Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.9 LAccepted-Finance WAISHTING PINES RESORT BHOTLA SHIMLA DISTT SHIM A | SHIMLA | HIMACHAL PRADESH | 171001 | ₹4.9 L | L1 | Accepted-Finance Lowest |
| 2 | L2₹5.1 LRejected-Finance N A | ₹5.1 L | L2 | Rejected-Finance 2nd Lowest |
Tender Value
Refer Docs
EMD Value
₹9,900
Closing Date
28 Mar 2026, 10:00 amClosed
Executive Engineer kasumpti Division HPPWD Shimla3
Executive Engineer kasumpti Division HPPWD Shimla3
Widening and Improvement of road at Rd 21/300 to 21/370
2026_PWD_131985_4
SD-I-CTR-Tender-2025- 27243 dt 17-03-26
Open Tender
Civil Works
30 days
Shimla
As per SBD
12 documents required · 12 mandatory
₹350
₹9,900
1 Apr 2026
20 Mar 2026
28 Mar 2026
20 Mar 2026
28 Mar 2026
20 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Cutting and disposal of earth work in by mechanical in all heights and depths in all kinds of soils, including saturated soils comprising of pick work, jumper work and blasting work both in soft and hard rock with chiseling and wedging out of rock (where blasting is prohibited) and their intermediate classification of soils including, dewatering wherever required, setting of to the required lines, levels as shown on the drawing and directed by the Engineer -in-charge at site., according to the HP.PWD. specification of 1990 (one thousand nine hundred ninety) volume-I (one) and sorting out useful and unuseful material and transportation of the unuseful material for disposing at dumping site as per satisfaction of Engineer- in -charge through all modes of transportation including head load ,animal load or mechanical means along with its leveling fine dressing and with all kinds of labour, machineries, tools equipments and safety measures and incidentals necessary to complete the work by mechanical means and labour ( if required ). The recovery for stones, whether use full or not for 84.60cum (Eighty four point sixty cubic metre) @ 300/-only(Rupees three hundred only) per cubic metre shall be effected on prorata basis in all circumstances. All the surplus excavated earth to be dumped at dumping site(dumping sites will be arranged by the contractor on his own cost). Any loss to the public and private propriety, human being, machinery during the course of execution and disposal of serviceable and unserviceable materials shall be the absolute responsibility of the contractor and shall have to be duly compensated by him in all respects including all incidental charges. | |||||
| 2Disposal of muck excavated Earth /Removal of Slipes/ Malba/Similar unservicible, dismantle or waste materials by mechanical transport including loading, unloading & disposal up to all leads & lifts including arranging the dumping site at its own cost all taxes etc. The payment shall be made for dumping site by contrector for dumping site arranged by the contractor at private property or Govt. land as per the direction of Engineer-In- Charge. | |||||
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.16 MB
SBD495240.pdf
Tender Documents • 7.00 MB
BOQ_195177.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid