 | 1,500 ₹24,000 | 1,290 ₹20,640 | 1,000 ₹16,000 |
| 10.00 | M&L for demolition of reinforced cement concrete of any description and in any position complete all as specified and directed by Engineer in Charge | 8 | Cum | 300 ₹2,400 | 150 ₹1,200 | 120 ₹960 | 300 ₹2,400 | 60 ₹480 | 200 ₹1,600 | 200 ₹1,600 | 350 ₹2,800 | 249 ₹1,992 | 6,350 ₹50,800 | 250 ₹2,000 | 400 ₹3,200 | 150 ₹1,200 | 1,500 ₹12,000 | 500 ₹4,000 | 500 ₹4,000 | 350 ₹2,800 | 500 ₹4,000 | 190 ₹1,520 | 400 ₹3,200 |
Tender Value
Refer Docs
EMD Value
₹70,000
Closing Date
29 May 2026, 6:00 pmClosed
Maj Dinoop Kumar
GE (W) Agra
REPAIR TO BOUNDARY WALL, DRAIN, GARBAGE BIN, FENCING AND GATE IN MD ACCN UNDER AGE B/R -II OF GE (W) AGRA
2026_MES_764302_1
8012/1184/E8
Open Tender
Civil Works
180 days
GE (W) Agra
Please refer tender document
9 documents required · 9 mandatory
₹500
GE (W) Agra
₹70,000
22 Jun 2026
8 May 2026
5 Jun 2026
8 May 2026
29 May 2026
23 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling posts or struts(wood, steel or R.C.C.) anysection, including taking out embedded portion and making good disturbed\ ground complete all as specified and directed. | 260 | RM | - | - |
| 2 | Excavation of post holes each not exc 0.50 cum and getting out in soft and loose soils, returning, filling in and ramming earth or broken rubble mixed with earth around in layers not exc 25 cm , watering and removing surplus soils to a distance not exc 50 m and making good surfaces. | 260 | Each | - | - |
| 3 | M&L for cement concrete type C-2 1:3:6 (using 40 mm graded stone aggregate) in foundations, filling and mass concrete complete all as specified and directed. | - | Cum | - | - |
| 4 | S & F angle iron as in post and struts in fencing including embedding in concrete, cutting tops to shape as directed, drilling holes, notching for wire etc flat iron fillets (for securing wire mesh etc.) including all necessary drilling, bolting or riveting, etc., simillar work confirming to Fe-290 Gde E-165 complete all as specified. | 2,900 | Kg | - | - |
| 5 | Supply only GI chain link fencing (weight not less then 2.4kg/sqm)including line wires to any type of standards, rails, straining bolts, etc. complete all as specified and directed.
Note :- Line wire and flat iron will be measured and paid separately | 3,050 | Kg | - | - |
| 6 | Fixing only GI chain link fencing including line wires to any type of standards, rails, straining bolts, etc. including provission of flat iron for securing with post and taking down existing chain link fencing complete all as specified and directed.
Note :- Line wire and flat iron will be measured and paid separately | 1,170 | Sqm | - | - |
| 7 | S&FMild steel screw bolts (machine made) with hexagonal or square
heads at one end and screwed the other, or screwed both ends, each
screwed end to be fittedwith washers and one hexagonal or square
nut, exc 5cm but n exc 10cm long and 08to 20 mm diameter of neck complete all as specified and directed. | 70 | kg | - | - |
| 8 | S&F MS deformed bars 10 mm dia and above cut to length, bent to shape required including cranking, bending, hooking ends and binding with and including MS wire (annealed) not less than 0.9 mm dia complete all as specified and directed. | 1,450 | Kg | - | - |
| 9 | S&F in repair galvanised ,2 srand steel barbed wire 2.24mm dia barbed with 2mm dia barsbs at 75mm spacibg and staining rail staining bolts incl, securing or tying at crossing with and provision of galvanised mild steeled wire staples or steel pins etc as directed (each line wire to be measured) complete all as specified and directed. | 16 | 100 RM | - | - |
| 10 | M&L for demolition of reinforced cement concrete of any description and in any position complete all as specified and directed by Engineer in Charge | 8 | Cum | - | - |
stage.html
html • 0.09 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.26 MB
BOQ_856063.xls
BOQ • 1.92 MB
Tender.pdf
Tender Documents • 0.59 MB
Download all tender documents and submit your bid