Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹26.5 LAccepted-AOC 6A BANAMALI GHOSHAL LANE KOLKATA 700034 | KOLKATA | WEST BENGAL | 700034 | L1 | Accepted-AOC Accepted | |
| 2 | L2₹27.3 L+₹73,110 (2.75%)Rejected-Finance 15 1 1F MAYUR BHANJ ROAD POLICE STATION EKBALPORE KOLKATA 700023 | KOLKATA | KOLKATA | WEST BENGAL | 700023 | L2 | Rejected-Finance Higher bid value | |
| 3 | L3₹27.4 L+₹81,510 (3.07%)Rejected-Finance GC ROAD ABDUL LATIF ROAD PO TITAGARH KOLKATA 700119 | 24 PARAGANAS NORTH | WEST BENGAL | 700119 | L3 | Rejected-Finance Higher bid value | |
| 4 | L4₹27.7 L+₹1.1 L (4.20%)Rejected-Finance 51 1 FULBAGAN ROAD BAGHAJATIN KOLKATA 700086 WEST BENGAL | KOLKATA | WEST BENGAL | 700086 | L4 | Rejected-Finance Higher bid value | |
| 5 | L5₹28.4 L+₹1.9 L (6.97%)Rejected-Finance 30 SHIVTALLA STREET KOLKATA 700 007 | KOLKATA | KOLKATA | WEST BENGAL | 700007 | L5 | Rejected-Finance Higher bid value |
Tender Value
₹28.8 L
EMD Value
₹57,600
Closing Date
3 Sept 2020, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GE ALIPORE KOLKATA
NO 1 NATIONAL LIBRARY AVENUE, ALIPORE, KOLKATA 700027
8850/E8
2020_MES_333169_3
GE/ALP (8850) OF KOLKATA 2019-20
Open Tender
Civil Works
Item Rate
180 days
GE ALIPORE KOLKATA
Class D Category a i
9 documents required · 9 mandatory
₹500
GARRISON ENGINEER ALIPORE
₹57,600
Yes
6 Oct 2020
5 Aug 2020
4 Sept 2020
5 Aug 2020
3 Sept 2020
20 Aug 2020
60 days
Amount
Taking down cement plaster of any description built in cement mortar on brick or stone walls etc including racking out joints, hacking for Key, scrubbing down with water etc upto four storie bldg complete all as specified and as directed.
Ditto all as per Item No 1 but from five to eight storey bldg complete all as specified and as directed.
Chipping of unsound /weak concrete materials from slabs , lintel,chajja, fin, facia etc. by any means as directed by engr-in-charge including tapering all edges, making square shoulders of cavities air or sand blasting etc and cleaning of exposed concrete surface of lightly picking materials by air blasting or sand blasting incl foreign matrials , loose concrete/aggregate etc and disposal of all debris out of MOD land upto four story bldg for 25mm average thickness complete all as specified and as directed.
Ditto all as per Item No 3 but from five to eight storey bldg complete all as specified and as directed.
Demolition of reinforced cement concrete (reinforcement cut as required to facilitate demolition) as roofs, floors, beams, staircase, landing slab, chajja/ sunshade, etc. of any position upto four storied of building including removing of demolished materials from site complete all as specified and as directed.
Ditto all as per Item No 5 but from five to eight storey bldg complete all as specified and as directed.
Material and Labour Removing of concrete all around reinforcement excluding from behind the bar by manual methods (using wire brushing ,chiselling etc) and applying alkaline rust removing chemical followed by removing rust by emery paper and cleaning the area throughly by water and allow it to dry all as per manufacturer, instruction to give it a totally rust free finished steel surface upto four storie bldg upto 12 mm dia bar complete all as specified and as directed.
Ditto all as Item No 7 but from five to eight storey bldg complete all as specified and as directed.
All as per Item 7 but for above 12mm dia bars complete all as specified and as directed.
Ditto all as per Item 9 above but from five to eight storey bldg complete all as specified and as directed.
Material and Labour for introducing upto 12 mm dia reinforcement bars for structural connection in RCC beams, columns, lintel and slabs including power drilling holes of appropriate diameters in reinforced or plain cement concrete to a minimum depth of 150mm and upto 200mm including power drilling,fixing the reinforcement in position using epoxy, cleaning of loose dust by blowing air, sealing with epoxy cartridges etc upto four storie bldg complete all as specified and as directed.
Ditto all as per Item 11 above but from five to eight storey bldg ccomplete all as specified and as directed.
All as per Item 11 above but for above 12mm dia bars complete all as specified and as directed.
Ditto all as per 13 above but from five to eight storey bldg complete all as specified and as directed.
Supply and application of Epoxy Zinc rich primer on the prepared steel surface excluding behind the bar by brush the primer shall have a minimium specific gravity 1.75 minimum weight film thickness/coat 40 microns and minimum adhesive bond strength with steel is 1.5N/mm2 upto four storie bldgc complete all as specified and as directed.
Ditto all as per 15 above but from five to eight storey bldg complete all as specified and as directed.
Supply, mixing and application two component structural grade polymer modified reinstatement morter, where local spalling has taken place or shuttering is not possible . The morter can be applying in layers not exceeding 6mm thick in each layer in and upto any thickness in smaller vertical pockets and upto any thickness in horizontal applications. The mortar should have a minimium compressive strength 12N/mm2 in 1 day and 45N/mm2 in 28 days. Minimum flexural strength should be 8 N/mm2 in 28 days. A modified styrene butadience emulsion for use as a bonding aid and gauging liquid for cementious system to be mixed with cement slurry before the application of modified polymer mortar to be used @ 6 ltr/bag of cement. The bonding agent should have minimium compressive strength 24N/mm2. Minimum tensile strength 3.5N/mm2, minimium flexural strength 6.5N/mm2 complete upto foure storie bldg complete all as specified and as directed.
Ditto all as per Item 17 above but from five to eight storey bldg complete all as specified and as directed.
Material and Labour for applying curing compound over concrete surfaces as per manufactures instruction upto eight storie bldg complete all as specified and as directed.
Material and Labour for Rendering 15mm thick in CM (1:4) on other than fair face of brick work or concrete surfaces and finished the surface even and smooth with using WPC complete upto four storie bldg complete all as specified and as directed.
Ditto all as per Item 20 above but from five to eight storey bldg complete all as specified and as directed.
Material and Labour for 15 mm thick cement plaster 1:6 on fair faces of brick work or concrete surfaces even and smooth without using extra cement upto 4 storey high bldg complete all as specified and as directed.
Ditto all as per Item 22 above but from five to eight storey bldg complete all as specified and as directed.
Material and Labour for Rendering 5mm thick with CM (1:3) on or concrete surfaces and finished the surface even and smooth without using extra cement as in ceiling upto four storie bldg complete all as specified and as directed.
Ditto all as per Item 24 above but from five to eight storey bldg complete all as specified and as directed.
Material and Labour Preparing new plastered surfaces of ceiling and applying 3 coats of white wash on ceilingss upto four storie bldg complete all as specified and as directed.
Ditto all as per Item 26 above but from five to eight storey bldg complete all as specified and as directed.
Materials and labour for preparation of new plastered surfaces of wall and applying two coats of Acrylic distemper over a coat of chalk whiting primer upto four storied of building complete all as specified and as directed.
Ditto all as per Item 28 above but from five to eight storey bldg complete all as specified and as directed.
Material and Labour for Preparing new plastered surfaces of wall and applying 3 coats of white wash on wall upto four storie bldg complete all as specified and as directed.
Ditto all as per Item 30 above but from five to eight storey bldg complete all as specified and as directed.
Material and Labour preparation on new plastered surfaces of wall and applying 2 coats of cement base paint over a coat of primer upto 4 th storey of building complete all as specified and as directed.
Ditto all as per Item 32 above but from five to eight storey bldg complete all as specified and as directed.
Material and Labour for RCC (nominal mix) type B-1 (1:2:4) using 20mm graded stone aggregate as in facia, fins, parapets, balcony and similar suspended work upto four storied of building complete all as specified and as directed.
Ditto all as per Item 34 above but from five to eight storey bldg complete all as specified and as directed.
Material and Labour for RCC(nomonal mix) type B-1 (1:2:4) using 20mm graded stone aggregate as in chajja and similar suspended work upto four storied of building complete all as specified and as directed.
Ditto all as per Item 36 above but from five to eight storey bldg complete all as specified and as directed.
Providing of formwork to sides and soffits of concrete of facia, fins, parapets and similar works with rough finished surfaces of concrete upto four storied of building complete all as specified and as directed.
Ditto all as per Item 38 above but from five to eight storey bldg complete complete all as specified and as directed.
Providing of formwork to sides and soffits of suspended slab or chajja, etc. with rough finished surfaces of concrete upto four storied of building complete all as specified and as directed.
Ditto all as per Item 40 above but from five to eight storey bldg complete complete all as specified and as directed.
Supply and fixing TMT bar 10mm dia and over, cut to length , bend to shape required, including cranking, bending, hooking end etc. including MS wire (annealed) not less than 0.9mm dia upto four storied of building complete all as specified and as directed.
Material and labour for providing lock fix bars to the RCC member by the procedure, depth of hole not exc. 10cm and dia 1.5x dia of bars and filling the material in the half depth of hole then insert the rod allow to set all as per as per the manufactureres instruction upto twelve storied building complete all as specified and as directed.
Material and Labour for PCC (1:3:6) type c1(using 20mm graded stone agregate as in hold fast bed plates coping etc incl nessesary form work complete all as specified and as directed.
Providing and fixing double steel scaffolding (cup lock type) on the exterior side of building / structure/overhead tank, upto 04 storey ht of building , including additoinal rows of scaffolding in stepped manner as per requirements of site, made with minimum 40mm dia MS tube placed 1.5 m c/c (maximaum) , horizontal & vertical tubes joint with cup & lock system with MS tube , MS Tube challis , MS clamps and staircase system in the scaffolding for working platform etc. And maintainng it in a serviceable condition for execution of work and removing it therafter. The scaffolding system shall be stiffened with bracing , runners , connecting with the building etc wherever required , if feasible , for inspection of work at required locations with esential safety featurs for the workmen etc. complete all as per directions and approval of GE. (upto and including 15 mtr height) Note:- (1) The elevational area of structure (length/breadth of building X height of building) of the scaffolded area shall be measured for payment purpose. (2) The payment shall be made once time only for execution of all times each face of building/structure. (3) After completion of work all scaffolding materials shall be removed from building / structure by the contractor and the same shall be removed from building/ structure by the contractor and the same shall be the property of the contractor and accordingly rate shall be quoted.
Providing and fixing double steel scaffolding (cup lock type) on the exterior side of building / structure/overhead tank, from 5 to 8 storey of building , including additoinal rows of scaffolding in stepped manner as per requirements of site, made with minimum 40mm dia MS tube placed 1.5 m c/c (maximaum) , horizontal & vertical tubes joint with cup & lock system with MS tube , MS Tube challis , MS clamps and staircase system in the scaffolding for working platform etc. And maintainng it in a serviceable condition for execution of work and removing it therafter. The scaffolding system shall be stiffened with bracing , runners , connecting with the building etc wherever required , if feasible , for inspection of work at required locations with esential safety featurs for the workmen etc. complete all as per directions and approval of GE. (above 15 mtr height) Note:- (1) The elevational area of structure (length/breadth of building X height of building) of the scaffolded area shall be measured for payment purpose. (2) The payment shall be made once time only for execution of all times each face of building/structure. (3) After completion of work all scaffolding materials shall be removed from building / structure by the contractor and the same shall be removed from building/ structure by the contractor and the same shall be the property of the contractor and accordingly rate shall be quoted.
Supply and Fixing in repairs 15mm bore tube medium grade galvanised with all fittings fixed complete to wall and ceiling or laid in floors complete all as specified and as directed.
-Ditto- all as per Item 47 above but bore in 20 mm complete all as specified and as directed.
Dismantiling of floor hearth or wall tiling incl cement mortar bedding (but not backing), and rubbish off the premises (out of MOD land), complete all as specified and as directed.
Material and Labour backing coat/Screed bed or bedding layer of mortar 10 mm thick in cement mortar (1:3) as in dado/skirting complete all as specified and as directed.
Material and Labour Screed bed or bedding layer 15 mm thick in cement mortar (1:6) for laying floor finishes complete all as specified and as directed.
Material and Labour for Non-skid coloured ceramic floor tiles 7 to 8 mm thick area of each tile exc 0.11 sqm but n exc 0.18 sqm in floor set and jointed in neat cement slurry and pointed in white or coloured cement to to match the shade of tiles complete all as specified and as directed.
Material and Labour for Glazed ceramic coloured wall tiles of size 300x200x 7 to 8mm thick set and jointed in neat cement slurry and pointed in white or coloured cement to match the shade of tiles complete all as specified and as directed.
Demolition of brick work built in cement mortar including all quions, arches, pillers etc complete all as specified and as directed.
Material and labour for brick work with sub class `B` bricks, old size, straight or curved on plan exc 6m mean radius built in cement mortar (1:6) complete all as specified and as directed.
Dismantling wrought iron or mild steel work of any description not otherwise provided for complete all as specified and as directed.
Framed work such as grills,gratings, etc.. with ends of bars shouldered and/or riveted, or forged into spikes; framed guard bars; barred iron doors; ladders; framed balusters; walk ways; railings; framework of water tanks and similar work conforming to Fe.290.Gde-E-16 complete all as specified and as directed.
Material and labour for preparation of new steel surfaces of any description over 10cm width or girth and applying two coats of synthetic enamel paint over a coat of zinc chrome primer complete all as specified and as directed.
Dismantling Fibre glass reinforced translucent corrugated sheet of any guage, thickness complete all as specified and as directed.
Material and Labour for pre-painted galvalume aluminium zinc coating gi based corrugated steel sheet 0.5mm thick of an colour having tensile strength of 550 mpa fixed with self tapping screws as in roof complete all as specified and as directed.
Supply and fixing as in replacement 15mm bore bib taps cast copper alloy chromium plated with crutch or butterfly handle, screwed down, screwed for iron pipe complete all as specified and as directed.
Supply and fixing as in replacement for 15mm bore stop valve, concealed type brass chromium plated, screwed down high pressure with crutch or butter fly handle screwed both ends fixed to GI pipe complete all as specified and as directed.
Supply and fixing as in replacememt 15mm bore chromium plated wash hand basin mixture for mixing hot or cold water screwed down for iron pipe and fixed complete all as specified and as directed.
Supply and fixing as in replacement 15mm dia of bore chromium plated wall mixture complete all as specified and as directed.
Supply and fixing as in replacement for 15mm bore Chromium Plated pillar tap fancy type cast copper alloy, with capstan heads screwed down high pressure, with or without lettered 'Hot' or 'Cold' with long screwed shanks and fly-nuts, screwed for iron pipe complete all as specified and as directed.
Writing letters or figures (Block, Roman, Italic or Indian) n.exc 30 cm high complete all as specified and as directed.
DIPAK ENTERPRISE
KWALITY CONSTRUCTION
NUPUR CONSTRUCTION
SUDHA ENTERPRISES
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .