Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.2 CrAdmitted-Finance | ₹4.2 Cr | L1 | Admitted-Finance |
| 2 | L2₹4.4 Cr+₹15.1 L (3.57%)Admitted-Finance | ₹4.4 Cr+₹15.1 L (3.57%) | L2 | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical 53 VAISHAILI ENCLAVE SECTOR 9 INDIRA NAGAR LUCKNOW | LUCKNOW | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | AMIT ENGINEERING CORPORATION L2 | KHAN ENTERPRISES L1 |
|---|---|---|---|---|---|
| 1.00SUPPLY | |||||
| 1.01 | Supply of 33 KV control penal | 1 | Nos. | 2,00,000 ₹2,00,000 Lowest | 5,00,000 ₹5,00,000 |
| 1.02 | Supply of 11 kv VCB outgoing (400/200/5A.) | 2 | Nos. | 4,72,000 ₹9,44,000 Lowest | 6,00,000 ₹12,00,000 |
| 1.03 | Supply of Battery Charger 24 volt | 1 | Nos. | 1,00,000 ₹1,00,000 Lowest | 1,25,000 ₹1,25,000 |
| 1.04 | Supply of Battery set | 1 | Nos. | 81,250 ₹81,250 | 30,000 ₹30,000 Lowest |
| 1.05 | Supply of 11 kv ct for vcb 600/300/5A set | 1 | Nos. | 5,16,250 ₹5,16,250 | 50,000 ₹50,000 Lowest |
| 1.06 | Supply of 11 kv ct for vcb 400/200/5A set | 6 | Nos. | 4,72,000 ₹28,32,000 | 50,000 ₹3,00,000 Lowest |
| 1.07 | Supply of 33 kv Post insulator set | 3 | Nos. | 1,250 ₹3,750 Lowest | 2,000 ₹6,000 |
| 1.08 | Supply of Control cable 4x2.5 sqmm. | 200 | Mtrs. | 225 ₹45,000 Lowest | 300 ₹60,000 |
| 1.09 | Supply of Control cable 2x2.5 sqmm. | 200 | Mtrs. | 145 ₹29,000 Lowest | 300 ₹60,000 |
Tender Value
₹5.2 Cr
EMD Value
₹5.5 L
Closing Date
31 Mar 2023, 4:00 pmClosed
SE EUDC ALIGARH
LAL DIGGI ALIGARH
various electric works on Turn-key Basis for electrification and strengthening of Infrastructure due to extension of Nagar Nigam area EUDD-3 Aligarh
2023_DVVNL_788099_2
EUDCA-90/2022-23
Open Tender
Electrical Works
Turn-key
90 days
EUDD-3 ALIGARH
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,900
DVVNL
₹5.5 L
1 Apr 2023
26 Mar 2023
31 Mar 2023
26 Mar 2023
31 Mar 2023
26 Mar 2023
Amount
SUPPLY
Supply of 33 KV control penal
Supply of 11 kv VCB outgoing (400/200/5A.)
Supply of Battery Charger 24 volt
Supply of Battery set
Supply of 11 kv ct for vcb 600/300/5A set
Supply of 11 kv ct for vcb 400/200/5A set
Supply of 33 kv Post insulator set
Supply of Control cable 4x2.5 sqmm.
Supply of Control cable 2x2.5 sqmm.
Supply of 11 Mtrs. Long ST Pole IS 410 SP-55
Supply of 09 Mtrs. Long ST Pole
Supply of 8.5 Mtrs. Long PCC Pole
Supply of Stone Pad
Supply of ABC connector
Supply of suspension clamp with eye hook
Supply of Dead End Clamp with eye
Supply of Distritbution Box
Supply of Earthing Complete for ST Pole
Supply of Stay complete (GI Stay Rod 16x1800mm, 5 Kgs. Stay wire 7/8, Stay clamps, Bolts, Nuts & Washers)
Supply of 11 KV XLPE Cable size 3*70 Sq.mm.
Supply of 11 KV XLPE Cable size 3*185 Sq.mm.
Supply of 33 KV XLPE Cable size 3*300 Sq.mm.
Supply of ACSR Dog Conductor
Supply of Heat Shrinkable Jointing Kit for 11 KV XLPE 3x70 Sq.mm. Cable Outdoor Type
Supply of Heat Shrinkable Jointing Kit for 11 KV XLPE 3x185 Sq.mm. Cable Outdoor Type
Supply of Heat Shrinkable Jointing Kit for 33 KV XLPE 3x300 Sq.mm. Cable Outdoor Type
Supply of L.T. Aeirel Bunch Cable size 3x95+1x35+1x16 sq.mm.
Supply of L.T. Aeirel Bunch Cable size 3x120+1x95+1x16 sq.mm.
Supply of 100 KVA Distribuition Transoformer
Supply of 250 KVA Distribuition Transoformer
Supply of 11 KV D.O. Fuse Set
Supply of 11 KV TPMO
Supply of Al. Lugs 400Sq.mm.
Supply of 11 KV Pin Insulator with pin
Supply of 11 KV Disc Insulator with fitting
Supply of M.S. Top Channel size 125x65x6 mm, 2240 mm. long with clamp
Supply of M.S. Dropper Channel size 100x50x2028 mm.
Supply of M.S. Base Angle size 75x75x6mm., 2028 mm. long with clamp for T/F Base
Supply of M.S. T-off Channel size 125x65x6 mm, 2240 mm. long with clamp
Supply of F-Braket with clamp
Supply of Clamps for Pole
Supply Danger Board with clamp
Supply of L.T. PVC cable 3.5x150 Sq.mm.
Supply of L.T. PVC cable 3.5x400 Sq.mm.
Supply of L.T. Incoming Panel with metering equipment
Supply of 33 KV Lightening Arrestor
ERECTION
Erection of Single Support by 11 Mtrs. ST pole including the cost of labour, T&P and carrier etc. required for proper completion of work. The support shall be grouted with cement, sand & brick ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast etc. as per RESSPO Manual
Erection of Single Support by 09 Mtrs. ST pole including the cost of labour, T&P and carrier etc. required for proper completion of work. The support shall be grouted with cement, sand & brick ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast etc. as per RESSPO Manual
Erection of Single Support by 8.5 Mtrs. PCC pole including the cost of labour, T&P and carrier etc. required for proper completion of work. The support shall be grouted with cement, sand & brick ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast etc. as per RESSPO Manual
Erection of Double Pole Structure by 11 Mtrs. ST pole including the cost of labour, T&P and carrier etc. required for proper completion of work. The support shall be grouted with cement, sand & brick ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast etc. as per RESSPO Manual
Laying of 33 KV XLPE Cable 3x300 Sq.mm. including making proper connections at both ends. The work includes the cost of labour, T&P and carrier etc. required for proper completion of work.
Laying of 11 KV XLPE Cable 3x185 Sq.mm. including making proper connections at both ends. The work includes the cost of labour, T&P and carrier etc. required for proper completion of work.
Laying of 11 KV XLPE Cable 3x70 Sq.mm. including making proper connectionst both ends. The work includes the cost of labour, T&P and carrier etc. required for proper completion of work.
Laying spreading, lifting and final sagging of Aerial Bunched Cable size 3x120+1x95+1x16 sq.mm. including fixing of all accessories as per RESSPO Manual and as per direction of supervising engineer, including the cost of arrangement of labour, T&P carrier etc. required for proper completion of work. :
Laying of LT PVC Cable 3.5x150 Sq.mm. including making proper connections at both ends. The work includes the cost of labour, T&P and carrier etc. required for proper completion of work.
Laying of LT PVC Cable 3.5x400 Sq.mm. including making proper connections at both ends. The work includes the cost of labour, T&P and carrier etc. required for proper completion of work.
Laying sagging stringing and jumpering of ACSR Dog Conductor on the newly erected pole as per RESPO manual and as per direction of supervising engineer, including the cost of arrangement of labour, T&P carrier etc. required for proper completion of work.
Fixing & connecting of earthing rods as per RESSPO Manual including the cost of labour, T&P etc. required for proper completion of work.
Erection and grouting of stay set including the work of nozzling etc. as per RESPO manual and also including the cost of arrangement of all grouting material, labour, T&P etc. required for proper completion of work as per RESSPO Manual.
Filling of Heat Shrinkable Jointing Kit for 33 KV XLPE 3x300 Sq.mm. Cable Indoor / Outdoor Type as per RESSPO Norms.
Filling of Heat Shrinkable Jointing Kit for 11 KV XLPE 3x185 Sq.mm. Cable Indoor / Outdoor Type as per RESSPO Norms.
Filling of Heat Shrinkable Jointing Kit for 11 KV XLPE 3x70 Sq.mm. Cable Indoor / Outdoor Type as per RESSPO Norms.
Installation of 33 KV control penal
Installation of 11 kv VCB outgoing (400/200/5A.)
Installation of Battery Charger 24 volt
Installation of Battery set
Fixing of 11 kv ct for vcb 600/300/5A set
Fixing of 11 kv ct for vcb 400/200/5A set
Fixing of 33 kv Post insulator set
Laying of Control cable 4x2.5 sqmm.
Laying of Control cable 2x2.5 sqmm.
Painting of Double Pole Structure of ST Pole in two coats of red oxide and two coats of silver paint with bottom 6 feet by fluorescent paint in strips.
Painting of Single Pole Structure of ST Pole in two coats of red oxide and two coats of silver paint with bottom 6 feet by fluorescent paint in strips.
Erection of Pin Insulator with Pin & Nuts, 11 KV
Erection of Disc Insulator with fittings, 11 KV
Erection of Danger board with Nuts & bolts and clamps
Erection of M.S. Top Channel size 125x65x6 mm, 2240 mm. long with clamp
Erection of M.S. Dropper Channel size 100x50x2028 mm.
Erection of M.S. Base Angle size 75x75x6mm., 2028 mm. long with clamp for T/F Base
Erection of M.S. T-off Channel size 125x65x6 mm, 2240 mm. long with clamp
Erection of F-Braket with clamp
Neutral & body earthing of 11/0.4 KV Sub-stations installed by digging of pit upto water level depth (approx. 125 feet) and then inserting 1-¼” dia GI pipe of ‘A’ grade, conforming to the requirement of IS specification and then connecting the top of the inserted pipe and transformer body through GI strip of size 40x6 mm with the help of nut and bolt or through gas welding, as per direction of supervising engineer. It includes the cost of all material labour, T&P, carrier etc. required for proper completion of work. The aforesaid work shall be carried out as per RESSPO norms.
Erection of Stone Pad
Erection of Peircing Connector
Erection of H.T./L.T. Clamps with Nuts & Bolts
Erection of Eye-hook with suspension clamps
Erection of 11 KV TPMO
Erection of 11 KV DO Fuse Set
Installation of L.T. Incoming Panel with metering equipment
Installation of 33 KV Lightening Arrestor
Fixing of LT Distribution box including making connections of distribution box with LT mains by piercing clamps for Aerial Bunched Cable.The work will also include the opening of the service connection of the consumer and its connecting in distribution box.
Installation of 100 KVA Distribution Transformer on Double pole/ plinth including proper jumpering from 11 KV line to the transformer and also connecting the LT site cables as per RESSPO Manual.
Installation of 250 KVA Distribution Transformer on Double pole/ plinth including proper jumpering from 11 KV line to the transformer and also connecting the LT site cables as per RESSPO Manual.
After opening of HT & LT Connections, dismantalling of 10 KVA Distribution Transformer from double pole and its safe carriage from respective site to store including loading & unloading at both ends.
After opening of HT & LT Connections, dismantalling of 25 KVA Distribution Transformer from double pole and its safe carriage from respective site to store including loading & unloading at both ends.
After opening of HT & LT Connections, dismantalling of 63 KVA Distribution Transformer from double pole and its safe carriage from respective site to store including loading & unloading at both ends.
After opening of HT & LT Connections, dismantalling of 100 KVA Distribution Transformer from double pole and its safe carriage from respective site to store including loading & unloading at both ends.
Removing of 05 MVA Power Transformer from plinth to switchyard as per RESSPO Manual
Dismantling of old & used ST Poles 09 Mts. and its safe carriage from site to store as per RESSPO Norms.
Dismantling of old & used Conductor Scrap form existing line and its safe carriage from site to store as per RESSPO Norms.
AMIT ENGINEERING CORPORATION
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .