Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.2 LAccepted-AOC 205L MODEL TOWN LUDHIANA | LUDHIANA | LUDHIANA | PUNJAB | L1 | Accepted-AOC L1 Contractor | |
| 2 | L2₹19.5 L+₹29,491.22 (1.53%)Rejected-Finance | L2 | Rejected-Finance L2 Contractor | |
| 3 | L3₹20.7 L+₹1.5 L (7.65%)Rejected-Finance MOH 263 CIVIL LINES PS KOTWALI NAGAR GONDA | GONDA | UTTAR PRADESH | 271001 | L3 | Rejected-Finance L3 Contractor | |
| 4 | L4₹21.4 L+₹2.2 L (11.2%)Rejected-Finance | L4 | Rejected-Finance L4 Contractor |
Tender Value
₹22.2 L
EMD Value
₹45,000
Closing Date
8 Oct 2024, 1:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE SNK-7. Bahraich
EE SNK-7 Kalpipara Colony, Bahraich
pucca works
2024_UPIDC_956667_31
02/EE/2024-25
Open Tender
Civil Works - Canal
Item Rate
120 days
Block Harraiya Satgharwa, Balrampur
Please refer Tender documents.
2 documents required · 2 mandatory
₹854
₹45,000
3 Dec 2024
30 Sept 2024
8 Oct 2024
30 Sept 2024
8 Oct 2024
30 Sept 2024
Amount
E/W in embankment in making road diversion in all type of soil including all taxes all leads, lifts with proper dressing & manual compaction required for proper completion of work but excluding G.S.T.
E/W in digging foundation in all type of soil including all taxes, all lead, lift and backfilling and disposal of surplus earth required for proper completion of work as per direction of engineer in charge but excluding G.S.T.
Laying Plain cement concrete in M10 mix (1:3:6) in foundation with 4.75 to 40 mm size Kabrai stone ballast & Coarse sand having F.M. not less than 2.0 including all taxes, mechanical vibration, all material, labour & T&P. required for proper completion of work but excluding G.S.T.
Ist class brick work in 1:4 C.M. with coarse sand of F.M. not less than 2.0 including all taxes cost of all material, labour and T&P. required for proper completion of work but excluding G.S.T.
Laying R.C.C. 1:1½ :3 using 4.75 mm to 20 mm size crushed Kabarai stone grit with Hamirpur coarse sand having F.M not less than 2.0 including all taxes, mechanical vibration, cost of all material, labour and T&P required for proper completion of work but excluding GST.
Centering & shuttering for R.C.C work (span upto 3 m) including all taxes, cost of all material, labour and T&P etc.required for proper completion of work but excluding GST.
S/F 20 mm thick Joint filler board in construction joint including all taxes, cost of all material, labour and T&P. etc. required for proper completion of work but excluding GST.
Centering & shuttering for C.C work including all taxes, cost of all material, labour and T&P etc.required for proper completion of work but excluding GST.
Deep struck Cement Pointing in 1:2 CM with fine coarse sand including all taxes, cost of all material, labour & T&P. required for proper completion of work but excluding G.S.T.
Cutting, bending, binding & placing of Steel reinforcement in proper position including all taxes, cost of all taxes, binding wire, steel labour and T&P etc. required for proper completion of work but excluding GST.
Double Flat Brick Pitching with Ist Class Brick in 1:3 C.M.with 8mm thick sandwitched plaster and Hamirrpur coarse sand having F.M Not less than 2.0 including all taxes, Prppation of Subgrade, Filling Joints ,cost of all material, labour and T&P etc. required for proper completion of work but excluding GST.
E/W in embankment in making ramp in all type of soil including all leads, lifts with proper dressing & manual compaction for proper completion of work including all taxes but excluding G.S.T.
Supplying and laying graded filter including all taxes, cost of all material, labour and T&P etc required for proper completion of work but excluding GST. (a) Coarse Sand
(b) 4.75 to 20 mm natural shingle
(c) 20 to 40mm natural shingle
S/F Wheel guard stone including cost of all material, labour & T&P. by manufacturing at site including all taxes, cost of all material, labour and T&P etc.required for proper completion of work but excluding GST.
S.O.B. brick on edge soling including all taxes, preperation of subgrade and filling joints with local sand/earth with cost of all material, labour and T&P etc. required for proper completion of work but excluding G.S.T.
Pucca road cutting including all taxes, cost of all material, labour and T&P etc.required for proper completion of work but excluding GST.
Supplying and Laying tarfelt in two layers including all taxes, cost of all material, labour and T&P etc.required for proper completion of work but excluding GST.
E/w correcting canal section including all taxes, all lead, lift and dressing to profile with manual compaction required for proper completion of work but excluding G.S.T
E/W removal of road diversion in all type of soil including all taxes, all leads, lifts with proper dressing & manual compaction required for proper completion of work but excluding GST.
Dismentling of S.O.B. brick on edge soling including all taxes, cost of all material, labour and T&P etc. required for proper completion of work but excluding G.S.T.
Relaying of S.O.B. brick on edge soling including all taxes, preperation of subgrade, filling joints with local sand/earth with cost of all material, labour and T&P etc. required for proper completion of work but excluding G.S.T.
M/S P.K ENTERPRISES
Chandra Kamal Pandey
SRI RAM PRAKASH SINGH
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .