Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹22.6 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹23.9 L+₹1.3 L (5.66%)Admitted-Finance 0 BAANGAD WALTERGANJ BASTI BASTI UTTAR PRADESH 272182 | BASTI | UTTAR PRADESH | 272182 | L2 | Admitted-Finance | |
| 3 | Rejected-Technical | - | Rejected-Technical NOT OK |
| Sl No | Description | Qty | Unit | M/S CHAUDHARY CONSTRUCTION COMPANY L2 | M/S BABA ENTERPRISES L1 |
|---|---|---|---|---|---|
| 1.10WORK UNDER EDD-GRAMIN, BASTI (GST Extra) | |||||
| 2.00 | Safe Loading carraige & Unloading of PCC Poles from store Basti to work site Ahra to Bankati under EDD-Gramin Basti | 375 | No | 2,25,000 ₹2,25,000 | 2,06,250 ₹2,06,250 Lowest |
| 3.00 | Safe Loading carraige & Unloading of Remaining ACSR Weasal Coductor HT/LT 10 KM Other Associated Material from store Basti to work site Ahra to Bankati under EDD-Gramin Basti | 1 | Job | 20,000 ₹20,000 | 18,000 ₹18,000 Lowest |
| 4.00 | Safe Loading carraige & Unloading of Remaining ABC Cable 3x95 Sq mm.( 10.424 KM) & Other Associated Material from store Basti to work site Ahra to Bankati under EDD-Gramin Basti | 1 | Job | 25,000 ₹25,000 | 23,000 ₹23,000 Lowest |
| 5.00 | Laying, Stringing, Tensioning & Binding of New wesal Conduter for HT/LT (10 KM.) Overhead Line at work site Ahra to Bankati under EDD-Gramin Basti | 10 | KM | 50,000 ₹50,000 | 45,000 ₹45,000 Lowest |
| 6.00 | Laying, stringng & Tighting of ABC Cable3x95 Sq mm.( 10.424KM) & Other Associated Material at work site Ahra to Bankati under EDD-Gramin Basti | 10 | Km | 60,000 ₹60,000 | 55,000 ₹55,000 Lowest |
| 7.00 | Errection of Single PCC Pole with all fitting at work siteAhra to Bankati under EDD-Gramin Basti | 343 | No | 2,74,400 ₹2,74,400 | 2,57,250 ₹2,57,250 Lowest |
| 8.00 | Errection of DP PCC Pole with all fitting at work site Ahra to Bankati under EDD-Gramin Basti | 16 | No | 24,000 ₹24,000 Lowest | 24,000 ₹24,000 Lowest |
| 9.00 | Grouting of PCC Pole with Cement Bricks Ballast & coarse sand as per standerd specifications | 375 | No | 3,21,000 ₹3,21,000 | 3,00,000 ₹3,00,000 Lowest |
| 10.00 | Fixing, Binding & Tighitng of Stay | 118 | No | 17,700 ₹17,700 | 15,340 ₹15,340 Lowest |
Tender Value
Refer Docs
EMD Value
₹24,000
Closing Date
24 Sept 2025, 2:00 pmClosed
SE EDC BASTI
SE EDC BASTI
HT LT Line Shifting Work under Deposit Head 2025 26 under EDD GRAMIN Basti
2025_PVVNV_1065379_3
28/EDC(B)/2025-26
Open Tender
Electrical Works
Lump-sum
BASTI
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,540
SE EDC
₹24,000
30 Sept 2025
9 Sept 2025
25 Sept 2025
9 Sept 2025
24 Sept 2025
9 Sept 2025
WORK UNDER EDD-GRAMIN, BASTI (GST Extra)
Safe Loading carraige & Unloading of PCC Poles from store Basti to work site Ahra to Bankati under EDD-Gramin Basti
Safe Loading carraige & Unloading of Remaining ACSR Weasal Coductor HT/LT 10 KM Other Associated Material from store Basti to work site Ahra to Bankati under EDD-Gramin Basti
Safe Loading carraige & Unloading of Remaining ABC Cable 3x95 Sq mm.( 10.424 KM) & Other Associated Material from store Basti to work site Ahra to Bankati under EDD-Gramin Basti
Laying, Stringing, Tensioning & Binding of New wesal Conduter for HT/LT (10 KM.) Overhead Line at work site Ahra to Bankati under EDD-Gramin Basti
Laying, stringng & Tighting of ABC Cable3x95 Sq mm.( 10.424KM) & Other Associated Material at work site Ahra to Bankati under EDD-Gramin Basti
Errection of Single PCC Pole with all fitting at work siteAhra to Bankati under EDD-Gramin Basti
Errection of DP PCC Pole with all fitting at work site Ahra to Bankati under EDD-Gramin Basti
Grouting of PCC Pole with Cement Bricks Ballast & coarse sand as per standerd specifications
Fixing, Binding & Tighitng of Stay
Dismentaling Charge Old &Used Single PCC&ST Pole
Dismentaling Charge Old &Used Double PCC&ST Pole
Unmounting, Shifting & Mounting Charge of TF 100 KVA
Unmounting, Shifting & Mounting Charge of TF 63 KVA
Unmounting, Shifting & Mounting Charge of TF 25 KVA
Unmounting, Shifting & Mounting Charge of TF 10 KVA
Plinth with Fencing Work for 250 kVA TF
HT/LT Tree Branchess Cutting of work at site
HT/LT O&U/Scrab Material Cortage Charges From Site to Store Basti
Decentralized Materials
Supply & Installation of Guarding Angle
Spply of LT Clamp
Supply of Danger Board
Supply of Birbed Wire
supply of LT Shackle Insulator
Grouting of Stay
Cross Arm Holding Clamp
MS Nut & Bolt Various Size for HT/LT line
T-off/Top/Dropper Channel Clamp for HT line
Supply of Gaurding Angle Clamp
Garding Wire
Supply of F-Braket for HT Line
M/S CHAUDHARY CONSTRUCTION COMPANY (BID ID -5555388)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .