Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹16.3 L
EMD Value
₹32,700
Closing Date
5 Dec 2026, 4:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
EO
nagar panchayat seraikela
Construction of RCC drain with Slab from Vishnu Agarwal to Sumit Agarwal Hansahudi ward no-08 Under Nagar Panchayat, Seraikella.
2026_UDD_121217_1
Nit03/nps/2627/8
Open Tender
Civil Works
Percentage
nagar panchayat seraikela
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,000
₹32,700
21 Nov 2026
21 Nov 2026
7 Dec 2026
21 Nov 2026
5 Dec 2026
21 Nov 2026
120 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Site clearance by manual labour do do E/I. | 5 | Nos | 515 | ₹2,575 |
| 2 | Earthwork in excavation in foundation in hard soil and disposal of excavated earth as per specification and direction of E/I | 123.87 | cum | 263.44 | ₹32,632.31 |
| 3 | Providing coarse clean sand in filling in foundation and direction of E/I | 12.39 | cum | 697.24 | ₹8,638.8 |
| 4 | Providing designation 75A one brick flat soling joints filled with local sand -do-all complete as per specification and direction of E/I | 162.58 | sqm | 525.3 | ₹85,403.27 |
| 5 | Providing R.C.C M200 with nominal mix of (1:1.5:3) in foundation with approved quantity of stone metal (50mm to 25mm) size clean coarse sand do do E/I | 45.42 | cum | 8,140.24 | ₹3,69,729.7 |
| 6 | Providing R.C.C M200 with nominal mix of (1:1.5:3) slab to desire size with approved quality of stone chips and coarse clean sand do do E/I | 24.78 | cum | 6,836.13 | ₹1,69,399.3 |
| 7 | Providing Tor steel reinforcement cutting and bending 2.25kg/cft do do E/I | 5.58 | mt | 81,767.74 | ₹4,56,263.99 |
| 8 | Providing centering and shutteringincluding strutting propping etc and removal of form for foundation footing bases of column etc. | 671.99 | sqm | 254.4 | ₹1,70,954.26 |
| 9 | CARRIAGE CHARGE OF MATERIAL Sand | 45.01 | cum | 455.5 | ₹20,502.06 |
| 10 | Cement | 28.91 | MT | 606.4 | ₹17,531.02 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.25 MB
Tendernotice_2.pdf
PDF • 2.54 MB
BOQ_164012.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .