| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.2 LAccepted-AOC VILLAGE HINDWAN HISAR 125001 | HISAR | HISAR | HARYANA | 125001 | L1 | Accepted-AOC ok | |
| 2 | L2₹3.3 L+₹10,754.70 (3.38%)Rejected-Finance | L2 | Rejected-Finance ok |
Tender Value
₹2.5 L
EMD Value
₹5,000
Closing Date
17 Feb 2020, 5:00 pmClosed
EXECUTIVE ENGINEER
CCS HAU HISAR
repair of existing underground water harvesting pond and construction of pucca water channel making existing katcha water channel into pucca water channel at KVK Sadalpur
2020_HRY_117806_1
3131
Open Tender
Civil Works
Works
60 days
CCSHAU
Please refer Tender documents.
6 documents required · 6 mandatory
₹500
Executive Engineer C2
₹5,000
2 Jun 2020
10 Feb 2020
19 Feb 2020
11 Feb 2020
17 Feb 2020
11 Feb 2020
Amount
Loading , unloading for sand /earth. (HSR 4.1[a])
Disposal of surplus excavated soil with a lead of 3 K.M. excluding loading, unloading {HSR 5.2(b)}
Earth work excavation in ordinary soil exclusive of compensation of earth- {HSR 6.2(b)} (b) earth-work undressed with a combined lead upto 15 metres including breaking of clods
Earth work excavation in ordinary soil exclusive of compensation of earth- Lead When overall lead is upto 60 metres- (HSR 6.2[c]) (i) Extra for every 7.5 metres additional lead beyond 15 metres, but upto 60 metres by manual mean
Earth work in excavation in foundation, trenches, etc., in all kinds of soils, not exceeding 2 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil, clear from the edge of excavation and subsequent filling around masonry, in 15 cm layers with compaction, including disposal soil, as directed within a lead of 30 metres. (HSR 6.6)
Dismantling brick work, tile masonry or tile lining and tile terracing. (HSR 8.5[b]) (b) in cement
Scraping {HSR 8.32 (c )} (c) Cement plater
Cement concrete 1:8:16 with stone aggregate 40 mm nominal size in foundation and plinth.{HSR 10.28}
First class brick work laid in cement sand mortar 1:4 in foundation and plinth (HSR 11.4)
First class brick work laid in cement sand mortar 1:5 in first storey up to 4 metres above plinth level. (HSR 11.8)
Conglomerate floor 50 mm thick cement concrete topping 1:2:4 (HSR 14.10)
12 mm thick cement plaster 1:3 (HSR 15.4)
Cement pointing 1:3deep variety on brick and tile work (HSR 15.61)
Cement rendering on plaster 1 mm thick (HSR 15.75)
Double layer tile lining for water storage tanks, consisting of:- (i) 10 mm thick cement mortar 1:5 in sub-grade (ii) First layer of 3.81 cm thick tiles of 22.86 cm x 11.43 cm: laid in 1:5 cement mortar, as mentioned above (iii) Sand wiched plaster 1:3 cement mortar 15 mm thick (iv) Second layer of tiles, laid in 1:3 cement mortar, with 6 mm mortar over sand wiched plaster, including cost of dressing sub-grade, scaffolding and curing, etc., complete in all respects-{HSR 19.26 (b)} (b) on side slope
Single layer tile lining for water storage tanks, consisting of:- (i) Sand wiched plaster 1:3 cement mortar 15 mm thick (ii) Second layer of tiles, laid in 1:3 cement mortar, with 6 mm mortar over sand wiched plaster, including cost of dressing sub-grade, scaffolding and curing, etc., complete in all respects-{Based onHSR 19.26 (b)} (b) on side slops
Racking out joints in cement mortar (making zhiri in existing tile lining on sides slopes ) uprooting the grass and preparing the surface for re-pointing including disposal of rubbish with a lead of 2 K.M. complete in all respect as directed by the Engineer-in-charge. (NS)
Shree Ram Building Solution Services
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .