Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance GRAM PO BODIYA RAMGARH DISTRICT DUMKA | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance BANJHI BAZAR PS BORIO DIST SAHIBGANJ | GODDA | JHARKHAND | 813208 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | Admitted-Fee/PreQual/Technical/Finance AT BHADARIA RAJABHGITHA GODDA | GODDA | GODDA | JHARKHAND | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹23.9 L
EMD Value
₹48,000
Closing Date
30 Mar 2026, 5:00 pmClosed
EXECUTIVE ENGINER, N.R.E.P, GODDA
1ST FLOOR OF RD Spl DIVISION OFFICE Office of the Executive Engineer, National Rural Employment Programme, Godda
Construction of Boundary wall Drinking Water Facility Toilet and Poshan Vatika at PS TESOBATHAN UMS GP TILABAD UNDER BLOCK SUNDERPAHARI District Godda
2026_NRGOD_111895_1
N.R.E.P,Godda/12/2025-26
Open Tender
Civil Works
Percentage
180 days
N.R.E.P GODDA
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
Yes
₹48,000
Yes
1 Apr 2026
23 Mar 2026
1 Apr 2026
23 Mar 2026
30 Mar 2026
23 Mar 2026
23 Mar 2026 - 30 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in excavation in foundation trenches in ordinary soil ( vide classification of soil item A) and disposal of excavated earth as obtained to a distance upto 50M including all lifts leveling ramming the foundation treanches, removing roots of trees, and shrubs all complete as per approved design, building specification and direction of E/I. | |||||
| 2Providing coarse clean sand in filling in in foundation trenches or in plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts including cost of all materials labour, royalty and taxes all complete as per building specification and direction of E/I (Mode of measurement compacted volume) | |||||
| 3Supplying all materials, Labours, tools & doing 75 B, one brick flat soiling (70 mm) in foundation trenches joints filled with local sand as per specification & direction of E/I. | |||||
| 4Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:2:4 (1 Cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) | |||||
| 5Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 Cement : 1.5 Coarce sand (zone-III) : 3 Graded stone aggregate 20 mm nominal size) | |||||
| 6Reinforcement cement concrete work in beams, suspended floors, roofs having slope up to 15 degree landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircase and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 Cement : 1.5 Coarce sand (zone-III) : 3 Graded stone aggregate 20 mm nominal size): At Lintel Band | |||||
| 7Reinforcement cement concrete work in walls (any thickness), including attached pilasters, buttersses, plinth and string cource, filleets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 Cement : 1.5 Coarce sand (zone-III) : 3 Graded stone aggregate 20 mm nominal size): At Column upto Ground Floor | |||||
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete | 1 | SQM | - | - |
| 9Centering and shuttering including strutting, propping etc. and removal of form for Lintels, beams, plinth beams, girders, bressumers and cantilevers | |||||
| 10Centering and shuttering including strutting, propping etc. and removal of form for Columns, Pillars, Piers, Abutments, Posts and Struts | |||||
stage.html
html • 0.03 MB
finance_151093.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.77 MB
Tenderpaper.pdf
Tender Documents • 7.29 MB
BOQ_151093.xls
BOQ • 0.37 MB
F212Signed.pdf
PDF • 0.43 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .