Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹47.7 LAdmitted-Fee/PreQual/Technical/Finance | -30.11% | ₹47.7 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹52.4 L+₹4.7 L (9.84%)Admitted-Fee/PreQual/Technical/Finance | -23.23% | ₹52.4 L+₹4.7 L (9.84%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹68.3 L
EMD Value
₹1.4 L
Closing Date
18 Jul 2026, 2:00 pmClosed
Executive Engineer, FSC Narbal
Narbal
Deepening and Widening Construction of Toe wall Ghat , Syphons, foot bridge, sluice gates near offtake point and raising and strengthening of embankment of Anum Khul.
2026_IFC_313703_1
e-NIT No. 09 of 2026-27
Open Tender
Civil Works
Percentage
60 days
Narbal
Please refer Tender documents.
5 documents required · 5 mandatory
₹2,500
Executive Engineer FSC Division Narbal
₹1.4 L
30 Jul 2026
25 Jun 2026
20 Jul 2026
25 Jun 2026
18 Jul 2026
25 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil : | 1,507.3 | Cum | 187.3 | ₹2,82,317.29 |
| 2 | Extra for earth in or under water mud including pumping out water as required | 670.5 | Cum | 37.46 | ₹25,116.93 |
| 3 | Dumping stone excluding cost of stones in Horizontal on level | 79.3 | Cum | 237.9 | ₹18,865.47 |
| 4 | Supply of Stone boulder (nallah) nominal size 225 mm | 79.3 | Cum | 1,015 | ₹80,489.5 |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 49.66 | Cum | 5,202.9 | ₹2,58,376.01 |
| 6 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 118.65 | Cum | 7,104.35 | ₹8,42,931.13 |
| 7 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 16.45 | Cum | 7,788.4 | ₹1,28,119.18 |
| 8 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 5.4 | Cum | 9,821.85 | ₹53,037.99 |
| 9 | Extra for laying reinforced cement concrete in or under water and/ or liquid mud including cost of pumping or bailing out water and removing slush etc., complete. | 107.71 | Cum | 788.25 | ₹84,902.41 |
| 10 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Thermo-Mechanically Treated bars of grade Fe-500D or more. | 9,304.07 | kg | 123.2 | ₹11,46,261.42 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.56 MB
BOQ_1015456.xls
BOQ • 0.34 MB
ext.pdf
PDF • 0.56 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .