Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.5 LAccepted-AOC | ₹9.5 L | L1 | Accepted-AOC L1 |
| 2 | L2₹9.6 LRejected-Finance | ₹9.6 L | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | RAJENDRAN CONTRACTOR L1 | M MANIKANDAN CONTRACTOR L2 |
|---|---|---|---|---|---|
| 1.00PROVIDING OF PAVER BLOCK,FENCING AND GYM EQUIPMENTS OF OPEN GYM (25.00MX25.00M) AT SEVERAKOTTAI VILLAGE IN SEVERAKOTTAI PANCHAYAT | |||||
| 2.00 | Earth work excavation for pavement & drain in all soils and sub soils and to full depth as may be directed except rock requiring blasting but inclusive of shoring strutting and baling out water wherever necessary etc., complete. | 1.11 | cum | 132 ₹146.52 | 132 ₹146.52 |
| 3.00 | Cement concrete 1:4:8 (One cement four sand and eight aggregate) using 40mm gauge hard broken granite stone including all incidental charges, dewatering if found necessary etc., complete. | 0.37 | cum | 5,811 ₹2,150.07 | 5,811 ₹2,150.07 |
| 4.00 | Cement concrete 1:2:4mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete | 0.55 | cum | 7,110 ₹3,910.50 | 7,111 ₹3,911.05 |
| 5.00 | Supply and fixing of chain link fencing meter of 4“x2.1/2” size and gauge 10 including cost of labour for cutting, fixing and dying with binding wire etc., | 150 | Rm | 574 ₹86,100 | 575 ₹86,250 |
| 6.00 | Toward cost&supply of Cut stone pillar post for fensing including all labour charges etc complete | 57 | No | 334 ₹19,038 | 334 ₹19,038 |
| 7.00Paver Block | |||||
| 8.00 | Earth work excavation for pavement & drain in all soils and sub soils and to full depth as may be directed except rock requiring blasting but inclusive of shoring strutting and baling out water wherever necessary etc., complete. | 7.5 | cum | 132 ₹990 | 132 ₹990 |
| 9.00 | Cement concrete 1:4:8 (One cement four sand and eight aggregate) using 40mm gauge hard broken granite stone including all incidental charges, dewatering if found necessary etc., complete. | 3 | cum | 5,811 ₹17,433 | 5,811 ₹17,433 |
| 10.00 | Cement concrete 1:2:4mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete | 6.9 | cum | 7,110 ₹49,059 | 7,111 ₹49,065.90 |
Tender Value
₹12.6 L
EMD Value
₹12,600
Closing Date
18 Feb 2026, 3:00 pmClosed
Block Development Officer,BP
Block Development Office,Kallal
PROVIDING OF PAVER BLOCK,FENCING AND GYM EQUIPMENTS OF OPEN GYM (25.00MX25.00M) AT SEVERAKOTTAI VILLAGE IN SEVERAKOTTAI PANCHAYAT OF KALLAL PANCHAYAT UNION
2026_RDTN_656751_1
Sevarakottai/Gym
Open Tender
Civil Works - Others
Kallal
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹12,600
Yes
25 Feb 2026
13 Feb 2026
18 Feb 2026
13 Feb 2026
18 Feb 2026
13 Feb 2026
PROVIDING OF PAVER BLOCK,FENCING AND GYM EQUIPMENTS OF OPEN GYM (25.00MX25.00M) AT SEVERAKOTTAI VILLAGE IN SEVERAKOTTAI PANCHAYAT
Earth work excavation for pavement & drain in all soils and sub soils and to full depth as may be directed except rock requiring blasting but inclusive of shoring strutting and baling out water wherever necessary etc., complete.
Cement concrete 1:4:8 (One cement four sand and eight aggregate) using 40mm gauge hard broken granite stone including all incidental charges, dewatering if found necessary etc., complete.
Cement concrete 1:2:4mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Supply and fixing of chain link fencing meter of 4“x2.1/2” size and gauge 10 including cost of labour for cutting, fixing and dying with binding wire etc.,
Toward cost&supply of Cut stone pillar post for fensing including all labour charges etc complete
Paver Block
Earth work excavation for pavement & drain in all soils and sub soils and to full depth as may be directed except rock requiring blasting but inclusive of shoring strutting and baling out water wherever necessary etc., complete.
Cement concrete 1:4:8 (One cement four sand and eight aggregate) using 40mm gauge hard broken granite stone including all incidental charges, dewatering if found necessary etc., complete.
Cement concrete 1:2:4mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Supplying and erecting centering shuttering including necessary supports for plane
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers .
Flooring with Paver block with Interlocking precast cc blocks of 60 mm thickness as per standard specification
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_787588.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.63 MB
SevarakottaiGymNotice.pdf
Tender Documents • 0.61 MB
BOQ_787588.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid