Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical NO 24 JAWAHAR STREET NEW FAIR LANDS SALEM 636 016 | SALEM | SALEM | TAMIL NADU | 636016 | Accepted-Technical satisfactory |
Tender Value
Refer Docs
EMD Value
₹2,500
Closing Date
23 Sept 2026, 2:00 pmClosed
SE GCC CBE
office of the Superintending Engineer, General Construction Circle, 182, Dr.Subbarayan Road, Tatabad, Coimbatore - 641 012.
Conducting Preliminary survey and detailed survey etc LILO of Erode to Pugalur 110KV SC line Section between Nadupalayam110KV SS and Kodumudi 110 KV SS at Kurukkathi 230 110KV SS
2026_EB_702499_1
ETS 26/26-27 of SE/GCC/CBE
Open Tender
Civil Works
Works
erode
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹2,500
Yes
7 Oct 2026
8 Sept 2026
23 Sept 2026
8 Sept 2026
23 Sept 2026
8 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing Light jungle and disposing off to a place away from the site as directed by the Engineer in charge including all Labour charges,T&Ps etc., complete. | 2,400 | M2 | - | - |
| 2 | Conducting reconnaisance survey, including ranging rod alignment including cost of all materials, transport of men and matierials, hire charges for survey Tools and Plants etc.,complete. | 3.76 | Km | - | - |
| 3 | Conducting detailed survey using total station for route alignment, taking levels and chainage, GPS co-ordinates and plotting the profile in the traching sheets using suitable softwares with suitable scales and submission of report, tower schedules, justification of angle points and profile in duplicate including cost of all materials, labour, lead, lift etc., | 3.76 | Km | - | - |
| 4 | Preparation of Route alignment with remote sensing and field verification in GTS map using 1:50,000 scale including procurement, proceesing GPS map, GEO referencing route alignment, integrate route in the Layout with identification of Reserve Forest, Developed area etc., including cost of all materials, labour, lead, lift etc., complete. | 3.76 | Km | - | - |
| 5 | Taking color printout of GTS route map in A0 size topo sheet in 1:50000 scale using GPS Co-ordinates including cost of all materials, labour all leads, lifts etc., complete. | 7 | No | - | - |
| 6 | Procurement of satellite image, procurement of required number of scenes as required for route from NRSA (Nationa Remote sening Agency) upto 3 KM or part there of including cost of all materials, labour, lead, lift etc., complete | 7 | Set | - | - |
| 7 | Preparing route alignment map using remote sensing method by processing of raw image obtaining from NRSA into 1:50000 scale TOPO sheet with identificaton of road alignment and identification of route alignment, integrating the route alignment, integrating the map and identification of reserve Forest Developed area etc., complete. | 3.76 | Km | - | - |
| 8 | Taking colour print out in Route map in AO size in 1:50000 scale for route alignment using remote sensing method including cost of all materials, labour, all leads, lift etc., complete | 7 | No | - | - |
| 9 | Conducting detailed survey with GPS, total station, DGPS, Plotting profile and tower spotting and profile in duplicate including cost of all materials, labour, lead, lift etc., complete | 3.76 | Km | - | - |
| 10 | SGST to be quoted in Percentage (value alone)Ex. 9%, it should be entered as 9 only | 1 | Percentage | - | - |
stage.html
html • 0.02 MB
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.09 MB
26S.pdf
Tender Documents • 0.50 MB
BOQ_844516.xls
BOQ • 0.45 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .