| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.9 LAccepted-AOC | ₹11.9 L | L1 | Accepted-AOC LER |
| 2 | L2₹12.2 LRejected-Finance | ₹12.2 L | L2 | Rejected-Finance AER |
| Sl No | Description | Qty | Unit | Arivazhagan R L2 | OVIYA CONSTRUCTIONS L1 |
|---|---|---|---|---|---|
| 1.00Detailed Project Report for the work of Upgradation of Mangalam Kilpalanandhal Road to MGR Nagar Road in Mangalam Panchayat (R124) | |||||
| 1.01 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp. | 696 | Sq.m | 3.5 ₹2,436 | 3.1 ₹2,157.60 |
| 1.02 | Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water and other item which may be necessary or convenient to the succesful completion of the excavation in a compacted condition a quality of materials not exceeding the amount of excavation including all machinery charges for T&P employed etc., complete for cutting side drains and forming berms as per standard specifications. | 313.2 | Cu.m | 78.5 ₹24,586.20 | 67.8 ₹21,234.96 |
| 1.03 | Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) | 130 | Cu.m | 1,270.5 ₹1.7 L | 1,270.5 ₹1.7 L |
| 1.21 | Providing and laying including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content and hire fuel charges for powerroller, watersprinkler and all other incidental charges such as traffic barricading and providing dangerlights etc. comp for base-course and side berms | 78.3 | Cu.m | 249.5 ₹19,535.85 | 249.5 ₹19,535.85 |
| 1.22 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | 174 | Cu.m | 1,773.4 ₹3.1 L | 1,773.4 ₹3.1 L |
| 1.23 | Applying tack coat over Un Primed WMB/ WMM surface at 7Kg of SS-1 per 10 Sqm. area including cost of bituminous binder at the site including labour charges for preparing the surface and applying the required quantity of bituminous binder as tack coat including hire charges and fuel charges for bitumen boiler and all other tools and plants employed etc., complete as per clause 503 of MOST specification. | 1,740 | Sq.m | 68.4 ₹1.2 L | 63.4 ₹1.1 L |
| 1.24 | Applying tack coat over Un Primed WMB/ WMM surface at 2.5Kg / 10 Sqm. area including cost of bituminous binder at the site including labour charges for preparing the surface and applying the required quantity of bituminous binder as tack coat including hire charges and fuel charges for bitumen boiler and all other tools and plants employed etc., complete as per clause 503 of MOST specification. | 1,740 | Sq.m | 16.4 ₹28,536 | 12.4 ₹21,576 |
| 1.31 | Providing and laying Premix Carpet with Seal Coat Type -A to 20mm thick using 0.18cum of 13.2mm, 0.09 cum of 11.20mm and .09cum of 6.70mm with 24.40 Kgs of VG 30 Bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in Central Hot Mix Plant 20-30T capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 20mm with mechanical paver to the specified grades and cross section and consolidated by 8-10T vibratory/pneumatic roller to the required density etc., including labour for attending to paver to site, hire & fuel charges for 20-30T CMP with bitumen boiler, tipper trucks, paver finisher, vibratory/pneumatic roller and all other tools and plants required, including fuel and other incidental charges etc., complete | 1,740 | Cu.m | 208.3 ₹3.6 L | 208.3 ₹3.6 L |
| 1.32 | Providing HM stones (0.75*0.23*0.10) | 2 | Sq.m | 208 ₹416 | 208 ₹416 |
Tender Value
₹12.2 L
EMD Value
₹1,218
Closing Date
3 Mar 2023, 1:00 pmClosed
The Panchayat President Palanandal
The Panchayat President Palanandal Panchayat
Detailed Project Report for the work of Upgradation of Mangalam Kilpalanandhal Road to MGR Nagar Road in Mangalam Panchayat (R124)
2023_RDTN_290738_1
Roc. No. A11/11075/2018 Dt.08.11.2018
Open Tender
Civil Works - Roads
90 days
The Panchayat President Palanandal
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹1,218
Yes
26 Mar 2026
25 Feb 2023
3 Mar 2023
25 Feb 2023
3 Mar 2023
25 Feb 2023
Amount
Detailed Project Report for the work of Upgradation of Mangalam Kilpalanandhal Road to MGR Nagar Road in Mangalam Panchayat (R124)
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp.
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water and other item which may be necessary or convenient to the succesful completion of the excavation in a compacted condition a quality of materials not exceeding the amount of excavation including all machinery charges for T&P employed etc., complete for cutting side drains and forming berms as per standard specifications.
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method)
Providing and laying including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content and hire fuel charges for powerroller, watersprinkler and all other incidental charges such as traffic barricading and providing dangerlights etc. comp for base-course and side berms
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Applying tack coat over Un Primed WMB/ WMM surface at 7Kg of SS-1 per 10 Sqm. area including cost of bituminous binder at the site including labour charges for preparing the surface and applying the required quantity of bituminous binder as tack coat including hire charges and fuel charges for bitumen boiler and all other tools and plants employed etc., complete as per clause 503 of MOST specification.
Applying tack coat over Un Primed WMB/ WMM surface at 2.5Kg / 10 Sqm. area including cost of bituminous binder at the site including labour charges for preparing the surface and applying the required quantity of bituminous binder as tack coat including hire charges and fuel charges for bitumen boiler and all other tools and plants employed etc., complete as per clause 503 of MOST specification.
Providing and laying Premix Carpet with Seal Coat Type -A to 20mm thick using 0.18cum of 13.2mm, 0.09 cum of 11.20mm and .09cum of 6.70mm with 24.40 Kgs of VG 30 Bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in Central Hot Mix Plant 20-30T capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 20mm with mechanical paver to the specified grades and cross section and consolidated by 8-10T vibratory/pneumatic roller to the required density etc., including labour for attending to paver to site, hire & fuel charges for 20-30T CMP with bitumen boiler, tipper trucks, paver finisher, vibratory/pneumatic roller and all other tools and plants required, including fuel and other incidental charges etc., complete
Providing HM stones (0.75*0.23*0.10)
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Arivazhagan R
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tenderdocument.pdf
Tender Documents • 0.57 MB
BOQ_345310.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid