Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.4 LAdmitted-Finance | -4.50% | ₹2.4 L | L1 | Admitted-Finance |
| 2 | L2₹2.5 LAdmitted-Finance | -0.60% | ₹2.5 L | L2 | Admitted-Finance |
| 3 | L3₹2.5 LAdmitted-Finance | -0.50% | ₹2.5 L | L3 | Admitted-Finance |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹2.5 L
EMD Value
₹5,040
Closing Date
9 Feb 2026, 6:00 pmClosed
Executive Engineer REW Jammu
Executive Engineer REW Jammu
Construction of Lane Drain near Ashok Kumar House, Moh. OBC w.no 3, Pyt Upper Kathar Block, Dansal under BDC Grant for the Year 2025-2026
2026_RDPR_301392_1
e-NIT No. 775- REWJ of 2025-26 dated 24-01-2026
Open Tender
Civil Works
Executive Engineer REW Jammu
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
MH 0515
₹5,040
11 Feb 2026
27 Jan 2026
10 Feb 2026
27 Jan 2026
9 Feb 2026
27 Jan 2026
Earthwork in excavation by manual means in trenches foundations, drains,pipes, cables etc(not exceeding 1.5m in width)including dressing of sides and ramming of bottom lifts upto 1.5m inc.getting out excavated earth & disposal of surplus excavated earth as directed:in all kinds of soil
P/L in position Cement conc. 1 cement:5fine sand: 10graded crushed stone agg. 40 mm excluding the cost of centring & shuttering all work upto plinth level.
P/L in position Cement conc. 1 cement:3fine sand:6graded crushed stone agg. 20 mm for foundation excluding the cost of centring & shuttering all work upto plinth level.
Dumping stones including casting stones in horizontal level.
Providing and laying 60mm thick factory made cement concrete interlocking paver block of M-30 grade made by block making machine with strong vibratory compaction and of approved size and design/shape laid in required colour and pattern over and including 50mm thick compacted bed of fine sand, filling the joints with coarse sand etc. all complete as per direction of Engineer-in-charge.
Centring & shuttering including strutting, propping etc. and removal of the formwork for foundation, footing and bases of columns
Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. complete 50 mm thick with 20mm nominal size stone aggregate.
Sand 04 Km by MT
Coarse Aggregates for 04 km by MT
Stone for 04 km by MT
Providing and Fixing Steel Sign Board
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.70 MB
BOQ_977903.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid