Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹46.4 LAccepted-AOC B 52 CORPORATE HOUSE JUDGES BUNGLOW ROAD BODAKDEV AHMEDABAD GUJARAT 380015 | AHMADABAD | GUJARAT | 380015 | ₹46.4 L Quoted ₹54.8 L | L1 | Accepted-AOC L1 |
| 2 | L2₹61.5 L+₹6.7 L (12.2%)Rejected-AOC OLYMPIA PLATINA PLOT NO 33B SOUTH PHASE GUINDY CHENNAI 600032 | CHENNAI | CHENNAI | TAMIL NADU | 600032 | ₹61.5 L+₹6.7 L (12.2%) | L2 | Rejected-AOC Not L1 |
| 3 | L3₹1.1 Cr+₹52.0 L (95.0%)Rejected-AOC | ₹1.1 Cr+₹52.0 L (95.0%) | L3 | Rejected-AOC Not L1 |
| Sl No | Description | Qty | Unit | Green Engineers L3 | Hitachi Hirel Power Electronics Private Limited L1 | VERTIV ENERGY PRIVATE LIMITED L2 |
|---|---|---|---|---|---|---|
| 10.00SUPPLY OF 130 KVA UPS AS PER SOW | ||||||
| 10.00 | Supply of Material | 1 | SET | 72,45,000 ₹85,49,100 | 37,53,830 ₹44,29,519.4 Lowest | 40,60,000 ₹47,90,800 |
| 20.00Installation & commissioning as per SOW | ||||||
| 20.00 | UPS Erection & Commissioning for Unit-3 | 1 | NO | 1,72,500 ₹2,03,550 | 1,36,200 ₹1,60,716 Lowest | 2,10,000 ₹2,47,800 |
| 30.00Comprehensive AMC 03 YEARS as per SOW | ||||||
| 30.00 | Comprehensive AMC Year - 1 as per SOW | 1 | NO | 4,93,500 ₹5,82,330 | 2,25,000 ₹2,65,500 Lowest | 2,96,700 ₹3,50,106 |
| 30.00 | Comprehensive AMC Year - 2 as per SOW | 1 | NO | 5,42,000 ₹6,39,560 | 2,25,000 ₹2,65,500 Lowest | 3,11,500 ₹3,67,570 |
| 30.00 | Comprehensive AMC Year - 3 as per SOW | 1 | NO | 5,96,950 ₹7,04,401 | 3,00,000 ₹3,54,000 Lowest | 3,30,200 ₹3,89,636 |
Tender Value
Refer Docs
EMD Value
₹1 L
Closing Date
23 Apr 2026, 10:00 amClosed
SR. MANAGER(USSC CnM)
USSC CPG Grp2,CBD building 9th floor, Nawa Raipur 492101
400053893 Supply, installation, Commissioning and 03-years CAMC for 130KVA UPS (Stage-1) at NTPC Mouda.
2026_NTPC_107177_1
NTPC/USSC-CPG2/9900323564
Limited
Miscellaneous Works
Works
1825 days
Mouda Super Thermal Power Project
1 document required · 1 mandatory
₹0
₹1 L
23 Jul 2026
15 Apr 2026
24 Apr 2026
15 Apr 2026
23 Apr 2026
15 Apr 2026
15 Apr 2026 - 17 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 10SUPPLY OF 130 KVA UPS AS PER SOW | |||||
| 10.0001 | Supply of Material | - | SET | - | - |
| 20Installation & commissioning as per SOW | |||||
| 20.0001 | UPS Erection & Commissioning for Unit-3 | - | NO | - | - |
| 30Comprehensive AMC 03 YEARS as per SOW | |||||
| 30.0001 | Comprehensive AMC Year - 1 as per SOW | - | NO | - | - |
| 30.0002 | Comprehensive AMC Year - 2 as per SOW | - | NO | - | - |
| 30.0003 | Comprehensive AMC Year - 3 as per SOW | - | NO | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.97 MB
TD_400053893.rar
Tender Documents • 19.11 MB
BOQ_110413.xls
BOQ • 0.31 MB
Date_corrigendum.pdf
PDF • 0.01 MB
BODext.pdf
PDF • 0.40 MB
Date_corrigendum.pdf
PDF • 0.01 MB
Date_corrigendum.pdf
PDF • 0.01 MB
Date_corrigendum.pdf
PDF • 0.01 MB
Date_corrigendum.pdf
PDF • 0.01 MB
BOD_Ext.pdf
PDF • 0.08 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .