Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 LAccepted-AOC VILLAGE BALYNAPUR KHURD SONIPAT | ₹2.0 L | L1 | Accepted-AOC L1 |
| 2 | L2₹2.0 L+₹5,450 (2.79%)Rejected-AOC VILLAGE RATAULI DISTRICT ROHTAK | ROHTAK | ROHTAK | HARYANA | ₹2.0 L+₹5,450 (2.79%) | L2 | Rejected-AOC l2 |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹2.0 L
EMD Value
₹3,920
Closing Date
23 Mar 2026, 5:00 pmClosed
Jagmal
DIV 1 Rohtak
A/mtc of roads in Sector-5, U/E, Rohtak
2026_HBC_508954_1
20264EB33839 FF5D 4E60 808A 43818ACD823E267HSV
Open Tender
Civil Works
Works
30 days
Rohtak
As per approved DNIT/NIT/CBD
2 documents required · 2 mandatory
₹250
₹3,920
Yes
29 Apr 2026
17 Mar 2026
24 Mar 2026
17 Mar 2026
23 Mar 2026
17 Mar 2026
[17.14.3]Granular Sub-Base with Close Graded Material - (Table:- 400-1) Plant mix method Construction of granular sub-base by providing Material as per Grading III (Table 400-I of MORTandH 5th revision) mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per technical clause 401 of MORTandH specifications 3. Grading III material
[17.24]Wet Mix Macadam Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density as per technical clause 406 of MORT&H specifications
NS Item) Providing and laying of Shelmac ready mix bituminous material for instant restoration of patchwork, repair of potholes, depression and road cuts to provide uniform and smooth riding surface complete in all respect. The contractor shall prepare the required surface for maximum results i.e. remove standing water / loose debris/ dust with brush from potholes, will pour Shelmac directly from the bag into potholes. Compaction will be done with a simple hand rammer so as to cure quickly enough to open to traffic immediately after the compaction is completed. The contractor shall arrange all the safety measures during the execution of the above said job and nothing extra shall be paid on this account by the Department. (The Shelmac – PR (Bitumen Contents 5%) supply will be of packing of 50 Kg HDPE Bag with inside LDPE liner).
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.82 MB
BOQ_587727.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .