Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 4 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 5 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
Tender Value
₹8.3 L
EMD Value
₹82,916
Closing Date
3 Sept 2026, 12:00 pmClosed
Chief Engineer civil
NAGAR NIGAM AGRA
Lohamandi Zone, Room No. 83 Construction of a damaged drain and side berm from Verma Ji house in Rajamandi Balka Basti to the old Post Office.
2026_DOLBU_1180584_1
03-08-2026/NAGAR NIGAM AGRA/03-09-2026/171
Open Tender
Construction Works
Percentage
30 days
AGRA
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
Nagar Nigam
₹82,916
3 Sept 2026
29 Aug 2026
3 Sept 2026
29 Aug 2026
3 Sept 2026
29 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling brick work or stone work in lime or Cement mortar and including stacking of material as directed by E/IC with in a distance of 60 meters (200 feet) but Mud Mortar (SI No. 692) | 26.57 | Sqm | 650 | ₹17,270.5 |
| 2 | Cartage of ballast, Kankar, Coat, Grit or sand etc. including loading and unloading but excluding stacking on pucca roads.up to 8 Km distance | 26.57 | Sqm | 230.1 | ₹6,113.76 |
| 3 | Class-150 (Non Modular) brick work in 1:4 cement and Fine sand mortar in including supply of all material, labor T&P etc. (Fine snad not less than in 1.25FM) S.No. 6.1.1A) | 53.79 | Cum | 5,650 | ₹3,03,913.5 |
| 4 | P/L GSB with graded stone ballast with stone grit size stone ballast with hand ramming watering including all material labor T&P etc.all complete (NS) | 25.08 | Cum | 2,704 | ₹67,816.32 |
| 5 | Supply & fixing of pre-cast M-30 cement concrete RUBBER MOLD INTERLOCKING TILES over 40mm thick local sand bed, with 3mm thick joints filled with local sand including leveling, tempering and sweeping etc., interlocking bricks will be as description given in direction issued by the IRCSC-03-2004 and should be ISI marked all complete. (N.S.) 80mm thick, Strength should not less than M-30 (NS) | 313.5 | Sqm | 834 | ₹2,61,459 |
| 6 | 12mm thick cement plaster in single coat of fair side of single of half brick wall for interior plastering up to floor two level including internal rounded angles chamfers and rounded angles not excluding 80mm in girth and finished even and smooth. No extra for mixing any additive. (c) 1 cement : 4 Coarse sand. (Chapter No. 13 S.I. No.-582(ii)) | 396 | Sqm | 200 | ₹79,200 |
| 7 | Providing and laying cement concrete in 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) and curing complete, including cost of form work in foundation and floors. (DSR SN-4.1.3) | 8.75 | CUM | 6,600 | ₹57,750 |
| 8 | R.C.C. work Providing and laying in position specified grade of R.C.C. Raft foundation, including the cost of centering, shuttering, finishing and excluding reinforcement. All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 40 mm nominal size) (Chapter 5 S.I. No. 5.1.4) | 1.8 | CUM | 7,600 | ₹13,680 |
| 9 | Mild Steel or iron in plain work such as reinforced concrete or reinforced brick work (When not included in and an overall rates) brought to required shape as necessary including bending for proper completion of the work and including supply of steel, its wastage bend hooks and authorized over lapping shall be measured up to floor two level. (10 mm to 12mm tor (TMT Bars). | 1.41 | Qtl | 8,500 | ₹11,985 |
| 10 | Supply/Fixing of Black Granite Stone work display board. (NS) | 1 | Job | 10,000 | ₹10,000 |
stage.html
html • 0.02 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 10.81 MB
BOQ_2219852.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .