Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹47.9 LAccepted-AOC | L1 | Accepted-AOC Accepted | |
| 2 | L2₹55.1 L+₹14,782.87 (0.27%)Rejected-Finance | L2 | Rejected-Finance Above Estimate Rate |
Tender Value
₹49.9 L
EMD Value
₹50,000
Closing Date
3 May 2023, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Project Director
Project Director, DRDA SIVAGANGAI
Renewal of Sarugani-Devakottai Road To Sengarkoil
2023_RDTN_300762_1
MGSMT_DVK_SVG DT_Pack_04
Open Tender
Civil Works - Roads
Item Rate
180 days
SIVAGANGAI
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹50,000
DRDA SIVAGANGAI
13 Jul 2023
15 Apr 2023
3 May 2023
15 Apr 2023
3 May 2023
15 Apr 2023
17 Apr 2023
Amount
Clearing Scrub Jungle without alignment for the widening of the formation of the road cutting of trace up to 30mm girth products the cleaning are to be stocked in such a place as ordered by the departmental officer and the ground shall be left in a perfectly clean condition. All holes of hollows whether original, existing (or) produced by digging of roots shall than be carefully filled up the earth well rammed and leveled of and the entire work completed in all respect as per SI 17 (2).
Earth work excavation and depositing on bank with an intial of 10m and lift 2m in hard stiff clay, stiff black cotton, hard red earth and earth mixed with small size boulders, hard gravelly soil etc., as per SS 20A including laying and spreading in layer etc.complete.
Providing and Laying Gravel Soling to Compacted thick including cost and conveyance of gravel from approved sources to work site including labour for Spreading ,water and Compacting by power roller to achieve the required
Proviging and laying WBM patch work using 1 cum of 45mm IRC HBG metal and 0.33cum gravel for blindagefor including cost and conveyance of all materials from approved quarry
Advance patch Work for making up the undulation in the existing B.T Surface to an average thickness of 25mm using 13.20mm IRC Size HBG metal
Applying tack Coat over WBM Surface (not treated with primer)using 4kg of Bituminous Emulsion Per 10 Sqm including Cost and bituminous emulsion which will be recovered at the rates as per special Conditions appended here with including conveyance
Applying tack Coat over BTSurface (not treated with primer)using 3kg of Bituminous Emulsion Per 10 Sqm including Cost and bituminous emulsion which will be recovered at the rates as per special Conditions appended here with including conveyance
Providing and laying Bituminous concrete 25mm thick using 0.13cum of 19.00-9.50mm.0.17cum of 9.5-2.36 and below with 50.30kgs of VG30/VG40m heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot
Kilo metre Stone
Provision for Hectametre stone of size 0.75mx0.23mx0.10m
Provision For Mandatory Sign Boards
Provision For Cautionary Sign Boards
Road Marking With Hot applied Thermoplastic Compound with Reflectorising glass beads on bitumen Surface
Maintenance of the road
Towards the charges for routline maintenance of the road work executed under MGSMT including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRCSP- 20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost
For the First Year from the date of completion of work
For the Second Year from the date of completion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
KANNAN AND CO
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .